This conference call transcript was computer generated and almost certianly contains errors. This transcript is provided for information purposes only.EarningsCall, LLC makes no representation about the accuracy of the aforementioned transcript, and you are cautioned not to place undue reliance on the information provided by the transcript.

Amaroq Ltd
11/12/2026
In the central zone we drilled last year approximately 5000 meters where we intersected on average 3.3 meters thickness of an ore body on average 10 gram per ton. So extremely good thickness. We only went down to about 70 meter depth. This year, due to the shape of the ore body there, we wanted to infill drill that area. That means we drilled on a tighter spacing. We then also drilled deeper and then we started stepping out, step out drilling to extend that central zone several hundred meters in each direction because this is outcropping mineralization. Now, the reason for that is that we have to understand very quickly the geometry of ore body prior to us starting to mining it. Once we understand the geometry, we then understand the drilling pattern we have to do for these other lines on site. We plan to have a mating resource as early as Q1 this year. We're waiting for the assays to come back. They are now in transit over the Atlantic Ocean, and so we are excited to bring that to the market. We did a map sample. Map sample means that we tested the ore on surface that we found there in a lab to see if that ore could be processed in Nalumat. That showed really positive results where we're getting recoveries all the way up to well above 95% recovery with this ore in Nalumat. Subsequently, we started building a road and a port facility both to be able to access the ore depositors with and many others. We also have the possibility to set the location up for bulk sample, which we can then move from this location to Nalona and start running that ore through the Nalona plant. Now, to be clear, we only started on the port facility and we've done the first a few hundred meters of the road and we are now doing assessment waiting for the resource statement prior to us doing more work than next year or in the years to come but we very much see us being able to leverage off the infrastructure in NALNAC and that is a study we are now doing to see how can we grow the production in NALNAC effectively expand the plant in NALNAC with more ore from NALNAC and ore from NALNOC while we grow this resource into, hopefully, a world class deposit. Black underneath is the Marmor Illygeria. I want to highlight the string of pearl concepts here. Again, this is based on the task producing mine in Black Angel. So what you see on the picture is Angel cover and banana. Over this area, about more than 11 million tons were mined over 17 years. This was the most profitable mine that Greenland has ever had. It was one of the highest grade zinc lead silver mines in the world, operated by Tech and later Boletan. Now, the glacier, which is a light blue shade there on the picture, covered all of these dark blue areas there, which are the lakes which are going from Myers all the way to Garp. Now that glacier has retreated back and on this part there are Myers, Glacier, Garte, Ask, that these are outcrop on surface as you can see on the picture there on the right. Glacier has been drilled only short at that and then haven't been drilled fully at strike so that glacier deposit is now approximately two million tons can be expanded in our opinion rapidly. and also in the Archangel. Archangel has the potential to be larger than the whole old Black Angel mine where previously they mined 11 million tons. There are holes there that go through seven meters of zinc lead silver that are more than 40% zinc lead silver. In Nørngrut we have an ore body that can be expanded, in Maies, Vest, Apt, all of these areas can be expanded. We believe that even though the resources there today are about 3.7 million tons, that we could be looking all the way up to 20 million tons of potential here, which we can then build up. And the whole idea here is to leverage of the current infrastructure, where we have the harbour and the camp, and update the tunnel there from existing tunnel you see on the picture, then set up a road towards these string of pearls and to a tunnel into Archangel and Archangel effectively giving us access to multiple ore bodies to be able to produce hybrid zinc lead silver in the future. We will deliver the market this concept in more detail through a study that we are now preparing for the studies and we'll update in due course. Thank you.
