This conference call transcript was computer generated and almost certianly contains errors. This transcript is provided for information purposes only.EarningsCall, LLC makes no representation about the accuracy of the aforementioned transcript, and you are cautioned not to place undue reliance on the information provided by the transcript.

Vault Minerals Limited
1/31/2024
Thank you and good morning to everyone on the call today. On the call we have Richard Hay, Redfire's Chief Operating Officer and myself, David Coyne, CFO and Joint Company Secretary. As Mark Williams, REDD5 Managing Director and CEO, is committed to other external meetings on the east coast of Australia this morning, Richard and I will present REDD's Q2 results for FY24, referencing the slide deck that was released to the market this morning alongside the quarterly report. As explained by the operator, there will be time for Q&A at the end of the presentation.
moving to slide three please i'll now hand over to red five's coo richard hay for opening remarks and an overview of our quarter two results thanks david red five has three active mines at the koth open pit koth underground and dala underground with the ore being centrally processed at the koth hub which in the December quarter achieved significant periods of throughputs well in excess of 5.5 million tonnes per annum. Red 5 also owns a 3.25% royalty from the Siana Gold Project in the Philippines, and we note that the project's owners have announced receiver of their debt funding to advance mine development and production. Additionally, during the quarter, Red 5 was included in VanEck's GDX ETF, which is good recognition of Red 5's production scale and maturity. Moving to slide four. We are pleased to see the continued improvement trend in safety performance. Over the past 12 months, the TRIFA has reduced from 15.5 to 4.7 and the LTIFR has reached zero. Our operations leadership team continues to focus on activities to improve our leading indicator safety statistics, which we know ultimately over time has a positive impact on our lagging safety results. Production for the first half of FY24 was an excellent result, achieving 108,027 ounces produced at an all-in sustaining cost of $2,008 per ounce. with 53,018 ounces of gold produced for the December quarter at an AISC of $2,328 per ounce. The AISC includes a non-cash NIV expense on accumulated low-grade stockpiles of $132 per ounce for the first half and $267 per ounce for the December quarter. David will cover this aspect in more detail later. A strong first half year production from all three mines and the COTH processing plant has set Red 5 up for a strong second half and it has us on track to achieve the top end of guidance for the year. Moving on to slide 5. Mining of the COTH open pit made good progress during the quarter with a total of 3.41 million BCM moved and 1.37 million tonnes of ore mined at a grade of 0.74 grams per tonne, which included 851,000 tonnes at 0.97 grams per tonne of high grade ore. Access to the high grade ore in the Stage 1 pit floor is now fully established and very consistent, providing optionality to the business as to how fast we mine the high grade ore which is dependent on the status of the ROMPAD stocks. In stage two, we are ahead of our mining schedule with consistently good digging in the predominantly oxide waste of the upper benches. Stage two oxide material has been strategically incorporated into the planning schedule and stockpiled separately to supply construction materials for the TSF4 dam wall lift that is due to commence shortly. The Coff Underground completed another solid quarter, mining 244,000 tonnes at 1.8g per tonne. During the December month, a number of improvement initiatives culminated in a record 69,000 tonnes of ore mined from stopes in the Regal, West, East and Central areas. The mining contractor continues to perform well. meeting planned schedules despite some personnel shortages over the Christmas New Year period. Over at Darlow, the team continues to string solid quarters together, mining a total of 168,000 tonnes at an improved grade of 3.2 grams per tonne, reflecting a focus on higher grade stoves in the Boone West area and the completion of a large lower grade bulk stove in the prior September quarter. Air leg mining at Darlow made an improved contribution versus the prior quarter, mining 14,000 tonnes at 4.9 grams per tonne. The processing team at COTH posted a quarterly crushing record of 1.25 million tonnes and a record 1.24 million tonnes milled, having resolved some crusher reliability challenges in the first half of the quarter. A trial of a finer crushed product in the second half of the quarter was very successful, resulting in a record 519,000 tonnes milled for the month of December. This finer crushed size is now standard practice. The finer crushed product saw consistent days well in excess of 20,000 tonnes per day crushed and 17,000 tonnes per day milled. for a throughput run rate equivalent to well in excess