spk11: to assess expected project timelines. Secondly, we are encouraged by the continued strength in our win rate this year, largely driven by our focus on strategic customer engagement and innovative and differentiated product offerings. Outside of the U.S., we also remain encouraged by our positioning in international markets. For instance, greener consultancy data recently confirmed that Array boasts the leading market share for distributed generation projects in Brazil. In Europe, while overall market demand has been modest, we are confident that our targeted customer activities will continue to support share growth in the coming quarters. To that end, we will continue to set ourselves up for success to support growth in 2025 and beyond and to navigate near-term challenges to the best of our ability. Moving to slide 5, I want to specifically cover the current U.S. market dynamics we're seeing. In 2024, we've talked at length about the various project push-out elements with which our customers have had to contend. Looking to the future, we believe some of these dynamics may be more persistent challenges, while others have opportunity to incrementally improve as we head into 2025. The more persistent headwinds that customers will continue to navigate include permitting and interconnection delays, shortages of high-voltage circuit breakers and transformers, and EPC labor constraints. Although there is much discussion around interconnection queue regulation and permitting reform, we believe that in practice, it will take some time to implement these changes to move projects along at a more normalized cadence. Similarly, with long lead times for electrical equipment, although customers are seeing early signs of improvements in these lead times, the industry will need time to build out additional manufacturing capacity for these components. That being said, we are optimistic that there are a number of factors that have the potential to facilitate incremental improvement in project timing as we move forward. The first factor encompasses the more favorable financing environment due to the Federal Reserve's interest rate cuts. Additionally, final clarity on ADCVD tariffs should allow projects to advance with more certainty. While we have commented in the past that we believe these tariffs negatively impact the industry as a whole, the biggest factor in ADCVD-related delays is related to the uncertainty surrounding the total cost of solar panels. Once developers understand the total tariff-related costs associated with specific panel selections, they can better plan their overall sourcing strategies to optimize overall project costs and returns. The preliminary determination on anti-dumping tariffs is scheduled to be issued later this month, which should help customers with their evaluations. Further clarity around IRA incentives also assists industry participants in understanding their total project costs. We were pleased to see the final 45X rules released in October, as this represents long-term support for domestic manufacturing initiatives. Specifically for REI, the 45X tax credits are helping us increase our domestic production and onshore critical components and good-paying jobs through our new Albuquerque manufacturing facility. Although the final rule did not broaden the category of structural fastener to be inclusive of our clamps, as we had advocated, we are still pleased that 45X is more solidified. As a reminder, our 2024 guidance did not assume clamps would be included in the definition of structural fastener. Under the final rule, we continue to recognize credits for our clamps under the current longitudinal Perlin definition within the Torque Tube 45X guidance. On domestic content, Treasury anticipates releasing updated guidance before the end of the Biden administration to update the elected safe harbor data, make additional technical clarifications, improve accuracy, and more. We feel that this additional guidance will be helpful for our customers pursuing the domestic content adder through the elected safe harbor table. We currently have a significant portion of our domestic order book evaluating domestic content, so we view further updates to this guidance as very impactful for project considerations. Finally, we remain confident that solar maintains bipartisan support and would note that our industry performed well under the first Trump administration. We have discussed at length how utility-scale solar incentives in the IRA are creating good paying jobs and opportunities for both Republican and Democratic districts alike. Notably, there is growing bipartisan support for protecting the energy tax credits portion of the IRA as evidenced by a number of House GOP members requesting Speaker Johnson to exclude these provisions from any repeal effort. The domestic content bonus credit in particular is a critical component of the legislation that strengthens domestic manufacturing while accelerating the deployment of clean energy across the country. Overall, there are many challenges and opportunities that customers are currently navigating in the market. However, it's important to note that we see the U.S. market stabilizing, not worsening, from the level of customer pushouts we witnessed at midyear 2024. Now, I'll turn it over to Neil to speak about some exciting product and commercial updates.
