11/12/2026

speaker
Operator
Conference Call Operator

Greetings and welcome to the EROC third quarter 2026 earnings conference call. At this time, all participants are in a listen-only mode. A question and answer session will follow the formal presentation. If anyone should require operator assistance during the conference, please press star zero on your telephone keypad. Please note that this conference is being recorded. I will now turn the conference over to Ted Durbin, SVP of Finance. Thank you, Ted. You may begin.

speaker
Ted Durbin
SVP of Finance

Thank you, Operator. Hello, and thanks for joining EROC's third quarter 2026 earnings call. I'm joined by John Carrington, CEO, Ian Blakely, CFO, and Corey Amthor, President. In a minute, I will turn the call over to John and Ian for their opening comments, after which we will have a question and answer session. Please note that we have also published a supplemental earnings presentation on our investor relations website. Later today, a replay of this call will be available on our IR site. As a reminder, we will provide forward-looking statements during this conference call. These statements reflect our current expectations and are not guarantees of future performance and involve a number of risks and assumptions. Please review our SEC filings for a list of actual risk factors that may cause our results to differ materially from those presented during this conference call. We will also discuss non-GAAP measures during this conference call. Reconciliations of adjusted EBITDA and certain other non-GAAP measures to their closest GAAP counterparts can be found in our earnings release and presentation available on our website. With that, let me turn the call over to John.

