8/6/2026

speaker
Lacey

Good afternoon. My name is Lacey, and I will be your conference operator today. I would like to welcome everyone to the third quarter of fiscal year 2026 financial results conference call for CleanSpark. All lines have been placed on mute to prevent any background noise. After the speaker's remarks, there will be a question and answer session. If you would like to ask a question during this time, simply press star followed by the number one on your telephone keypad. If you would like to withdraw your question, press star one again. Thank you. I would now like to turn the floor over to Harry Sudock, CleanSpark's Chief Business Officer. Sir, you may begin.

speaker
Harry Sudock

Thanks, Lacey. Thank you for joining us today to review the third quarter 2026 financial results for CleanSpark. We encourage you to review our earnings result press release, which was issued today and is available on our website. Our 10Q will be filed shortly. A webcast replay and transcript of today's call will be added to our website once available. On the call today, I'm joined by Matt Schultz, our Chairman and Chief Executive Officer, and Gary Vecchiarelli, our President and Chief Financial Officer. Some of the statements we make today will be forward-looking, based on our best view of the world and our business as we see them today. The statements and information provided remain subject to the risk factors disclosed in our 10-K. We will also discuss certain non-GAAP financial measures concerning our performance during today's call. You can find the reconciliation of non-GAAP financial measures in the press release, which is available on our website. And with that, take it away, Matt.

speaker
Matt Schultz

Thanks, Harry. Good afternoon, everyone, and thank you for joining us. To begin, I'd like to discuss how we're putting our operations and balance sheet to work as we continue our evolution into a diversified digital infrastructure platform. Following the close of this quarter, we completed an agreement that is the most significant transaction in Queen Spark's history, a 20-year triple net lease at our Sandersville, Georgia campus with a high investment grade leading global technology company. That agreement marks the start of our evolution into a diversified digital infrastructure platform and begins the monetization of our power portfolio at an institutional scale. The lease represents $6.6 billion in contracted revenue to the business with the ability to scale to $11.6 billion with the execution of two five-year extensions. Being a true triple net structure, we expect near 100% net operating income margin. We have also forged a partnership with a vertically integrated mechanical, electrical, and plumbing manufacturer and design builder and added 885 megawatts of commercial growth. Taken together, these developments bring our second mover advantage fully to bear. Many of you joined us for our investor update on July 14th and today I would like to recap three things. First, I want to spend some time on why we believe this lease is not just a milestone, but among the absolute best commercial outcomes in the sector. Second, I'll update you on execution at Sandersville, across our Texas portfolio under exclusivity, and across the broader platform. And third, I want to talk briefly about our legacy Bitcoin mining business and how the optionality it provides is a strategic advantage as we enter this next phase of evolution and growth. Let me start with the market. The demand for compute continues to outpace the industry's ability to supply it. The constraint is not chips and it is not capital. It is energized, grid-connected power at scale, sitting on land that can support a full AI campus build. That combination is scarce today and we believe it will remain scarce for years to come. The agreement is a 20-year triple net lease covering the entirety of our Sandersville campus, nearly 250 megawatts of gross capacity and 175 megawatts of critical IT load. The initial term carries approximately $6.6 billion of contracted revenue with two five-year extension options that bring the total to approximately $11.6 billion over 30 years. We expect an average annual NOI of approximately $330 million and we project our cost per critical IT megawatt at the $10 to $12 million range in line with the market for this generation of data center. Here are two things I want everyone to take away from those numbers. First, we believe on a risk-adjusted basis the economics are among the best in the space. Headline comparisons across data center deals can be misleading as different contract durations, different lease structures, different risk allocations, and different financing packages can obscure actual returns. Next, this is a triple net lease. Taxes, insurance, and importantly, maintenance capex all sit with the tenant, which means our contracted revenue converts to net operating income at effectively 100%. but the benefit goes beyond that. The triple net structure is a powerful risk mitigant on the finance side. Lenders underwriting this project are looking at two decades or more of clean, predictable, high margin cash flows backed by a high investment grade counterparty with no operating cost volatility sitting between the rent check and the debt service. This is why we were able to structure this deal without credit wrappers and why we expect most of this build-out, pardon me, we expect to finance most of this build-out with attractively priced project-based financing. Gary will speak to the capital markets backdrop, but the short version is this. The structure of this lease was engineered to make financing straightforward and support a high loan-to-cost, protecting our equity. We deliberately went after a longer duration lease. We deliberately targeted a triple net structure and we deliberately chose a high investment grade counterparty as our tenant. Each