spk09: Thanks, Kevin. Moving to slide six, I'd like to spend a few moments talking on the recent announcement of our 77 degree tracker in the context of our broader innovation track record as shown here. With the rising frequency and concern on hail damage in the industry, IRAs responded to the challenge with the introduction of the steepest stow angle for protective hail stow in the industry. This new offering will feature our proven door track and omni-track design as enhanced by our IRA's SmartTrack Hail Alert response software. This tracker provides unprecedented flexibility and protection from against both hail and wind, significantly reducing the risk of damage to our solar site. Providing our customers with the best solutions to reduce the risks imposed by extreme weather events remains one of our top priorities and drives many of our innovation efforts. To put our track record in context, in 2015 we first introduced passive windstow capabilities to our door track products, providing our customers with the premier solution to mitigate stress from high wind loads and we do this while providing up to 4% increased energy production when compared to active snow protocols provided by our competitors. Our passive windstow technology, which relies on one of IRA's key differentiating patents, allows for individual roads to move to high tilt when a wind threshold is exceeded through a clutch in a gearbox. This allows the net torque to move the road to a predetermined tilt position. Oftentimes, this results in exterior roads moving to the stow position while most interior roads continue to track normally. This unique architecture allows for higher energy production than competitive offerings. Earlier this year, we introduced Hail Alert response as part of our SmartTrack suite of controller and software solutions. Hail Alert response is integrated with third-party weather services to move all roads at a site to a maximum defensive tilt position, away from the direction of the storm's wind at a predetermined timeline. Moving the modules to a high tilt reduces the kinetic energy impact on a module from hail and significantly reduces the risk of damage of glass breakage and cell cracking. In the third quarter of this year, we launched our Skylake architecture, which works with the existing door track and omni-track solutions. Skylake provides an eight-row string-powered solution featuring DC motors and ZigBee wireless communications. Rated to operate down to minus 40 degrees Celsius, Skylake provides continuous power to the array to facilitate seamless operation, even when there may be an interruption to grid power due to weather impacts in the area. And importantly, Skylake does not require the reuse of batteries to do so. Finally, before year end, we'll be launching our automated snow response, another solution available as part of the SmartTrack software platform, which uses on-site snow sensors to move roads to high tilt to dump any accumulated snow, reducing the risk of stressing the modules due to high snow loads and eliminating the risk of ice formation on modules as snow melts and refreezes. Investments in utility-scale PV sites are significant, and array will continue to develop solutions to protect these investments from damage, experience, and severe weather events. Damage from hail and other extreme weather events only represents a small number of the total volume of insurance claims within our industry, but these claims represent more than half of the financial damages incurred. It will be critical to provide continuous enhancements and solutions to mitigate the risk from extreme weather to alleviate insurance concerns and protect utility-scale PV investments. And I'm happy to say that we've received well over 300 patents since 2015 that validate and protect the innovative solutions delivered by our team. Additionally, the RE Plus conference in September provided a fantastic forum to receive feedback from our customers on our latest product offerings. Many were eager to learn more about our 77 degree tracker in light of increased snow requirements by insurers for sites in hail-prone regions. Skylink has also been very well received since its launch, with numerous customers praising the design flexibility and site layout advantages the product provides. Skylink architecture opens new markets for array, and in fact we're thrilled to announce that they've already won an order for Skylink in early Q4. With that, I'll turn it back over to Kevin to give a more detailed update on third-quarter financials and full-year guidance. Kevin?
spk11: Thanks, Neil. Moving to slide 8, I would like to start off by providing some additional details around the third-quarter results. As I previously mentioned, we delivered revenue within our guidance range of $231.4 million, which was down 34% from the third quarter of 2023, largely due to the project push-outs we've experienced this year. We experienced both declining volume and ASPs -over-year in the US and international. Sales in North America represented approximately 70% of our revenue for the quarter, with the remainder of our revenue coming from international locations. We achieved third-quarter adjusted gross margin of .4% and improvement of over 900 basis points -over-year. Operating expenses of $211 million were up approximately $164 million from $47.2 million during the same period of the previous year. This increase was driven by a $162 million non-cash goodwill impairment charge related to the 2022 FTI acquisition. The goodwill impairment charge was triggered by the sustained decline in our stock price in the second half of Q3, resulting in a decrease in market capitalization coupled with an update to long-term projections for certain markets for the FTI operations. Adjusted EBITDA was $46.7 million, representing an adjusted EBITDA margin of 20.2%. This compares to adjusted EBITDA of $57.4 million and adjusted EBITDA margin of .4% in the third quarter of 2023. On a gap basis, net loss attributable to common shareholders in the third quarter of 2024 was $155.4 million compared to net income of $10 million in the prior year period. Basic and diluted loss per share was $1.02 compared to basic and diluted income per share of $0.07 in the same period last year. Adjusted net income was $26.5 million versus $31.7 million during the third quarter of 2023, and adjusted basic and diluted net income per share was $0.17 compared to $0.21 during the prior year period. Finally, our free cash flow for the period was $43.9 million versus $69.4 million for the same