of 5.5 million tonnes per annum. The finer crush product is now standard practice for the team, with the challenge of achieving a 5.5 million tonne per annum run rate throughout the second half of FY24. A mobile crusher was purchased by the company during the quarter, to assist with building a 150,000 to 200,000 tonnes of crushed ore stockpile to de-risk this section of the processing circuit. Metallurgical recoveries were slightly lower in the quarter at 91.2% as a result of reliability issues with the carbon regeneration circuit. Remedial actions have been put in place and should see recoveries rebound back to the expected run rate of around 92.5%. Moving on to slide 6. Darlow has proved over 2023 that it can consistently deliver positive cash flow and as a result the company has mobilized an additional jumbo to assist in opening up the D'Arcent and other areas together with a diamond drilling program designed to de-risk the FY25 and FY26 mine plans. A total of 11,748 metres was drilled in the first half of FY24 of a planned program of 17,500 metres. This program is very likely to be extended based on the success we are seeing to date. The DALO drilling results shown on this slide contained in our November 2023 announcement, Highlight the ongoing strong potential for additional conversion of mineral resources to ore reserves to extend the mine life past FY26, as well as de-risking areas earmarked for mining in the FY25 and FY26 years. And now over to Dave.
Thanks, Richard. And on to slide seven, please. 53,087 ounces sold at an average realised price of $2,619 per ounce, yielding almost $140 million in sale proceeds to underpin another solid financial quarter for the company. Total operating and capital expenditure for the quarter has decreased marginally from the prior quarter from $120 million down to $117 million and resulting free cash flow for the quarter is approximately $23 million. A key focus for us during the quarter was on implementing methods to reduce consumption of diesel when equipment is idled. But pleasingly, we're starting to see some positive effects from this in terms of behaviours and an overall reduction in diesel costs. As operations across all three mines and the process plant continue to perform well, we are increasingly turning our attention to improved efficiencies and cost optimisation activities, such as extending durations between mill relines, tendering for a longer term supply of key services and materials and the like. All of this is placing Red 5 into a solid financial position, opening the window to replace the current project finance debt facility with a more appropriate corporate style facility in the coming months. On to slide eight. Strong gold production and management of our costs has enabled us to progress our strategy of accelerated debt repayments. with $10 million of bank debt repaid in the quarter being a combination of both scheduled and voluntary repayments. At the end of December, Bred had $102.8 million in outstanding bank debt and $53.3 million in cash and other liquid assets, resulting in a net debt improvement to below $50 million of $49.5 million. Most importantly, though, we are on track for our goal of refinancing in calendar year 2024. Some key activities for the second half of the 2024 financial year are continuing to deliver on our target of safely, profitably and strengthening our balance sheet. Areas of particular focus are further progressing of the King of the Hills Stage 2 cutback, On to slide nine, please. In our quarterly activities report released this morning, we announced a change in our policy for run of mine or inventory costing. It's pragmatic for the company to periodically review the accounting policies that underpin its financial results. The review of the inventory cost methodology highlighted the need to change the basis of our current and future processing costs were apportioned from an accounting perspective. This change puts a greater proportion of processing costs onto lower grade ore than what was applied under the previous methodology. The net outcome of this change is the recognition of a net realisable value expense that unwinds part of the cost credit to the all in sustaining cost. The half year outcome for ROM inventory movement still remains as a cost credit to AISC, however, and we expect the half year cost credit will be a better indication of future inventory movement cost credits to AISC going into the future. I think it's important to recognise that this has no cash flow impact and does not change our FY2024 guidance range of $1,850 to $2,100 per ounce. The company will continue to build its low-grade ore stockpiles into the future and our mine plan does not see us needing to utilise this material for some time. This means that this asset will be classified as a non-current asset on our balance sheet for the foreseeable future. I'd now like to hand back to Richard for some concluding remarks.
You're reading a preview of the VAU.AX Q2 2024 earnings call.
Free account.