of these choices was made with the strategic intention to protect and enhance shareholder value. As we sit here today, we have already fully funded the equity portion of the Sandersville project. On execution, the project is advancing according to plan. Site preparation work has been underway for months on a 122-acre greenfield parcel we acquired earlier this year, which allows us to build without disturbing our Bitcoin mining footprint just down the road. We're working with our tenants' preferred engineering, procurement, and construction management firm and general contractor. A partner with a proven track record and domestic manufacturing capability across key mechanical, electrical, plumbing, and cooling components. That familiarity meaningfully de-risks the supply chain and the long lead equipment timeline. It's also another step in shifting construction out of the field and into the factory, reducing on-site labor and delivering a faster, more repeatable build. The first data hall remains on track to be ready for service in the fourth quarter of calendar 2027. And we've already ordered and prepaid for all data center long lead items for RFS. Let's turn to Texas. In conjunction with the Sandersville lease, our entire Texas portfolio, 718 acres, and up to 885 megawatts of secured and planned capacity across our Seeley and Brazoria campuses is under exclusivity with the exact same counterparty. As I said on July 14th, we are in an exclusivity window, not at the finish line. Still, the scope of this discussion reflects the portfolio dynamic we described to you last quarter. Sophisticated compute buyers are not looking for a single data hall. They want a growth path measured in gigawatts and a developer they can trust across a multi-decade relationship. Sandersville is the first chapter. Exclusivity across 885 megawatts in Texas shows how our counterparty views the rest of our portfolio. Outside of CleanSpark's work in Texas, there's been a broader policy discussion this week. As many of you have likely seen, Governor Abbott directed the Public Utilities Commission of Texas and ERCOT to audit and verify all data center projects seeking a grid connection before they can move forward. While this may be seen as uncertainty or a short-term setback, we don't see it that way. We commend the governor for his thoughtful attention to one of the nation's most important power markets and the broader impact of ERCOT's upcoming actions. The operational rigor and financial commitments required to progress through the next phases of development and energization in Texas align exactly with how Clean Spark already plans and operates. While the formal batch process is now expected to extend beyond August 7, our campus quality, discipline site selection, and project readiness remain unchanged. ERCOT has notified large load applicants that final batch zero determinations will be delayed with the next key milestone, the August 20 PUCT open hearing. In the meantime, the state agencies are mobilizing to address the governor's directive, which underscores the critical role our sector plays in the Texas economy. Cleanspark's historical growth through countercyclical acquisitions provides a strong basis for us to run a similar playbook in the ERCOT market. As an example, you may recall that we acquired the original Sandersville campus during challenging political and economic times for the prior owner. We anticipate similar opportunities might develop in Texas in the near term. It's critically important for everyone to know that our previously discussed exclusivity agreement remains intact. We continue to invest in our Celia and Brazoria sites, and there is no anticipated change to our energization timelines. Across a broader portfolio, we hold 1.8 gigawatts of contracted capacity today with a high degree of confidence in growing beyond 2.1 gigawatts in the near term. Through the ERCOT review process, and we are evaluating multiple gigawatts of projects as we look to scale and diversify our digital infrastructure across the U.S. Our land and power engine has not slowed down because of this lease. If anything, this transaction sharpens our conviction. Powered land is the scarce asset of our era and finding it, contracting it and developing it is what our team does better than anyone else. Before I hand it to Gary, I want to spend a moment on our legacy Bitcoin mining business and the role it plays as we evolve into something profoundly different. When speed to power matters to a utility, we have the ability to bring a paying load online faster than a traditional data center developer. That capability helped us build this portfolio, and it will help us to expand it. At Sandersville, mining will continue to keep the site productive until the day of cutover. Financially, mining and our Bitcoin treasury give us a set of levers that very few companies in this sector can match. Our hodl balance is not a passive position. It is a flexible source of capital that we can deploy in whichever way creates the most value. What that means in practice is that we are never forced sellers of anything, not our Bitcoin, and critically, not our equities. Gary will walk through the capital strategy in detail, but the principle is simple. Mining funds a platform, the balance sheet protects our shareholders, and the AI business monetizes the portfolio for decades to come. I'll close where I always do, and that's with our people. The lease we signed in July reflects the grit, discipline, and talent of a team that I am privileged to work alongside. from the operators in Sandersville and all across Georgia, Texas, Mississippi, Tennessee, and Wyoming to the deal team that completed this transaction, a heartfelt thank you. Your tireless commitment to the mission we all share has paved the way for our future success. And with that, I'll turn it over to Gary to walk through the numbers. Gary.