period last year. Now I'd like to go to slide nine and provide a more detailed update to our full year 2024 guidance. As we addressed within our guidance revision last year, we carefully contemplated a number of different project timing scenarios that could occur within our customer base. Although we did see some projects shift to the right in Brazil due to continued real weakness impacting PPA negotiations, which resulted in the narrowing of our top line guidance range to $900 million to $920 million, this was certainly considered within those potential outcomes. To be clear, we only continue to see some project pushouts, not project cancellations, and we feel some customer challenges have abated since the accelerated level of pushouts we witnessed at the midpoint of the year. Notably, within our domestic business, we have not seen our U.S. projects shift substantially from our expectations in our last guidance revision. We are lowering our adjusted EBITDA and adjusted net income per share ranges slightly, given a combination of changes in overall project mix within the narrowed top line guide and increased strategic investments and additional non-recurring expenses. We are anticipating record annual adjusted gross margin of approximately 34% for 2024, largely due to the torque tube and structural fastener 45X benefits we've been able to realize. As a reminder, 2024 represents a transitional year for 45X, with some benefit catch-up recognized this year related to 2023 shipments. Additionally, within the framework of our updated guidance, we are now expecting adjusted G&A expense to be between $138 million to $140 million, which is reflective of some increased non-recurring charges and strategic investments we are making as we look to 2025. We are now expecting a reduced 2024 effective tax rate of 20% to 21%, excluding the Goodwill Impairment Charge, given our latest anticipated regional income mix and some additional &D-related tax credits. Finally, we are pleased to raise our free cash flow guidance to $100 million to $115 million from the prior guidance range of $60 million to $100 million, given our enhanced focus on working capital improvements to close out the year. As I've mentioned, we continue to anticipate a growing, highly profitable cash-generated business as we move into the year ahead, and I'm incredibly proud of the team's efforts on these fronts. Finally, before opening the line for questions, I want to provide a brief update on our CFO search. We mentioned last quarter that we were in the process of a very thorough vetting of an impressive initial slate of candidates. After extensive interviews and reviews, we're pleased to have entered the final stage of this process. While we can't disclose more details at this time, we are confident that we are near the goal line. In conclusion, as I look at the opportunities for our business in the coming years, I'm feeling very encouraged and proud of our employees who have dedicated their time and efforts to set up the company for future success. We will continue to manage the elements within our control by focusing on our business momentum, customer engagement, product innovation, and operational execution as we move forward. With that, we will now open the call for questions. Operator?
spk03: Thank you. At this time, we will be conducting a question and answer session. If you would like to ask a question, please press star and then 1 on your telephone keypad. You may press star and then 2 if you would like to remove your question from the queue. Please may I ask that all questions be limited to one question per analyst.
spk04: Please hold while we pull for questions. The first question comes from Julian DeMullen-Smith from Jeffreys. Please proceed
spk03: with your questions, Julian.
spk02: Thank you, Operator. Good afternoon, team. Thanks so much for the time here. I just wanted to follow up a little bit on the comments with the $2 billion backlog here. Can you comment a little bit on the cadence of that realization? I mean, Kevin, you'd spoken on that, I think it was last quarter here. Any updated thoughts on the realization? I mean, obviously things are moving in and out here. I imagine there's probably been some level of delays and push-outs still. So how is that coming together here as you think about the revenues through $25 billion, if you will? And how are you seeing that mix evolve in terms of both layering in versus push-outs, if you will, within that $2 billion?
spk11: Yeah, thanks Julian. Great question. I can say first of all, in the last quarter's call we had to talk about that very acute period that was a period of four to five weeks where we had a number of projects push. And the only thing reflecting back on that that I could put that to is that we had our customers evaluating their second half of the year plans and making their updates and getting more realistic with their own forecasts and plans. Because once we got through that period, the business very quickly returned to what I would call a normalized level of push-outs and delays. Meaning, look, in a project business you always have push-outs and pull-ins. And that cycles much more of what we saw as the quarter progressed. Back to a normalized level, some projects pulled in. Certainly we saw some pull-ins domestically, a couple of push-outs internationally. But back to that very normalized level of cadence that we've seen and that we've always had historically. So I think the commentary regarding last time where we said about 80% of that backlog was due to convert between the end of Q2 and 2025, very consistent. It's probably gone up a couple of percentage points, but that would be a very consistent number. And the difference there, and we want to make sure we still communicate, is we're still going to be booking orders for 2025, certainly this quarter and for a couple of more quarters. So we feel really good about our 2025 at this point. We feel good about being able to put up strong growth. And again, that's strong growth without a lot of go-get left in the operating plan if you think of it that way. So this is stuff that's already in our backlog that we'll be executing to. So we feel really good about what's shaping up for 2025 for us.
spk02: And Kevin, just to clarify that last comment there, you talked about the 80% being intact. Is that over, quote, six rolling quarters, or is that kind of an -to-apples basis for the same period that the total revenue implied for 2025 is still kind of comparable as
spk07: far as the backlog goes?
spk11: Yep, it's -to-apples.
