spk01: Good morning. My name is Regina, and I will be your conference operator today. At this time, I would like to welcome everyone to Entergy's first quarter 2023 earnings conference call. All lines have been placed on mute to prevent any background noise. After the speaker's remarks, there will be a question and answer session. If you would like to ask a question during this time, simply press star followed by the number one on your telephone keypad. If you would like to withdraw your question, press star one again. I would now like to turn the call over to Bill Abler, Vice President of Investor Relations for Entergy Corporation.
spk09: Good morning, and thank you for joining us. We'll begin today with comments from Entergy's Chairman and CEO, Drew Marsh, and then Kimberly Fontan, our CFO, will review results. In an effort to accommodate everyone who has questions, we request that each person ask no more than two questions. In today's call, management will make certain forward-looking statements, Actual results could differ materially from these forward-looking statements due to a number of factors which are set forth in our earnings release, our slide presentation, and our SEC filings. Entergy does not assume any obligation to update these forward-looking statements. Management will also discuss non-GAAP financial information. Reconciliations to the applicable GAAP measures are included in today's press release and slide presentation, both of which can be found on the investor relations section of our website. And now, I will turn the call over to Drew. Thank you, Bill, and good morning, everyone. We had a very productive start to the year, with meaningful progress on activities that support our near and long-term objectives. Today, we are reporting first quarter adjusted earnings per share of $1.14. Mild weather affected these results, but we are prepared for this variability. As we have shown over the last several years, our FLEX program helps us achieve steady, predictable results. We are on track for 2023 results in line with our guidance, and we remain well-positioned to achieve our long-term 6% to 8% growth outlooks. Our focus on creating sustainable value for our four key stakeholders, customers, employees, communities, and owners, is the foundation of our strategy. It's at the center of everything we do. Recently, Just Capital and CNBC named Entergy to the Just 100 list. which highlights companies that are doing the right thing for all their stakeholders. We are honored because our inclusion on this list is an acknowledgement that we are living up to our commitment. Serving all our stakeholders starts with understanding what our customers need from us. To meet those needs, we are investing to improve reliability and resilience and significantly expand our clean energy footprint. This will not only help our current customers become more successful, but will also attract new customers. So far this year, we have installed or replaced over 400 transmission structures with new resilient designs, including critical river crossing lines. We also completed transmission interconnections for two new Entergy-owned renewable resources. One example of a transmission project that will improve resilience and reliability is a recently completed project in Southwest Louisiana where we upgraded transmission lines rated to withstand 150 mile per hour winds, replaced older poles with resilient steel structures, installed new higher capacity power lines, and added automated switching capability to improve reliability. In southeast Louisiana and in Texas, we are building new substations and distribution power lines that will support residential and business growth in those areas and reduce stress on existing substations. In addition, we installed or replaced more than 5,000 wood distribution poles with newer, more resilient designs. Collectively, our team continues to focus on operational excellence to deliver stakeholder outcomes across all facets of our business. We also continue to be a critical local partner supporting strong economic development, working to bring new businesses, new jobs, and new tax base to the communities we serve. As you know, we expect significant industrial sales growth over the next several years. While the broader market is contemplating recession concerns, our region's growth story remains intact. Key strategic value drivers continue to be supportive. The LNG, ammonia, and refining sectors are generally short on supply, and the deficit will likely not be meaningfully affected by a recession. Other sectors, such as ethylene, PVC, methanol, and steel, may see some market pullback, but the Gulf Coast has the lowest cost producers, so plants in our service area should be the last to be curtailed. Meanwhile, the passage of the IRA is accelerating development in the clean energy transition space. We are seeing very strong interest in our service area. which has the potential to increase and extend our 6% long-term industrial sales growth rate as incentive rules are finalized and turn into financed projects. One example of a potential project fueled by the IRA is the St. Charles Clean Fuels Project, which is exploring whether to build a $4.6 billion blue ammonia production plant in St. Rose, Louisiana. The new facility would produce up to 8,000 metric tons per day of blue ammonia and would rely on carbon capture technology to sequester more than 90% of its carbon dioxide emissions. Our underlying 6% industrial growth rate does not rely on these IRA tailwinds, and we continue to see a lot of activity in the traditional industrial segments we serve. There are