speaker
Gary Vecchiarelli

Thank you, Matt, and good afternoon, everyone. I will dive into the quarter's numbers and then talk about our new Sandersville lease and our capital strategy going forward. For the quarter, our revenue of $138 million reflected a modest increase of 1% compared to the preceding second quarter. The average revenue per Bitcoin mined in Q3 was approximately $72,000, a 5% decrease from the prior quarter, but the average revenue per Bitcoin mined was $76,000. However, we still managed to recognize an increase in revenue as our uptime and hash rate increased in the third quarter. Gross margin in the third quarter was approximately 38% compared to 40% in the second quarter, as power prices had a modest increase of one-tenth of a penny over the prior quarter. GAAP net loss for the third quarter was $240 million compared to a loss of $378 million in the preceding second quarter. The primary driver in this quarter's net loss was unfavorable mark-to-market adjustments on Bitcoin balances of approximately $133 million. Comparatively, We recognized a larger unfavorable mark-to-market adjustment of $263 million in the prior quarter. Our adjusted EBITDA in the third quarter was negative $113 million. It's important to note that this adjusted EBITDA number does not adjust out the $133 million mark-to-market adjustment. When normalized for such non-cash items, we produced $20 million, a positive $20 million for the quarter. In the third quarter, our digital asset management activities once again delivered net positive cash returns. This quarter, we generated approximately $8.6 million in cash, which brings our total for the fiscal year to $25.8 million. Additionally, we sold the majority of our quarterly Bitcoin production, and through the efforts of our digital asset management team, we were able to recognize sales for Bitcoin 7% greater than spot. Before we open it to Q&A, I want to discuss our capital strategy. With the Sandsville lease announced and progress being made towards future lease announcements, we are quickly approaching a day with much more consistent, predictable, and durable cash flows. Our job between now and then is to unlock significant shareholder value by continuing to educate the market on the evolution our business is undergoing and the progress we are making towards that goal. Last quarter, I mentioned our second mover advantage in the AI infrastructure space. As Matt discussed, we have seen this play out in the commercialization of Sandersville. The 20 year duration of our lease, combined with its triple net structure and the high investment grade credit quality of our counterparty, put us in a rarefied air amongst our peers. We are positioned extremely well to execute on time and on budget with strong returns for our shareholders. With respect to the financing for the Sandersville project, I want to be explicitly clear. Our plan is to seek project-based debt financing to cover the vast majority of the build-out. Based on our estimated project costs of 10 to 12 million per megawatt, we expect total cash needed for CapEx in the range of 1.75 to 2.1 billion. Recent financings have exceeded 90% loan-to-cost. However, we have the equity portion of the Sandersville project already funded, and we will not be raising capital via equity or equity-linked instruments for Sandersville. It is also important to note that we had total liquidity of $917 million as of June 30, including approximately $200 million of cash and almost 14,000 Bitcoin. To follow up on Matt's remarks, we have a very positive view on the recent developments in ERCOT. as we expect further accretive opportunities to present themselves. Prior to Governor Abbott's directive, there were a number of opportunities that came to us on the eve of the SB6 attestation deadline requirement. This is quite telling as we believe there are potential sites that either need capital or don't have access to capital. We have significant dry powder with our Bitcoin balance, which we would be willing to part with if and when the right opportunity presents itself. We will continue to be aggressive, yet disciplined, in pursuing opportunities that secure a pipeline which will deliver significant returns. With that, I'll hand it back over to Harry and lead us into Q&A.

speaker
Harry Sudock

Thanks, Gary. We will now open the floor to questions from the analyst community. Operator, please provide instructions and manage the queue for the Q&A session. Thank you.

speaker
Lacey

I would like to remind everyone, if you would like to ask a question, please press star, then the number one on your telephone keypad. We'll pause for just a moment to compile the Q&A roster. Your first question comes from the line of Paul Golding with Macquarie Capital. You may go ahead.

speaker
Paul Golding

Thanks so much and congrats on the progress in procuring all the long lead time items for Sandersville. I wanted to ask first on the 10 to 12 million per megawatt CapEx range. Is there a benefit baked into that from the existing infrastructure at the site, and how should we think about that cost per megawatt versus, say, Texas where maybe there's a little more greenfield development to do or maybe not? Just any call you could give on that, and then I have a follow-up. Thank you.

speaker
Harry Sudock

Awesome. Thanks, Paul. This is Harry. So really important for our strategy for developing in Sandersville was to procure the 122 acre parcel a little bit down the road so that we could build out the data center as a true greenfield development. So when we think about all of the data center costs associated with the build out, those are really apples to apples versus any greenfield project in our mind. There is a very modest accretive value from the current deployment that's related to the substation being already built and energized. That point was a critical piece in the commercialization process because having landed power and energized power made that a particularly attractive campus. But when you think through the CapEx budget outside of the substation itself, really this is a true greenfield build.

speaker
Paul Golding

Great. Thanks so much, Harry. And then maybe following on to that, you seem well-placed, well-positioned to leverage the liquidity position that you're in and the opportunity presenting itself in ERCOT. How should we think about behind-the-meter versus grid-connected opportunities? It seems like you're encountering grid-connected opportunities given the commentary around timing and SB6 and things that were presented to you, but Just wanted to get a sense of the market, how you see that value proposition. Are you exploring behind the meter or is it not even necessary given what you're seeing around grid connected opportunities? Thanks so much.

speaker
Harry Sudock

Thanks, Paul. I think that the fundamental macro perspective is that the explosive growth in the data center market and the relentless demand profile that sits behind that is going to require behind-the-meter deployments to achieve any of the, even the bare or the mid-case data center growth numbers that are out there from, you know, from yourself and from other shops that are that are looking to see, you know, what does this really look like over a 5, 10 and 15 year deployment scale? It's something that we're very actively looking at internally, but like with everything, we move strategically and deliberately, and we want to make sure that there is true continuity between the energy source, between the CleanSpark capability, and between the customer needs so that we have full end-to-end project clarity before any of those solutions would come to market.

speaker
Paul Golding

Great. Thanks so much, Harry.

speaker
Lacey

Your next question comes from the line of Greg Lewis with BTIG. Please go ahead.

speaker
Greg Lewis

Yes, thank you, and good afternoon, and thanks for taking my questions. You know, realizing, you know, the opportunity in Texas has a long tailwind for you guys. You know, you do have some other sites, right? You have, you know, you have Wyoming, you have Georgia, you have Tennessee. I'm just kind of curious, just given the fact that Texas seems to be in a little bit of a holding pattern, could we see some of those locations actually move more to the forefront? And have customers shown an increasing interest in those, just realizing that this happened the other day? But it seems like Tennessee is becoming a hub. Obviously, you already have the one contract in Georgia. So just kind of curious how you're thinking about that 340 megawatts, you know, that's out there across those states.