spk07: All right, awesome. So holding tight. Thank you very much. A little bit higher even. Okay, excellent.
spk04: Thank you. The next question comes from Mark Strauss from JPMorgan.
spk03: Please proceed with your questions,
spk14: Mark. Yeah, good evening. It's Drew on from Mark. Thank you for taking the questions. I kind of want to follow up on that and appreciate the encouraging commentary on 2025. But can you just talk a little bit what's giving you confidence in these projects realizing and happening in 2025? I think maybe as you hinted on that interconnections may not be getting better as you might have hoped previously. And maybe just anything you can say on what is giving you the confidence that the project push-outs are going to alleviate somewhat into 2025.
spk11: Well, I think to be clear, I think there will still be some level of push-outs and pull-ins back to kind of what we would say is our normalized cadence. The difference in our 2025 set up from our 2024. If you think about in 2024, we still had at the beginning of 2024, we had in our operating plan a level of go-gets that we still needed to convert in to deliver the back half of the year. And as we look at our 2025 plan, it's all in our backlog already. So that needing to convert additional business is already converted in our backlog. Plus a few more quarters of bookings make us feel pretty good about what we see in 2025. I think most of the market is now able to contend with some of the long lead time equipment, some of the labor shortages. And I think as we're getting closer to our customers and really validating their go-forward plans and their project timelines, we feel better about the set up for 2025 certainly than we did coming into 2024.
spk14: Okay, great. Thanks. And then just one other. On the SDI right down, can you just kind of talk about what went into the longer term outlook being revised there? I mean, maybe what markets, what's changing and what's been different than you would have expected a year or so ago?
spk11: Yeah, let me – we have James Chu with us, our Chief Accounting Officer, and this is his real area of focus. So let me turn it over and ask him to give you a really great answer here.
spk13: Yeah, thank you. Thank you, Kellan. Julian, I think just looking at the Brazilian market that we participated in and recently experienced accelerated evaluation of the Brazilian real, that really triggered for us to look at. If you look at the volume, look at the pricing, it stayed the same. When you have a weaker real, when it translated to US dollar, you're going to have a lower revenue. I think that will trigger this. So in addition to kind of a market capitalization, so that's kind of triggered the rejuggling a little bit in terms of outlook or the projections for the outer years.
spk07: So that's one of the triggering events. Okay, thank you. Sure, you're welcome. Next question.
spk03: Thank you. Thank you. The next question comes from Brian Lee from Goldman Sachs. Please proceed with your questions, Brian.
spk12: Hey guys, good afternoon. Thanks for taking the questions. I guess on the 25 outlook, talking about strong double digit growth, that's encouraging to see. Can you give us a sense, Kevin, you've done a good job throughout the year talking about volumes up, volumes down, price, etc. So as you think about the outlook here for 25, it sounds like you're pretty optimistic. How does that shake out between US, international, and then kind of what's your baseline thinking around the pricing on a -on-year basis to get to the strong double digit growth view?
spk11: Yeah, so look, we're not really going to guide 2025 today, so I want to be careful I don't go too far in discussion. But I'll say what makes us feel good about those numbers is that that's already coming out of our backlog. So if you think about just looking at our backlog and the guidance we've given you, and if you do the math, you see that there's already strong double digit growth already sitting in the order book already scheduled for delivery. And frankly, a lot of that we feel really good about in that, as I mentioned earlier, it's not about a -to-fill gap. This is already in the order book, already in our SIOP process, already planning for deliveries next year. So we feel really good about the visibility we have now to that. Look, we don't have any help in that from higher pricing of steel. In fact, it's not. And remember that these orders in our order book that are shipping would have been booked in the last three to four quarters that we'll be shipping next year. So those price points and those margins, we feel good about. They've been consistent with those expectations we've set on every call to date. So we feel pretty good about the setup for next year in terms of volume, margin, operational gearing, and the investments we're making primarily on the front end of our business to even
spk06: further the acceleration.
spk07: Okay. Topic. You started the year out high 30s. And you're raising the gross margin view for
spk12: the year.
spk07: Back
spk12: into the matter, you're kind of going to be in the low 30s exiting the year. And you made the comment that some catch-up credits that kind of skew the numbers at least for 24. So as we think about the Q4 run rate, let's say you're in the low 30s, is that kind of representative of the average you're seeing in your current backlog? As you said, these are bookings with price points over the past couple of quarters. Is Q4 kind of reflective of the run rate you'd be seeing going into 25? Thank you, guys.