Thanks, Eldur. I'll take you through the financials, starting with the income statement. Revenue for the third quarter was 65.4 million, generated from sales of 11.1 thousand ounces of gold. This brings revenue for the first nine months of the year to 121.6 million compared to 16.3 million in the corresponding period last year. This increase reflects the continued ramp up at Nalunag with higher gold sales volumes alongside the strong gold price environment. Following the commissioning of the flotation circuit at the end of Q2, recoveries have increased and we are now selling both gold dory and gold concentrate with our first export of flotation concentrate completed during Q3 as Eldur mentioned. Our average realized gold price during the quarter was strong at $4,184 per ounce. Growth prompted of $45.6 million in Q3 and $80.5 million for the first nine months, demonstrating the strong cash cost margin Malanac is capable of delivering as the operation continues to wrap up. This translated into an operating profit of 26.6 million and net income of 24.4 million for the quarter. For the first nine months net income was 38 million compared with a 15.4 million dollar loss in the prior year period. Moving to costs, exploration and devaluation expenses, they increased in the quarter to 9.8 million. This reflects The largest component is our approximately five kilometer drilling program at NALNOC, which is now complete, alongside continued activity at Marmorillik. Currently, all exploration expenditure outside NALNOC is expensed. I just wanted to note that projects such as NALNOC and Marmorillik predominantly advanced through exploration and potentially into development. The nature and accounting treatment of some of that expenditure may change over time and that would naturally affect this line item. G&A was 8 million in the quarter and elevated this quarter. Part of that is due to the uplisting project which we completed in the end of July when we moved to the London main market. and we are also seeing the impact of increased activity across the wider portfolio, which is always peaking in and around Q3. That includes NAMROC, One More Lake, SULIAC and GARDAC. For GARDAC, we already have a management fee structure in place that upsets some of the corporate costs of supporting the project, but that income appears separately further below within other income. You see that towards the bottom, rather than reducing the GMA line. As these projects continue to grow, we will look at similar structures for other projects and subsidiaries and make them more operationally independent so that costs will increasingly be allocated to the projects they support rather than remaining within the corpus G&A. Turning to the balance sheet, we ended September with 51.5 million of cash. So a solid liquidity position while continuing to invest across the business. Inventory also increased to 38 million including 22 million of metals inventory and this is a reflection of ramp-up introduction with more inventory moving through the system as well as some seasonal build-up of supplies ahead of the winter period and the normal timing between production, shipment and final settlement. The largest movement on the asset side continues to be on capital assets. They increased to 315 million, reflecting the significant investment we continue to make in bringing Nalovac into production. On the financing side, worth noting here is that loan payables, they increased to 102 million. This primarily reflects the full drawdown of our up-sized two-year RCF. that we secured in the second quarter. And overall, we entered the quarter with a 68% equity ratio and no current loan balance. And moving to cash flow, I'll draw your attention mainly to the middle column, which shows Q3, and we generated 21.4 million of operating cash flow during the quarter, driven by higher gold sales and first concentrated shipment. more than covered the 14.6 million of investment during the quarter. We see now also that this investment spend is ratcheting down. It's down from around 22 million per quarter in the first half as the main construction program winds down at Nalunak. Q3 spend was more focused on site infrastructure, winterization and efficiencies. Financing contributed a further 16.5 million, principally from the RCF drawdown, which we made in August. So overall cash increased by 23 million during Q3, ending the quarter at 51.5 million.
Back over to you, Edvin. Thank you. Now, guidance versus nine-month actual. So in gold production, we're on guidance. We've guided 25,000 to 35,000 ounces, and we are going to focus on coming in the mid-range of that guidance for this year. Average free trade is higher than we've guided. It's been on average 21.6 grams per tonne. In relation to gold recoveries, on average throughout the whole year, we are at 73%. During this quarter we've been as high as well above 90% and for an average we've been around 85%. Null and cash costs within guidance are 30 million point six and we maintain guidance for the full year as well. Null and ASICs we also maintain guidance for this year between 60 and 73, we're currently at 50. And gross capital again we are within guidance there as well. Everywhere within the operation, we are within guidance. For Outlook, production continues in line with guidance. We're confident in the mid-range of 25 to 35,000 ounces. and we continue producing and developing the work around what we're doing in Alna. For Marmorillik project studies are progressing with a group called WSP and time for reference has been submitted for which is a key document to the government of Greenland prior to us starting the process of applying for an exportational license. In Gardaik, asset results from Illua and Mintern are going to be in the next two quarters arriving to the market from the highly prospective Mintern and Illua. On Sjuljerg, we continue acquiring assets that support our operation in-country. Sjuljerg is our service company. We work in corporate development and are in the middle of our financing process there. With regards to Nanoc, we are targeting a maiden MRE in Q1 2027 and then we are operating or developing an approach to do a project study or potentially a PEA for increased throughput in Nanomag supported by or from Nanoc and Nanomag targeted as well in Q1 2027. I think this gives you a good idea of what the progress is. We're really pleased with the quarter. This shows the market that you can mine profitably in Greenland even for relatively small operations such as NALNA. This gives a very good basis for our 3x3x3 strategy where from mid to end of next year we intend to build Nanok to support increased throughput in Nalunak. We intend to start building Marmarillik to be in production three years later so this gives an increased three cash flow and development and more legs to the stool of the Amroq story alongside us developing work class deposit within the Karadag company which we own 51% and underpinning all of this work we are doing we have this we have the servicing company Zuliek that provides equipment, consumables and other things which are desperately needed now in Greenland Due to the fact, like we have always said and we are continuing to say, the main bottleneck could have been for us that we didn't have the equipment to do work in Greenland because in the last one and a half year more than a billion dollars have been raised for projects in Greenland and therefore things like everything from helicopters to boats to drill rigs are not available to many operators except us because we set this company up. So this gives you effectively three minds, three companies and from the end of next year over three years strategy. Thank you.
You're reading a preview of the AMRQ Q3 2026 earnings call.
Free account.
Want transcripts like this in your own app? Try the Earnings call API, or read the transcript API docs.
Use this data in your own app
Pull this call's transcript, audio and slides with the Earnings call transcripts API.
See pricing