some noteworthy developments in recent months. including Golden Triangle Polymers, which held its groundbreaking for a state-of-the-art polyethylene plant in Orange County, Texas. In addition, SEMPRA announced that the company reached its financial investment decision and issued the final notice to proceed on Phase 1 of its Port Arthur LNG project. A big part of meeting our customer sustainability needs is growing our clean energy footprints. and we continue to make progress on that objective. On Monday, we held our official groundbreaking for the Orange County Advanced Power Station in Texas, hosting Governor Abbott, four of five PUCT commissioners, and other state and local officials. That facility will ensure that we have modern and reliable infrastructure to support existing customers and the rapidly growing customer base in our Southeast Texas region. We will utilize turbine technology and a plant layout that can support dual fuel capability with hydrogen in the future. The optionality helps ensure the plant's long-term viability and creates improved energy security and operational flexibility for our customers. We also continue to make progress on our objective to expand our renewables capacity to meet customer needs. Since our last call, Entergy Arkansas and Entergy Louisiana concluded evaluations of their 2022 renewable RFPs. Participation was robust, and we earned negotiations for approximately 2,300 megawatts. Turning to affordability, it remains a core tenet in our pursuit of greater sustainability and reliability for customers. To help manage bill effects of customer-centric investments, we continue to aggressively pursue customer sales growth, discipline cost management, and federal support to offset costs. Natural gas prices have come down significantly, and coupled with a mild winter, that's further good news for customer bills. Our latest estimates for residential bill trajectories, including updated gas curves, have improved. For the system, we are now seeing a three-year annual growth rate of less than 1% from 2022 through 2025. That's roughly half the level we were expecting a few months ago. In the quarter, we made meaningful regulatory progress against our objectives. Entergy Texas has reached settlement on all material issues with parties in its base rate case, and we expect to file the settlement with the PUCT in the next few weeks. Entergy Mississippi filed its annual formula rate plan in March. Mississippi's efficient mechanism supports continued customer-centric investments and supports our financial outlooks. Interim rates became effective on April 1st. Entergy Louisiana's formula rate plan will expire after this year's filing. We are evaluating options to renew the current FRP, and we are also preparing for a potential rate case filing which would be submitted this summer. As we've laid out, Entergy Louisiana is investing significant capital to support our customers' growth and their demands for greater resilience and clean energy. This growth is critical for Louisiana and its local communities. We need to ensure that our rate constructs provide the opportunity for fair and timely recovery, which will allow us to effectively source the capital while maintaining utility credits. Either an FRP renewal or rate case pass should allow enough time for rates to be effective in September 2024, which would keep us on our normal cadence. If we file a rate case, we will request a new FRP starting with the 2025 filing year. Entergy Louisiana also filed a request to streamline the procurement and approval processes for up to 3 gigawatts of solar resources. This is in addition to the nearly 2.5 gigawatts from previous or ongoing RFPs. If the new processes are approved, we can bring additional renewables to construction faster and at a lower cost and risk, materially improving our ability to meet our customers' accelerating demands for clean energy. For our accelerated resilience and grid-hardening filings, Entergy Louisiana received a procedural schedule in its docket. Next up is the Commission's engineering report and testimony to be filed in August. Hearings are scheduled in January of next year. However, there is the potential to receive a decision this year through a settlement with parties, and that remains a possibility with broad stakeholder alignment on the need for more resilience investments. In a separate but important docket, The LPSC staff outlined a process and an evaluation procedure for utilities in Louisiana to follow, which creates a solid roadmap for Intergy Louisiana's resilience investments. Intergy New Orleans filed its updated resilience plan with the City Council. The $1 billion 10-year plan reflects significant stakeholder input. Like Louisiana, New Orleans is requesting approval for the first five years of the program, and we are targeting a decision from the Council by year end. In Texas, the Electric Infrastructure Resiliency Act has been proposed in both the State House and Senate. The bill, if passed, would require the Commission to act within 180 days of utilities filing a resiliency plan. Certain prudently incurred costs would be recovered through a variety of mechanisms. We will continue to work with our regulators across all aspects of our business to create value for our customers and other key stakeholders. And you can find additional details on our regulatory proceedings in the appendix of our webcast presentation. In March, our service area experienced tornadoes in Arkansas and Mississippi. The damage to our system included distribution poles, wire spans, transformers, and one substation. We replaced damaged equipment