spk11: Yeah, sorry. Again, I'm going to be careful. I'm not ready to guide margins for next year until we thoroughly get through our AOP process project by project and what have you. What I will say is that in Q4, obviously sequentially you'll see a slight dip in margins, but that's more primarily related to one large order off an old VCA that certainly I inherited from 2021 that is a very low margin VCA. And whenever we have large orders come against that VCA, it negatively impacts our margins. So that's really what you're seeing in Q4. I would say it's a bit of an anomaly, but we're not ready to guide yet margins for next year until we get through our operating process.
spk04: Thank you. The next question comes from Jordan Levy from Truist
spk03: Securities. He's busy with your questions, Jordan.
spk16: Afternoon, all, and thanks for taking my questions. I just wanted to see maybe just following on the last question you had. Is there any timeline you can give on sort of how far out that VCA extends and then maybe just as sort of a follow on to that, if there's been any kind of additional shifts in VCA structure versus EPC contract?
spk11: No, I think this is actually the only one remaining fixed price VCA contract that we have in the company. It was signed in 2021. It extends through 2026, and there's probably a couple of more projects we'll ship between now and the end of the VCA against
spk07: this that are lower margin.
spk04: Thank you. The next question comes from John Windham from
spk03: UBS. Please proceed with your questions, John.
spk18: Perfect. Thanks for taking some time for the questions. I just wondered if you anticipate any potential changes in customer behaviors in ordering given the risk under the new administration and their attempts to potentially try to safe harbor. Thanks.
spk11: No, I think it's too early to tell on that, right? You know, certainly like you, I've read every possible note in the last 48 hours of what different customer behaviors may evolve, be it acceleration or delay. And we truly don't have a good view of that. It's just far too new, far too fresh for that. We'll be ready to serve our customers in any way they need to be served. We can certainly accelerate given our strong domestic supply chain. If that's what they choose to do, we're ready to help them do that. I think the biggest thing that will determine the cadence of customer orders is clarity around domestic content and clarity around the ADCVD tariff rates. That's what we've continually discussed as being the elements that are causing pause. Again, we expect these to get cleared up by the end of the year. So we feel pretty good about the
spk07: cadence as we exit the year into next year.
spk04: Thank you. The next question comes from Philip Shen from Roth Capital Partners.
spk03: Please proceed with your questions, Philip.
spk08: Hey guys, thanks for taking my questions. First group of questions is around bookings. Can you share what the gross bookings were in Q3? Do you have any de-grossing or de-booking? And then how do you expect bookings to transition or be in Q4? And then we calculate about $230 million for bookings for Q3. So does that sound about right? And then the second group of questions is around Brazil. Can you share how much of your latest backlog is for Brazil? Thanks.
spk11: Look, what we've said pretty clearly is that our order book remained flat at $2 billion, Bill. Order activity and projects awarded were slightly muted in the quarter given the uncertainty around the election and also ADCVD rates. I think what we're most excited about is that the overall pipeline of opportunities in the U.S. looking at it year over year is over three times larger than it was this time last year, which is incredibly significant. The kind of what we call the higher probability pipeline over two and a half times larger, so we feel really good about that momentum. And the fact that our win rate continues to be higher than our historical market share. We're winning orders with customers that we hadn't seen orders with in over two years at this point. So we're excited about the momentum we have with historical low share of wallet customers. We're excited about winning with customers that we hadn't in some time. We're excited that Omnitrack is now over 20% of our backlog and continuing to accelerate. And we're particularly excited that we won our first order of Skylink early in Q4 with again a targeted customer that we had not received an order in over two years for. And the Skylink in particular solved this customer's problems they needed on a site -a-vis quick installation, less cabling, all of that was a perfect fit that opened up a new geography to us with a new targeted customer. So we're excited about the momentum we're seeing on the front end of our business. Your second question was on Brazil and what in particular?
spk08: Which of the backlog is Brazil? Thank you.
spk11: I don't think we have not
spk07: historically broken out backlog by region. Not
spk05: a metric we provide. Okay, thank
spk04: you. Next question. The next question comes from Dimple Gossai
spk03: from BOFA. Please proceed with your question.
spk01: Hi there. Thank you for taking my question. Can you speak a little bit about the final manufacturing guidance that came out where it seems that additional components didn't quite change for qualification and what's kind of included in your margin guide there? To some extent I think there was some level of optimism that more components could qualify whereby you qualify for the $2.28 per kilogram versus the 87 cents under new definitions. So if you could just give some more clarity there that would be really helpful. Thank you.