speaker
John Carrington
Chief Executive Officer

Thank you, Ted. Good morning and welcome to EROC's third quarter 2026 earnings call. Our team is executing well and the demand for our solutions is robust. There has clearly been a fair amount of volatility across AI infrastructure recently. However, our focus has been on controlling what we can control and delivering what we said we would. And in 3Q, we delivered. Revenue grew roughly fourfold sequentially to $153 million, and we achieved positive EBITDA of $13 million, which represents a $27 million increase in EBITDA since last quarter. These results are in line with the outlook we've provided since our IPO and we are affirming our full year 2026 outlook. Ian will provide more details on our results and guidance later in the call. Operationally, we made progress across several aspects of the business this quarter. Production in our Hyperion facility ramped through the quarter, and we remain on track to exit the year at approximately 1.2 gigawatts of annual capacity. Our El Paso Electric project moved from mobilization into active construction. We contracted for a multi-year fixed price supply of engine long blocks from Hyundai. We secured an additional production location in Houston called Atlas, which we expect to add roughly 900 megawatts of annual capacity by the first half of 2028. with the ability to expand to up to 1.2 gigawatts over time. And finally, we added over $300 million of bookings after the close of the quarter that brought our backlog to a new record. Before I walk through each of these in greater detail, I want to briefly comment on why our business model is structurally different from many companies in the AI infrastructure space. First, we're Capital Light. We don't own assets and don't intend to become an asset owner. As of the quarter end, we had over $500 million in cash, and no debt and we can expand our production capacity at relatively low cost. Atlas, which I will come back to later in the call, is a prime example. Second, our cash conversion is strong. We receive a deposit at contract signing and further payments as we hit operational milestones. And we match those collections with payments to our suppliers. That keeps us working capital neutral and less exposed to project delays. Third, we work with high-quality counterparties such as El Paso Electric and Meta, Anthropic, Intergy, and Microsoft. Fourth, we are building long-term recurring revenue streams with our O&M service agreements. The result is that we control our own destiny. These advantages mean that we don't depend on capital markets to fund our growth. Now, turning back to our results. Operationally, we made solid progress across several parts of the business since our last call. Starting with production, our Hyperion facility ramped through the quarter. In July, we moved generation production from our original, tightened facility into Hyperion, expanding from 100,000 to 400,000 square feet. After a short, planned pause during the transition, output improved steadily month over month. We remain on track to exit 2026 at 1.2 gigawatts per year. Moving to our El Paso project, we are partnering with El Paso Electric to support Meta's data center complex with 366 megawatts of power. We are compressing what would otherwise be an estimated five-year grid interconnection wait into roughly 15 months. During the bridge period, El Paso collects payments from META under a power purchase agreement. Once interconnection is complete, This highly depreciated asset can move into El Paso Electric's rate base, giving rate payers a meaningfully lower cost source of peak capacity. The execution is on track. Most of our silver work is complete, and gensets began arriving on site earlier this month. We expect a complete installation by mid-2027. On the regulatory front, EPE received its air permit in under 45 days in late 2025. In September 2026, EPE also received a favorable proposal for decision from the administrative law judge regarding this project. We're aware of the recent discussions in Texas around how large loads connect to the grid. We have seen no impact on this project. META has engaged directly with the community, including establishing a local fund in El Paso, and we believe the project is well positioned and will benefit both META and EPE ratepayers over the long term. While we continue to execute in El Paso, we are also strengthening our supply chain. In early October, we announced a multi-year fixed price agreement for engine long blocks, a core component of our rock block generator. The agreement covers 2027 through 2028 and secure supply for our production commitments already in our backlog. Locking in this long lead component early protects both our delivery schedules and our margins. It gives us a strong foundation with Hyundai as our needs grow beyond 2028. Turning to capacity expansion, our production is sold out through 2027 and into early 2028. Given that demand, and our Hyundai Agreement, we have secured a location for a new assembly facility in Northeast Houston, which we are calling Atlas. At 650,000 square feet, Atlas will be 60% larger than Hyperion. The location is close to natural gas supply for quality testing and has good proximity to the Houston Ship Channel for logistics. We expect Atlas to begin ramping production in late 2027 and reach roughly 900 megawatts of annual capacity by the first half of 2028, with the ability to expand to 1.2 gigawatts over time. We expect Atlas CapEx of just $20 to $30 million, depending on the final configuration. That's the Capital Light model in practice, roughly a gigawatt of new annual capacity for a fraction of what it would cost a traditional OEM. Together, Hyperion and Atlas will give us about 2.1 gigawatts of annual capacity by the first half of 2028 and up to 2.4 gigawatts with the expansion. We will apply what we have learned building Titan and Hyperion as we build Atlas, and shared overhead should lower our per unit cost over time. But before discussing the commercial side of the business, I want to spend a few minutes on the installation and ongoing service aspect of our model, which we believe are a competitive differentiator for the business. On our August call, we spent time on RockBlock, a proprietary natural gas generator and its technology differentiation. RockBlock was purpose-built for fast start and dynamic transient response with up to 99% lower emissions than diesel, quieter operation, a small footprint, and no water requirement. But the generator is only one part of what we offer. We deliver a complete turnkey power system. This vertical integration allows customers to work with one accountable partner from installation through ongoing operations. On the front end, we help customers with engineering and design, technical specifications, and grid certification. Our dedicated program managers work hand-in-glove with our customers to optimize time and resources to ensure they receive a quality project. We also lead negotiations with suppliers for transformers, switchgear, and other balance of plant items to minimize cost and maximize efficiency of the site. We help manage permitting, natural gas supply, and environmental studies to ensure on-time and on-budget power system delivery. El Paso is a great example. With our support, the customer received their air permit in less than 45 days. Our vertical integration drives deployment efficiency. Our pre-kitted