with newer, more resilient assets rated to our latest standards. The restoration was completed quickly and safely with zero injuries. And for that, I am extremely grateful to our teams. In addition to restoration, we responded quickly to provide community support. Entergy shareholders committed $150,000 to the American Red Cross to provide shelter, food, water, mental health counseling, and other services to households impacted by the tornadoes. In addition, more than 150 Entergy employees came into the affected region and volunteered their time by assisting with cleanup, providing meals, organizing supply drives, and staffing information booths to once again prove our employees' unfaltering commitment to our customers and communities when they need it most. Before concluding, I would like to note that Entergy Mississippi is celebrating its 100th anniversary. That's a century of serving its customers and communities. To commemorate this milestone, Entergy Mississippi donated $100,000 to Extra Table, a Mississippi-based food bank, to combat food insecurity in Mississippi. That's $1,000 for every year of operations. In addition, Entergy volunteers packed 2,500 meal kits. This is the first event of a multi-phase program that will ultimately provide 100,000 meals. Giving back to communities through philanthropy, volunteerism, and advocacy is integral to Entergy's living its vision statement of We Power Life. We've had a productive start to 2023. We are focused on successfully delivering value for our key stakeholders, and we will continue to successfully achieve the milestones that keep us on track to deliver steady, predictable earnings and dividend growth. To do this, we are working to improve operational and regulatory outcomes, support our customers' industrial growth and economic development in our region, invest in renewables, clean energy, and resilience accelerations to support our customers' demands and execute with financial discipline to strengthen our balance sheet and become more competitive. And I'll turn the call over to Kimberly, who will review our financial results for the quarter.
spk04: Thank you, Drew. Good morning, everyone. Our first quarter adjusted earnings per share was $1.14. Results included very mild weather, which reduced earnings by an estimated 22 cents. We incorporate conservative assumptions into our planning process and have a portfolio of flex levers to mitigate the impacts. The fundamentals of our utility growth remain strong. And despite the first quarter weather, we remain squarely on track to achieve our financial objectives for 2023. Before I review quarterly results, I'd like to highlight a couple of items. First, this quarter's results included the effects of storm securitization at Entergy Louisiana, including $76 million of benefits for customers. These items were considered adjustments and are excluded from adjusted earnings. Additional details are provided in our earnings release. Second, beginning in 2023, as a result of the successful exit from the merchant nuclear business, EWC is no longer a reporting segment, and any remaining financial activity from that business is now included in parent and other. You'll see the first quarter variances laid out on slide four. The quarter results reflected the effects of investments that are benefiting our customers. This includes regulatory actions, as well as depreciation expense, other taxes, and interest expense. Excluding weather, retail sales were higher, driven by industrial sales growth of 2%. That growth came largely from new and expansion customers, particularly in the primary metals and petrochemicals industries. This was partially offset by lower sales to co-gen customers, as co-gen sales were particularly strong in 2022. Slides 5 and 6 show key metrics for our largest industrial segments. As Drew mentioned, these metrics remain very supportive and are consistent with the growth that we are seeing. They also give us confidence in our industrial sales growth outlook. Moving to slide seven, operating cash flow for the quarter was $960 million, $422 million higher than last year. Higher utility customer receipts, lower non-capital storm spending, and lower pension contributions were the largest drivers. The effects of the EWC wind down provided a partial offset. Credit and liquidity are summarized on slide 8. During the quarter, Intergy Louisiana received $1.5 billion from storm securitization. This completes our securitizations. Intergy Louisiana plans to reduce long-term debt as issuances mature. We have made significant progress on collecting deferred fuel balances, which came down more than $400 million in the quarter. This continues to improve our credit metrics. Our net liquidity remains strong at $5.7 billion, including $406 million of storm escrow. Looking at slide 9, our equity needs are unchanged. Only $130 million remains through 2024, and we plan to use the ATM program to meet this need. As shown on slide 10, we are affirming our guidance and longer-term adjusted EPS outlooks. Weather has been a headwind to start the year, but we've also had a few tailwinds to our plan. Our first quarter sales mix resulted in slightly higher margins. and we see some favorability in several items that in aggregate are providing meaningful relief. After taking all of this into consideration, we are flexing O&M by 10 cents, which keeps us comfortably in our guidance range. The bottom line is that we have a solid plan with good visibility, and we will continue to execute on the deliverables to achieve steady, predictable growth. And now the Entergy team is available to answer questions.