spk09: So I'll take that one. So this is Neil. And this is me, excuse me, around domestic content. We feel really well established from domestic content perspective. We announced in Q3 of last year that we were able to provide 85% or better domestic content. So really not a big lift to get to 100%, which we've already announced that we'll be capable of shipping in the first half of 2025. Now as a reference to Table 1 from our capability to provide that, that gets into a number of components. As I mentioned before, we're really well suited to already providing many of those from domestic sources already. And we're working with a few suppliers that were not fully domesticated to be ready for that Q1, that first half of 2025 target. We're not in a position where we're going to break out margins specifically for domestic content versus non-domestic content. But overall we feel really well suited as the guidance solidifies. We've been talking with customers. We think that about 20% or so of our current quotations have some level of domestic content required as part of it. And we feel really excited and able to be able to meet those requirements for our customers as they look to solidify their planning for
spk11: 2025. And I think I'll answer the specific question regarding the 45X credits. And in particular, I think you're referencing clamps. On our last call we discussed that we were hopeful but not forecasting to be clear that clamps would classify or be delineated under structural fasteners and therein by weight get a higher level of credit. Unfortunately, what we found through this last round was they were not in a position to change any of the original language that had already been locked in stone. So they could not do that. So we're back to considering clamps under the longitudinal perlin's portion of the definition under torque tube at a lower level. But again, that was not put into our guidance at the higher level, so we're quite satisfied at this point. I think what we're more focused on is the fact that that level of clarity allows things to move forward. And we're as excited about that portion that now things can move forward, people understand where they are. And as Neil indicated, just over 20% of our order book is now focused on some level of domestic content at this point. So we're excited about being able to deliver that for our customers.
spk03: Thank you. The next question comes from Joe Osha from Guggenheim Partners. Please proceed with your question, Joe.
spk17: Thank you. Hello, everyone. Back to ADTVD and November 27th. One of the things that we often see is that not every module maker is treated equally. How much of a challenge could we see with developers switching out panels from one vendor to another? And how does that affect your business? Thanks.
spk11: Yeah, I think for us we're really excited about that. So first, I can tell you that when we're designing a site now, and this has been this way for about a year since the ADTVD, we're not giving a vendor a one-site design. One of the challenges we have internally is that our customers, rather, are asking us for three and four different site designs on three or four different panels. They're unsure which panel they're going to choose in the end. So we're doing multiple site designs for our customers under varying different supply chain strategies they have for different panels. And we've been doing that consistently now for probably eight months or so. So where we used to historically give you one quote, one design, we're giving you four quotes with four different designs. And what happens in that next round of ADTVD clarity is once our customers understand those economics of those different panel choices, they will then make their supply chain choices and pick one of those four designs and move forward. Now, the benefit for us and our unique ability to do that versus other competitors in the industry is that we don't drill into our torque tubes. We don't have preset fixed positions for clamping systems. So that as our clamps slide onto the torque tube, you could slide those to the left or right several inches or feet if need be. But we have a much greater level of flexibility without needing to re-drill torque tubes out in the field. So our customers can do those late selection of panels better with an array system than our competitors. And as such, we're giving them multiple designs and getting them ready to be able to make panel selections late in the process.
spk04: Thank you. The next question comes
spk03: from Kieran Bagri from Citigroup. Please proceed with your question.
spk19: Good evening, everyone. Kevin, can you talk about any changes to contractors with customers if there are any? What percentage of orders do have cash down payments? Are you taking some sort of guarantee in every order you receive? And in terms of second question, your outlook for Brazilian market, you mentioned that you highlighted you're a leader in that market. If you can just talk about how you're thinking about expectations in 2025, 26, you see it on your growth in Brazilian market. Not asking for guidance, but just broad outlook. Do you still see that market growing healthily for you? And then final question in terms of 45X, I know you've been talking about sharing 45X in cases where you can gain more wallet share with your customers. Have you shared 45X with any of your customers in cases you have? If we think about gross margin, that percentage gross margin goes down, but the absolute gross margin goes up as you gain more wallet share by giving up some 45X. Have you shared any and are we thinking about it the right way? Thank you.
spk11: Great question. We're going to unpack all those questions. And let me take the first couple and I'll turn it over to Neil as Neil runs the Brazilian operation so he'll give you a better answer on Brazil. So I'll say it again, that currently we have no orders within our order book, which requires the explicit sharing of 45X credits. Now that being said, we recognize our margins and when you look at our queue later today, our margins domestically are doing really, really well. And we're benefiting strongly from 45X credits. We are mindful of this and we're opportunistically providing our customers more competitive pricing utilizing some of the 45X. But it is not an explicit sharing agreement with 45X. It's about us realizing the benefits that we're getting and being able to pass them on in more competitive situations. So we feel really good about our ability to use some of that outsized margin domestically to drive additional business. And as I said, you'll see that in the queue that our domestic margins are going really, really well at this point. The second question or second element of the question was really about terms and contractual terms and what we were seeing relative to that. Look, always on occasion you may negotiate one-off exceptions on terms, but we've seen no real material shifts in customer deposit behaviors or requests. I will say that as order cycles have elongated in the last year, I've had a couple of customer conversations where customers are less willing to put full contractual deposits down too early. So historically where we may have gotten a 20% down payment very early in the process, in a couple of cases I've worked with those customers to reduce that initial 20% down to a lower percentage initially, and then they provide additional deposits over time as we get closer to the project kickoff. So I could say that's only happened on a couple of occasions this year in total. So it's not something that's really gone programmatic to us at all. Our goal is to routinely have as much of our backlog fully contracted, and by fully contracted that means there are penalties associated with delays, cancellations, things of that nature. So our goal is always to have as much of our backlog fully contracted. We're going to continue that practice and continue focusing on customer deposits prior to ordering materials and locking in our pricing. And as we do that, I'm certainly happy to get a large order fully contracted, even if that means say half of my historical deposit upfront on an order, right? Selectively, we're willing to do that because I really want that contract off the street and in my books with penalties. Does that make sense?