speaker
Matt Schultz

Greg, really appreciate the question. This is Matt. I'll take that. I'd say given the scale of our Texas assets and how progressed our discussions are, both on permitting substations, the batch zero baseload process that we're in, I wouldn't exactly say that something is going to jump the line per se, but what I can tell you is we've had VDR open for a number of parties over time, and the interest in assets like Washington, Georgia, for example, present an extremely compelling opportunity. It's 86 megawatts of energized capacity today. However, we've already submitted a line study at the request of NEAG and a local utility to expand that by up to 500 megawatts. So as we've progressed those discussions, we've also secured options on several hundred acres adjacent to the existing substation to support that build. Additionally, you nailed it. We have 100 megawatts in Wyoming. We have 60 megawatts in Jackson, Tennessee. We have other capacity in Ripley, Tennessee, as an example. So I would say that the value of the assets outside of Texas for those in search of 2728 RFS went up significantly due to the uncertainty on the timing of this audit period that Governor Abbott pushed forward.

speaker
Greg Lewis

Okay, super helpful. Thank you for taking my question.

speaker
Lacey

Your next question comes from the line of John Todaro with Needham & Company. Please go ahead.

speaker
John Todaro

Hey, guys. Thanks for taking my question, and congrats on all the progress. You know, we went through the slides, but we have been getting a lot of investor questions, or I think they're just a little bit confused on Texas a bit here. Can you just very explicitly walk through your unsigned Texas capacity What still needs any ERCOT related approvals and what capacity and sites do not need any that you can go out and sign?

speaker
Harry Sudock

Yeah, John, absolutely. It's Harry. So the way that the acquisition process for the other two Texas sites went was very deliberate on our part. We are always thinking about risk management first and foremost in the business. And so the way we went about acquiring those projects fit into the same framework. When we acquired the asset in Sealy, very importantly, that asset came with ERCOT approval already in hand in 2025. That changed in January of 2026 when the batch zero process was rolled out purely from a timing and requirement perspective. But what that site received out of the gate there was batch zero go status, which means the baseload designation. And so while we do require the final determination from ERCOT in order to interconnect that location, it has been given every green light every step of the way through, despite needing the final checkmark in order to proceed through that final energization gate. The second is in Brazoria. There, the 300 megawatts of additional phase one capacity, those are functionally exactly the same as Sealy, other than the fact that they were given the GO status in 2026 rather than a 2025 overview. The second 300 in Brazoria is the segment of the megawatts that are subject to the final determination between baseload status and studied load status, though we still went through a very detailed transmission line assessment when we made the decision to acquire that location. And based on the transmission line capacity that we evaluated, We understand that site to have a tremendous amount of capacity, both upstream and downstream, within that segment of the utilities system. And so we're very optimistic, but that is the segment of the load that we are still waiting for, baseload versus studied load status.

speaker
John Todaro

Understood. Thank you. That's very helpful. And just to follow up here on the demand environment, Matt, you commented a bit on it, but just wondering is there any kind of hyperscalers and chip manufacturers that are getting more aggressive in looking at sites, any that have maybe pulled back and become less aggressive, just any color there?

speaker
Matt Schultz

Yeah, definitely no pullback. The inbound inquiries have ramped up in the last 48 hours. with questions surrounding whether or not there's any exclusivity on the Washington project. I'd say that's the one that has garnered the most interest of late just because of the capacity to scale in the short term.

speaker
John Todaro

Got it. Very helpful. Thank you, everyone.

speaker
Greg Lewis

Thank you.

speaker
Lacey

Your next question comes from the line of Brian Dobson with Clear Street. Please go ahead.

speaker
Harry Sudock

Hey, thanks, and congrats again on the deal. I guess as you're considering Governor Abbott's memorandum, is that indicative of what we might see in other large utility areas? And do you think ultimately it favors established players such as yourself? Yeah, so I think that let's take the second part first, which is that as we see the demand profile on the tenant side of the house continue to be relentless, The established players who have a long track record of procurement and development of energy and infrastructure assets are going to continue to rise to be the cream of the crop on the go forward basis. When it comes to the proliferation of this type of audit or assessment, I think it's dynamic. I think that Governor Abbott is facing the largest interconnect application queue of anybody in the nation. And so his response is going to be tailored to the Texas-specific dynamics and the ERCOT-specific dynamics that face that grid in particular. I think that ultimately one of the things that is currently not well understood broadly in public is the economic benefit that data center projects represent to cities, counties, and states across the nation and some of the technical specifics of data center deployments. There is dramatic technological improvement than 20 or 25 years ago in the way that data centers operate. Water usage has been crushed to near zero. The footprint that these data centers are operating on from a land use perspective is shrinking. And so I think that while there's still an education curve that the public is going through, when we look back in five to 10 years, this is going to look like another industrial revolution in America.