modular systems require less specialized labor and heavy equipment on site than most competing technologies, which means faster deployment. For the California Department of Water Resources, we set 50 megawatts of generation in just two days and repeated that at two additional 50 megawatt sites. These advantages are particularly relevant in today's constrained labor market, where skilled labor availability can affect both project costs and schedules. Our installation model helps mitigate those constraints while supporting faster, safer, and more repeatable deployments. Once the installation and commissioning are complete, we operate and maintain the system over the life of the asset. In the field, we provide rapid outage response, preventive maintenance, and inventory management to deliver five nines of reliability. Because our equipment and processes are standardized, we do not require specialized engineers. Trained technicians can perform routine operations and maintenance, supported by centralized engineering and technical specialists. This expands our addressable technical hiring pool and allows us shared specialized expertise across the fleet. Those standards also simplify spare parts inventory needs. We also provide centralized optimization and insights, including reliability and economic dispatch, natural gas procurement, hedging, and reporting. Our Network Operations Center monitors every system and captures data over each genset's lifecycle. And that data helps us improve performance and drive more efficient maintenance over time. Field findings also feedback into engineering, supplier quality, and production, allowing operating experience to inform improvements to both our equipment and maintenance practices. Another good example of our approach comes from HEB, the largest grocery store chain in Texas, which has effectively standardized on EROC for backup and dispatchable power. We provide critical backup support during storms to help maintain power to critical operations during utility outages. And we help HEB monetize those same assets during grid events or when power market prices provide an attractive return. Our technology also helps customers address the environmental and community considerations associated with adding significant power capacity. Rockbox Low Emissions, Quiet Operation, and Lack of Water Requirements can support deployment closer to load centers and help differentiate our systems in the permitting process, depending on the jurisdiction. We are already seeing customers value these attributes in competitive situations, and we believe they will remain increasingly important as data center developers balance the need for power with their environmental footprint and relationships with local communities. As you know, the need for computing power continues to increase and data centers will be built to meet that need. We believe the power industry is in a structural shortage and our solution meets that demand for power while enabling data center operators to remain good stewards of their communities. Another component of our offering is the multiple use case for a single asset. On our bridge-to-grid model, we are seeing bridge power periods trend somewhat longer than previously discussed, starting at three years but increasingly pushing to five to seven years. This largely reflects the time required to secure full grid interconnection in certain markets. We view this as constructive to our model. We generate roughly three times the amount of ongoing services revenue during bridge periods versus backup and dispatchable periods. We are monitoring developments in Texas, where regulators and policymakers continue to discuss how large loads connect to the grid. We view the focus on responsible development, grid reliability, and community considerations as consistent with our approach. Whether customers are awaiting grid interconnection, We offer a critical service and believe our ability to deploy reliable capacity quickly, operate it efficiently, and serve multiple use cases positions us well. Now, pivoting to some commercial updates. On our last call, we talked a lot about data centers, so I want to spend a moment on our commercial and industrial business. Large headline agreements with hyperscalers and data center customers remain a long-term growth driver, but they can also be lumpy from quarter to quarter. Underneath that, the C&I business continues to grow steadily. One of the key drivers of the growth in CNI is the movement to reshore manufacturing. Whether it's AI rack production and testing, drone and robotics manufacturing, or farmer production, the growth and demand from this segment often needs bridge to back up power. Legacy verticals like hospitals, universities, grocery, EV charging, and logistics continue to expand. These loads can range in size from 5 megawatts to 100 megawatts. C&I customers face many of the same challenges as utility scale and data center customers, including long interconnection queues and limited equipment availability. We're continuing to win share from Diesel in this segment as customers increasingly move from pure backup-only use cases towards the flexible, multi-use model we built our business around. A good example of the growth in demand and the value of our multiple use cases comes from Wistron, a Fortune 500 manufacturer. Our deployment with them in Texas began as a bridge power use case to solve the speed to power challenge. Once they received grid connection, our generator shifted to backup mode. Now they are contemplating increasing the size of their facility, driving higher power needs and additional bridge power for EROC. Their familiarity with our team, execution to date, and the multiple use cases from a single asset has differentiated the company at Wistron. We also recently closed a bridge power deal with a large healthcare system for 2028 delivery. This customer was facing a four-year interconnection wait for a major new facility they're building. We will provide them with bridge power for a couple years, then transition into backup service. Finally, on the commercial front, in late October, Jason Altevelli joined us as Chief Revenue Officer. Most recently, Jason served as Global Head of Energy and Infrastructure Partnerships for Google Cloud, building strong relationships with Google's key utility, IPP, and developer partners. Those are exactly the relationships we are scaling. His experience on the buyer side of hyperscaler power will be invaluable as we grow our pipeline with data center and utility customers. Taken together, Q3 was another quarter of delivering on what we said we would, and we are building the backlog, the capacity, and people to continue this momentum and execution. With that, I'll turn it over to Ian to walk through the financials.

Want transcripts like this in your own app? Try the Earnings call API, or read the transcript API docs.

Disclaimer

This conference call transcript was computer generated and almost certianly contains errors. This transcript is provided for information purposes only.EarningsCall, LLC makes no representation about the accuracy of the aforementioned transcript, and you are cautioned not to place undue reliance on the information provided by the transcript.

-

-

Use this data in your own app

Pull this call's transcript, audio and slides with the Earnings call transcripts API.

See pricing

9,000+ companies · REST API

Investor presentation