spk07: I'll turn it over to Neil.
spk06: Yeah, just over on
spk09: the Brazil topic. So again, not going to guide for 2025, but let me talk a little bit about the context of what we've seen this year. So as Kevin mentioned, earlier in the year we saw a lot of project pushes in a few periods in kind of that midsummer timeframe. We saw some of the same in Brazil during that time, but at this point that's largely settled out. So we haven't seen that rate of change since that period early in the summer. And now that market obviously is working through a number of factors. There's certainly some of the currency challenges. There's also the curtailment dynamic that's taking place with the Brazilian power grid. So we do think it's going to take a couple of quarters for that to settle out, but we do feel confident in our position there. We gained a lot of share from 2023 into 2024. It's been publicly noted that we're the largest PG provider in Brazil at this point as well. So we feel really well positioned. We do think it's going to take a couple of quarters for things to settle out, but as things then pick up again, we feel really well positioned to pick up where we left off.
spk11: If I could add, I think one of the things that the team in Brazil under Neil's leadership has done a great job over the last couple of years, it's we recognize that the Brazilian market shifts from period to period between large utility scale and DG projects. So this means you're going from maybe doing 10 or 15 large projects a year to literally hundreds of 5 and 10 and 15 and 20 megawatt projects. We set up a model that allows our business to shift very, very quickly between the two when we see. And that's what you're seeing. You're seeing the results of that increased process and operating efficiency of being able to pull that shift very quickly is what you're seeing in our DG market share. Certainly in 23 over 22, we gained a lot of market share in utility, tying for the number one market share in utility scale solar in Brazil, gaining nine full percentage points and then immediately shifting thereafter when the utility scale is getting bogged down a little bit in the near term, shifting to have the largest market share in the DG portion of the Brazilian market. So it's real strong credit to the team in Brazil that's being able to pivot the business very, very quickly for whatever the market throws at us down there. And I think that's a big note of success in our business model in Brazil to date.
spk04: Thank you. Next question.
spk03: The next question comes from Keshi Harrison from Piper Sandler. Please proceed with your question.
spk21: Good afternoon. Thanks for taking my question. So just the one for me. You know, Kevin, how do you philosophically think about the appropriate level of SG&A for the business both quantitatively, whether that's relative to sales or backlog or what have you, qualitatively as you think about strategic and R&D and what have you?
spk11: Yeah, I mean, we treat the buckets very differently, right? Relative to R&D, as the team brings forward really strong projects that pencil out with a high degree of margin accretion and revenue tie to them, we will fund them, period. That's period, nonstop. We believe that some of the best use of our funds is driving organic growth through new product development. We're seeing some of the new product development that we started when I got here two years ago finally coming to fruition and finally showing up in meaningful changes in our order book. So we're going to continue that. I think relative to SG&A on the front end of our business, what we found is that we have ample opportunities to continue investing in the front end of our business both internationally. Certainly in the last quarter, if I think about some of the ads and those quote unquote strategic investments we referenced in our prepared remarks, that's about sales and marketing talent coming into the company and getting much more aggressive. We've added salespeople in Europe. We've added salespeople in the US. We've added targeted product marketing specialists in the US to really continue to get the word out of our superior product advantages in the market. Look, we had been out marketed in this business for some time. We're just flipping and getting much more aggressive on the front end of our business. We've got new sales leadership in place, new commercial officer named, and several new bodies in the business already in just the last, say, two to three months coming in to help us expand our business. We're just going to accelerate the front end of that business.
spk04: The next question comes from Colin Rush from Oppenheimer. Please proceed with your question, Colin. Colin, you may proceed with your question if you're lying.
spk15: Sorry about that, guys. I'm curious about the competitive landscape and how much activity you're seeing in terms of cost reduction from any of your peers and the pricing dynamics that you might be seeing as a result of
spk11: that.