speaker
Matt Schultz

And, you know, if I may, Brian, just to add on to Harry's comments on the second part of your question about established players, you know, I've engaged meaningfully with the senior site selection folks from a number of hyperscalers. And what seems to be the consensus is that, you know, similar to, you know, Las Vegas residential real estate 20 years ago, in Texas, a lot of the developers or a lot of the hyperscalers are encountering folks that maybe put down a deposit on some land with proximity to transmission lines and applied for status within ERCOT approvals. What we're seeing now is with the implementation of SB6, now you have to put your money where your mouth is. And so a lot of these projects that may have real viability have kind of washed out because there's not the capital support behind them that's necessary. and based on our engagement with the communities and with ERCOT, having the balance sheet to actively stand behind the guarantees and the attestation process puts us in a really favorable position going forward.

speaker
Harry Sudock

Yeah, so ultimately it probably spurs more responsible development. As you're looking at your portfolio, Are there any regions where you think you'd like to enter in the call it medium term without being too specific?

speaker
Gary Vecchiarelli

I understand.

speaker
Harry Sudock

Yeah, thanks, Brian. I think that, you know, one of the things that we really pride ourselves in is being dynamic and flexible. I think that the opportunity set across These power projects are really at the project level where the big opportunity evaluation process happens. And so I think that we have the diligence team and the relationships to be successful in essentially every American power market as it exists today. But really where the special sauce from our perspective is, is being able to take in an enormous volume of deal visibility and be the strongest selectors within that deal volume so that we're able to be hyper, hyper surgical and specific about where we make selections. And a lot of that isn't about region or jurisdiction. It's even more granular than that.

speaker
Gary Vecchiarelli

Great. Thanks very much.

speaker
Harry Sudock

Thanks, Brian.

speaker
Lacey

Your next question comes from the line of Mike Colonies with H.C. Wainwright. Please go ahead.

speaker
Mike Colonies

Hi, good afternoon, guys. Appreciate you taking my questions. First one for me, I'm curious, based on your discussions with your candidate, Sandersville, would you say that getting a final green light on batch zero for Sealy and Rosario phase one would be a gating factor for the counterparty to sign a lease here? Do you think that's one of the getting factors? And the other thing, are there other development milestones that the counterparty is looking out for at either of the Texas sites that would need to be achieved by Clean Spark for them to move forward?

speaker
Matt Schultz

Hey, Mike, thanks for the question. This is Matt. Just to give you a little bit of color. We had a VDR open that encompassed a number of our sites, and we invited a number of major players into that VDR to do an analysis. And what surprised us wasn't that, you know, hey, I'm interested in site A or site B or site D or whatever the case may be. The response was, I'll take it all. Our Sandersville tenant was also in the VDR, and as a function of the negotiations and understanding the tailwinds that we brought to the Sandersville project, they were aggressive in seeking that exclusivity and optionality on the go forward. Now, we're still under exclusivity there. We're working with them constructively on a daily basis, but Suffice it to say that should this slip beyond the, you know, if we get bad news on the August 20 PUCT meeting, there's so much pent-up demand for energized megawatts that I think that If they were to fall out, there would be another company rushing to the gates in short order because of the quality of the asset, because of the status in that batch process, but also because of the advanced nature of the work that we've done to prepare those for pad ready.

speaker
Mike Colonies

Very helpful color there, Matt. I was hoping you guys could provide a little bit more insight as to these opportunities that are coming across the table in ERCOT. You know, maybe some of these underfunded or less legitimate projects. You know, what are some of the characteristics that you'd be most interested in pursuing as it relates to the sites that are coming to you?

speaker
Matt Schultz

Yeah, great question, Mike. Some of the stuff that we saw in the past that we passed on lacked the high quality that I think is a standard for CleanSpark. maybe had power that was in a later batch process that we passed on. But then as it got closer to that SB6 period, the quality assets started to accelerate just because folks didn't have the bandwidth or the capital to be able to support those initial payments. So I think for us, Nothing changes in light of Governor Abbott's position. We're still going to maintain the same rigor on site selection. It has to meet our criteria. We're not, you know, I think we talked about this back in the Bitcoin days, Mike, and that is we're going to find high quality assets and we say no more often than we say yes. Rather than, you know, find powered land and then try and shoehorn something to fit there, we look for the opportunities that best fit the demand profile we're seeing.

speaker
Mike Colonies

Great. Thanks, Matt. Appreciate you taking my questions.

speaker
Lacey

Our next question comes from the line of Brett Noblock with Fitzgerald. Please go ahead.

speaker
Nathan (on behalf of Brett Noblock)

Hey, good afternoon, guys. This is Nathan calling in from Canter Fitzgerald on behalf of Brett. Congrats again on the deal. Matt, I thought it was interesting when you said the role of Bitcoin mining was not just in building the portfolio, but in potentially being a differentiating factor in how you'll continue to grow it. So could you just walk us through how mining potentially could be incorporated into future site acquisitions and development? And then would it be similar to Sandersville, where it's a standalone data hall separate from the data center? Or are there other configurations that you'd consider?

speaker
Matt Schultz

Yeah, great question. Thank you for joining. Tell Brett we're not forgiving him for not showing up. I think the interesting part about this is when a utility has available power or when there's new generation that comes online, occasionally these loads are offered to the market initially as an interruptible load. So to be able to raise your hand and say, I'll take that power with 90 hours of annual curtailment with the understanding that once we demonstrate sustainability on the new generation, it becomes a fixed load or a firm load. So Bitcoin mining enables that ability for us. Additionally, if it is firm power that is available to monetize today for the benefit of the local utility and the community, they don't really care who's paying the power bill as long as the power gets paid. And we can drop in modular immersion-cooled Bitcoin mining technology inside our 90 days and start to monetize those megawatts that are otherwise going underutilized. We can then, just like we've done in many jurisdictions, acquire sufficient land behind that that we can take our time to build a data center according to the basis of design of the end-use tenant and switch that power over if and when the data center is complete. It's important to note The CAPEX requirement for that has already been spent on many of these modular deployments. As we move out of Sandersville in a couple of years, we'll repurpose those immersion-cooled pods and the ASICs to kind of plow the road, if you will, for future developments if and when those kind of interruptible or early energized asset opportunities make themselves available.

speaker
Nathan (on behalf of Brett Noblock)

Thank you for taking the question.

speaker
Lacey

Your next question comes from the line of Stephen Glagola with KBW. Please go ahead.

speaker
Stephen Glagola

Hi, thanks for the questions. I have one for Matt and one for Gary. Matt, maybe can you provide more color on the expected timeline for gaining clarity around the audit process? And you referenced in your prepared remarks the August 20th PUC hearing as a key date. Like, what should investors expect to learn by then? And maybe what are the next milestones we should be watching? You mentioned targeting high loan-to-cost on the project debt side. It'd be great to unpack that more and what you're seeing in the funding markets today around lender appetite and cost of debt and maybe what has changed over the last few months. Thank you, guys.

speaker
Harry Sudock

I appreciate the question.

speaker
Matt Schultz

I think the correct answer regarding Texas as we don't know. There's not a great deal of certainty in what lies beyond that August 20 PUC team meeting. What I can tell you is the outbound communications that we've had, the dialogue that we've had with folks such as CenterPoint is that the governor and the governor's representatives are aggressively looking to communicate to the market that the data center I think a lot of the objections that you're seeing in Texas come from the 765 KV high tension lines that are forced to be stretched across farmland or other areas. We're really fortunate in that the properties that we own don't require that. So I see that as a bit of a differentiator. But that may be true. That's just what we're hearing from the community relations folks that we have on the ground there.

speaker
Gary Vecchiarelli

And Stephen, regarding the financing portion, I'll tell you, as you've seen some of the recent deals, financing in excess of 90% low in the cost is very common, and that's our target. Obviously, the higher the loan to cost, the greater the internal rate of return is because you're bringing less equity to the project. So we obviously want to target the highest rates of return possible. So we're targeting above 90%. In terms of demand, we've been watching the market very closely, and maybe you saw across the wire this morning, and maybe you saw Google or Alphabet draw about interest of about $115 billion demand on just a $25 billion transaction. That's about four and a half times oversubscribed. And so to us, that's a clear indication that demand remains robust. And while spreads have widened in recent months, we've seen those hyperscaler bonds bid tighten up to 25 BIPs, you know, just in the last week. So, the markets can be a little fickle, but we're keeping a close eye on it, and we feel pretty confident we'll be able to hit our targets. Great. Thank you.

speaker
Lacey

Your next question comes from the line of Bill Papagnostasio with Chardon Capital. Please go ahead.

speaker
Bill Papagnostasio

Good evening, gentlemen. Thanks for taking my questions, and congrats again on the deal. In the remarks, there was mention that the team is looking at new opportunities in the multiple of gigawatts across the country. Can we just double click there? Where do you see the most value today?

speaker
Matt Schultz

Hey, Bill, thanks for the question. I think what you've probably known about Cleanspark since the day we sat in the van when we had two sites way back in the day, kind of talking about the path forward, we've been very disciplined. And I think a differentiator for us is when we talk about our 2.1 gigawatt pipeline or the 1.8 contracted pipeline, we're sharing what we have contractually bound to the company under some form of certainty to go forward. Duncan and his team, I think at last glance, had six and a half or seven gigawatts of projects actively under analysis and development. Now, many of our peers would talk about that being part of the pipeline. We're very careful about that because we want to have certainty. It kind of harkens back to when we were giving guidance about hash rate in our prior business. You know, we were the company that hit our guidance and raised and hit again, not that MISTA made an excuse. So we're very conservative in the way we talk about that. With regard to geography, I can tell you we're looking actively in projects today in all four time zones.

speaker
Bill Papagnostasio

Appreciate that. And Matt, I do remember the site tour very well. Look forward to spending more time together again. Secondly, I appreciate the update on the exclusivity agreements. Just curious, has there been any discussion with the tenants on modifying the deadline for that exclusivity following this indefinite delay to batch zero? Have they conveyed their stance following these changes? Any call you can provide there?

speaker
Matt Schultz

I would say that we remain under exclusivity. The conversations have literally not skipped a beat. They want the projects. They're interested in going forward. For us, it's not a fear of, you know, kind of losing that if it goes on for an indefinite period of time, because quite frankly, Bill, what we're seeing is rates are raising. You know, we're seeing terms that continue to improve. So if this, for some reason or for any reason, were to fall out, we would once again run a market clearing exercise. And based on the demand we're seeing, it's likely we'd create even greater value.