spk06: I wouldn't say we're seeing
spk11: much changes between, you know, historically, look, this is always a competitive marketplace between certainly the top few of us. I would say it continues to be a competitive marketplace for the top three of us, but I can say we're not seeing big deterioration in ASPs or anyone driving down price. I think what we're seeing is the beginning of some creeping in of sharing of 445X on behalf of some of our competitors, and that's showing up in some price. And again, when you look at our strong domestic margins in the queue, you'll see that we've got ample room to do that alongside, to even grow our market share even further than we think we've recovered this year. So we feel it's still fairly disciplined at this point. It's certainly not nothing close to a price war out there. What we're seeing is targeted projects that maybe fit us or fit a competitor. We're being aggressive to ensure those come into our order book, and
spk07: I think they're behaving similarly. I appreciate that.
spk04: Thank you. The next question comes from Derek Soderberg from Santa Fitzgerald.
spk03: Please proceed with your question.
spk20: Yeah, hey, guys. Most of my questions have been asked, but maybe on the 77 degree tracker. I'm curious, you know, what's sort of the significance of having this solution for you guys? Do you think maybe your architecture is uniquely suited for it? I know it's in the early days. Maybe what's the value of this type of solution in the market in terms of selling price increases? Is that material, is there a margin improvement attached to that? Anything on that would be helpful.
spk09: Thanks. Yeah, so we spent a lot of time with our customers with industry forums this year. We held an insurance forum earlier this year at our headquarters, and we really wanted to hear from our customers and from the industry what they're seeing and feeling and hearing, especially given a lot of the extreme weather events. Note there was a major storm, a set of storms in Texas around middle of the year where there's a significant damage. And to be clear, we feel that our legacy platform, it's those at 52 degrees, has performed really, really well in the real world. And actually it's performed quite well when you look at competitors offerings that are right nearby. So we feel really good about our current product and its ability to perform well in extreme weather for a lot of the reasons we talked about in the prepared remarks. But that being said, given that hail claims are like 1% of all claims, but represent about 50% of the losses, there's a high degree of sensitivity around anything that can be done to improve, especially when it comes to large size hail, which is really what provides like three instead of one or more is really what drives the predominant amount of damage for these sites. And there's a prevailing view that we heard from our customers and industry contacts that, hey, a higher degree would be helpful as they look to mitigate potential claims and losses in the analyses that they use, despite what's been kind of happening from a real world perspective out there. So long story short is we worked with our technical teams, spent a lot of time discussing and ultimately determined that, hey, there's an opportunity for us to really meet the needs and what is being asked for to come out with what we will believe is the highest degree still capable to protect against extreme weather events. That being said, it's going to be set upon the JORITRAC and OmniTRAC platform. So it's not a brand new offering. So it's going to be built largely upon the existing platform, which makes it pretty straightforward for us to bring to market. And ultimately, when it comes to certain design criteria that customers are asking for, specific enhancements do oftentimes bring with it potential margin opportunities, but we're not ready to get into that level of detail at this point. That being said, great response. You know, the RE Plus conference that was held in Anaheim in September got great feedback from our customers, a lot of enthusiasm, a lot of interest. And we look forward to talking about a lot more as it gets closer to coming out.
spk03: The next question comes from Mahip Mandeloy from Nizzo Securities. Please proceed with your question.
spk10: Hi, thanks very much. It's David from Mahip. I just have a quick one. With your competitor acquiring foundation companies, is that impacting your ability to bid for any projects?
spk06: No, from our perspective, hey, those foundation
spk09: companies that were bought, kind of rocky soil, those types of environments are really a niche kind of part of the market. And to be clear, we're certified to work with that provider. And given that it's a niche offering, we're still certified to work with them. They're working with us and we don't really feel that there's any limitation to us from a go-forward standpoint in that niche. We're obviously evaluating opportunities in that space and in other spaces where it makes sense from rocky soil, upper Midwest. This is why we talked about with Skylink that there are certain opportunities for us to have solutions that are custom tailored to certain geographies and parts of the country and around the world. And we don't feel any limitation based on data acquisition was made and we're quite comfortable with our position when it comes to specific soil and terrain.
spk04: Thank you very much. Ladies and gentlemen,
spk03: we have reached the end of the question and answer session and this does conclude today's conference. Thank you very much for joining us. You may now disconnect your lines.
Disclaimer

This conference call transcript was computer generated and almost certianly contains errors. This transcript is provided for information purposes only.EarningsCall, LLC makes no representation about the accuracy of the aforementioned transcript, and you are cautioned not to place undue reliance on the information provided by the transcript.

-

-