speaker
Lacey

Your next question comes from the line of Nick Giles with B. Reilly Securities. Please go ahead.

speaker
Henry Hurl

Thank you, operator, and good afternoon, everyone. This is Henry Hurl on for Nick. Congrats again on the Sandersville lease and getting the long-lead items ordered and prepaid. And this is actually a follow-up to a previous question. So did the Sandersville tenant also have an option to take exclusivity on Atlanta Metro, Washington, Georgia, Jackson, Tennessee, or Cheyenne, Wyoming, or were they just offered Texas?

speaker
Matt Schultz

Thanks. To be honest with you, when we populated the VDR, we populated it with the three sites that they seized on immediately. As I mentioned in a prior question, everybody that entered the VDR wanted D, all of the above. And so obviously with Sandersville being power that's been running 11x a hash of Bitcoin mining successfully with being wildly popular in the community, having tremendous community support behind us. That was the one they wanted to get right now because that gives Q4 RFS on the first data haul. Obviously, Texas was critical because it represents almost 900 megawatts of power that we have, as Harry mentioned in his comments, a high degree of certainty that falls in that batch zero base load certification. So those were the properties of the projects that we offered. Only later did we start to talk about Washington, Georgia, and that's been met with overwhelming inbound demand. because of the way that we've talked about our portfolio and the fact that we've been very transparent about what megawatts we hold where, organically, many of these developers have reached out to us and said, hey, what about that? So I can only tell you that with regard to the Sandersville tenant, everything that we put in front of them as an opportunity, they seized on.

speaker
Henry Hurl

Got it. Thanks for all the color there, Matt. That's really helpful. And then aside from Governor Abbott's pause, I believe Austin County also adopted a countywide moratorium on AI data centers on July 27th. Would this theoretically impact the Sealy site? And then any color on how you're working with the county would be very helpful. Thanks.

speaker
Harry Sudock

Yeah, so importantly, that is temporary. And what we've seen is that a tremendous number of these county, city, and local level types of attempts at writing zoning code, basically, have been overturned in court. and ultimately we remain incredibly constructive with the community. We think that positive resolution is always the best path forward and it's the way we've done business for many many years. I think this is going to be a tremendous success story where the leaders in that community had additional questions. They're going to get those questions answered with incredible results and we're going to be able to proceed constructively together in short order.

speaker
Henry Hurl

Thanks for the color there, Harry, and continue. Best of luck, guys. Thanks.

speaker
Lacey

Your next question comes from the line of Matthew Galenko with Maxim Group. Please go ahead.

speaker
Matthew Galenko

Hey, good afternoon, guys. Thanks for taking my questions. Can you maybe give us a little bit more color on the state of the digital asset management strategy? Is it still a priority to operate, or are you You know, really shifting all focus to the transition.

speaker
Gary Vecchiarelli

Matthew, thanks for the question. You know, we've been very consistent on with regards to our Bitcoin HODL balance and digital asset management. And I'll just reiterate that right now. You know, we have almost 14,000 Bitcoin on the balance sheet. And as we've said over and over again, We are not ideological about the Bitcoin balance. We're very strategic and we see it as a capital asset and intend to use it as such. So what does that mean? Well, while we believe that there's greater upside than downside in Bitcoin value right now, we will continue to use the Bitcoin to do several things. One, generate cash through covered call derivative strategies. In my comments, I've said that we've already produced almost $26 million fiscal year to date in premiums just based on that strategy, which allows us even to stay above spot price because we are selling the majority or all of our Bitcoin production right now to fund operational expenditures. and second, it's a great source of dilutive capital from really non-dilutive capital from two perspectives. One is that we can borrow against it because as of 6.30, we had $400 million undrawn on the Bitcoin back lines of credit. And two, as I also said in my comments, that we're willing to part with that Bitcoin balance for highly creative opportunities in the marketplace, especially considering now that management feels that our equity is not getting a respectable valuation. So knowing that we want to keep our cost of capital low, we'll look to the Bitcoin balance to help keep that cost of capital low while driving shareholder value. Great.

speaker
Matthew Galenko

Thank you. I guess with my follow-up, how do you think of your mining fleet if economics turn less favorable, particularly post-halving? I hear that you see that as an asset per land and power acquisition. But, you know, if economics kind of turn a little bit, do you still see that as a useful lever or, you know, is there a scenario where you move away from that strategy? Thank you.

speaker
Gary Vecchiarelli

Yeah, thanks for the question. So, look, if I had a crystal ball and could tell you where Bitcoin mining accounts would go, I probably wouldn't be sitting here today because it's a really hard business to forecast. But what I will tell you is that we have one of the world's most efficient fleets. which allowed us to operate at 38% gross margin in what was otherwise one of the historically most difficult periods for Bitcoin mining. I don't know what the future holds 24 months from now, but I'll tell you that we're focused on deploying capital to get significant shareholder returns, and right now the highest best in use of that capital is towards AI data centers and hunting land and power, which we're really good at. And Bitcoin mining, I think, will be the means to the end and help us get there.

speaker
Lacey

Your next question comes from the line of Mike Grondahl with Northland Capital Markets. Please go ahead.

speaker
Nathan (on behalf of Brett Noblock)

Hey, this is Logan. I'm from Mike. Thanks for taking our question. Just one from us today. We are now, call it, 20 to 25 days into this exclusivity period. Can you guys maybe just touch on what you learned from leasing Sandersville and how you are applying that to this process for the Texas sites? Thank you.

speaker
Matt Schultz

Yeah, appreciate the question. Thank you. I'll tell you the feedback that I received from their team after the successful execution of the lease and entering into the exclusivity. And that spoke largely to CleanSpark's DNA or history in energy markets and having an understanding with how that worked. The way we packaged up the project, we haven't talked a lot about. We have 40 acres with 250 megawatts that mine Bitcoin. And Prior to entering into an agreement, the community stepped in and assisted us in procuring 122 acres additionally. Aside from that, the community stood up and said, let us help you with the easements and the powered pathway to move the power from your existing site to the new site. So having the ability to have a collaborative, constructive relationship with the utility, with the community, with the policy people in and around the project was a real tailwind. The comment that we got back from that tenant was that your team is unique in the fact that they really understand energy markets, they understand the leasing process, and everything was collaborative. obviously, you know, top line lease numbers are something that matters to everyone. But when you look at 100% on NOI versus 80 or 85% on a modified gross, The top line is significantly less relevant. So we shared with them what was important to us. And to their credit, they negotiated with us in good faith to put across a deal that was meaningful for them but also supported all of our goals. And so as we turned to the Texas opportunity, the The exclusivity agreement for Texas pointed back at many of the terms in the Sandersville lease because we established the baseline and I'll use their vernacular as they referred to the process going forward with CleanSpark as a development partner. They look to use these as a rinse and repeat format. So it made us feel very confident in the team that we had that executed that lease and what the progress looks like going forward.

speaker
Nathan (on behalf of Brett Noblock)

Thank you. Appreciate the coming there, guys.

speaker
Lacey

Your final question comes from the line of John Hickman with Leightonburg. You may go ahead.

speaker
John Hickman

Hi. Can you elaborate a little bit on exactly what is your, what do you have to deliver to your counterparty in this triple mint lease?

speaker
Matt Schultz

Yeah, great question. So the initial lease contemplates a, you know, a powered data center. Included in beyond the original or the initial lease, you know, we negotiated and agreed to do some TFO work. But as a true triple net, once we turn over the keys, we basically walk away. We're not tasked with cutting the grass or changing light bulbs. It is all of the operational cost passes through to our tenants.

speaker
John Hickman

But you're responsible for the maintenance of the power that's being delivered?

speaker
Harry Sudock

No, John. So what we're responsible for is delivering data center certainty at the end of the build process. And so that includes the run of the power from the existing substations to the data center, but it does not include the ongoing maintenance of that power infrastructure that sits in between or at the substation. and then ultimately on the data center side, you can think of this as everything from the ground level to the shell and into the MEP and gray space of the core, but not inside of the white space from a leased asset perspective.

speaker
Matt Schultz

One last layer as far as risk mitigation, I think we talked about in our prepared comments, but I think it's important to emphasize that the EPCM contractor that we selected is also a manufacturer of many of the mechanical, electrical, plumbing, and cooling components, and they have a history of successful execution with this end-use tenant. So it was made as an introduction, and it gave us a great deal of certainty in execution timelines and compatibility with the end-use tenant.

speaker
John Hickman

Okay, so on the community support side of things, In the past, one of the benefits to the community was the power was interruptible if they needed it for one reason or another. With the data center going in, that's not going to be the case anymore. And they're still supportive of the project.

speaker
Harry Sudock

Yeah. John, so it's very important to understand some of the power market dynamics in the area and really what this type of 20-year Thank you for joining us. demand response capabilities that a Bitcoin mine would have had. They're significantly enhancing the tax base. The employment density of a data center relative to a Bitcoin mine is greater. And ultimately, those factors are dramatically, dramatically desired by the folks in Sandersville and I think, you know, many, many other places around the country.

speaker
John Hickman

Is there a point in time when we're going to find out who the counterparty is?

speaker
Matt Schultz

So like many of the deals that you've seen, John, they talk about the tenant that's under a confidentiality. We're talking about a high performance compute AI data center with proprietary technology and our tenant wanted to remain somewhat anonymous. That's not unique within the space. I think what's important to note and you can Google this yourself. It is a high investment grade global technology company, which is as much as they have allowed us to talk about. The high investment grade is really, I think, the differentiator. There are no credit wrappers. There's no equity component given away for a backstop. The finance rates are favorable because the credit rating of the tenant is amongst the highest in the cohort. So we're comfortable with the disclosure that we've made and they've asked us to keep it at that level.

speaker
Lacey

This concludes the Q&A session. I would like to turn it back over to Harry Sudock for closing remarks.

speaker
Harry Sudock

Thank you again for joining today's call. We look forward to staying in touch and sharing future announcements with you in the coming quarters. Stay tuned for more progress and exciting achievements ahead of us here at CleanSpark.

speaker
Lacey

Ladies and gentlemen, this concludes today's call. You may disconnect.

Disclaimer

This conference call transcript was computer generated and almost certianly contains errors. This transcript is provided for information purposes only.EarningsCall, LLC makes no representation about the accuracy of the aforementioned transcript, and you are cautioned not to place undue reliance on the information provided by the transcript.

-

-