spk01: At this time, I would like to remind everyone, in order to ask a question, press star then the number one on your telephone keypad. Our first question comes from the line of Char Peraza with Guggenheim Partners. Please go ahead.
spk02: Hey, good morning, guys.
spk09: Morning, Char.
spk02: Good morning. So just real quick on financing, you guys obviously have a CapEx plan through 25, but financing is still based on a 24 plan. When do you sort of anticipate rolling that forward and what can we anticipate in terms of capital allocation, especially in light of the current capital market conditions? Is asset optimization still an option you guys are kind of looking at?
spk04: Thanks for that question. As it relates to our capital plan that, you know, we have $16 billion through 23 through 25, and we've provided the financing for that, which includes that little bit that's left in 24. We have talked about the last time we talked about 25 was an analyst day where we gave a number for 25 and 26. And I would expect, you know, as we turn the corner on 24, we would be looking at that financing more specifically. As it relates to your asset optimization question, certainly we don't have anything new here, but as you know, we would pursue that if it met our three basic grading criteria around is it executable, does it distract, and does it create value. But certainly to the extent that something met that criteria, we would look at it. Got it.
spk02: And then just on some of your recent solar RFPs and kind of announcement, how is that, I guess, kind of tracking versus your plan? you know, for up to 13 gigs and what portion of the new solar is being sort of deployed to support retirement versus new load. Um, and just that initial ownership share versus PPA has always been kind of skewed to contracts. Do you anticipate that's going to change over time?
spk09: Yeah, sure. This is drew and it has been skewed and, uh, And that's not where we want to be, frankly. So we are working hard to improve our self-build capabilities and leverage our economies of scale, find more financial discipline in the packages that we're putting together in those RFP processes so that we can improve. And we do believe that that will happen. But you're right, we haven't been hitting the mark. And that's important because it is creating some it's taking up some of the room on our balance sheet and limiting our operational strategic flexibility in the long term. So we want to make sure that we get up to that number, and we're still working towards it.
spk02: Terrific. That's all I had, guys. Thank you so much. See you soon.
spk09: Thanks, Jar.
spk01: Your next question comes from the line of Durgas Chopra with Evercore ISI. Please go ahead.
spk05: Hey, good morning, team. Thanks for giving me time. I had two questions, both on sort of the resiliency filings. Maybe first part of that question, can you just give us any initial stakeholder feedback that you may have gotten in Louisiana and New Orleans, the two filings that you've made? And second, Drew, in your prepared remarks, you mentioned about this separate docket in Louisiana. Maybe a little bit more color there. Do you have to kind of use that docket for securing the approval in Louisiana or just maybe any other color there. Thank you.
spk07: It's Rod. Good morning. Thanks for the question. Louisiana, in terms of stakeholder feedback, I think part of the answer is in the question that you asked. The fact that the staff submitted proposed rulemaking around resiliency filings for all utilities in Louisiana we view as reflective of a constructive stakeholder engagement strategy for the company over the course of the last six to nine months in Louisiana because the proposed rulemaking actually puts us in a position to be very much aligned given the strategy that we laid out for the commission both in Louisiana and in New Orleans. And so the feedback has been constructive. So our expectation is, as you think about the procedural schedule that Louisiana laid out, they're backcasting from a January 2024 hearing date. Their procedural schedule backs up from that date to give us an opportunity to perhaps settle with stakeholders to accelerate agreement around the Louisiana decision-making. on resiliency. So we view that as a net positive. New Orleans tracks Louisiana in that we have clarity from the city council on our initial proposal, which was 1.5 billion. Through that stakeholder engagement process, we narrowed down the grouping of projects to about a billion dollars at the 1.5. And that 500 billion that didn't make the cut wasn't about wasn't about a lack of agreement on the need for the projects. They just tracked on a different path outside of the accelerated resilience. So in both Louisiana and New Orleans, we view the stakeholder engagement feedback being positive and constructive. And the existence of procedural schedules in both the LPSC and the New Orleans City Council is consistent with our financial plan.
spk05: Awesome. I appreciate that.
spk09: I appreciate that. This is Drew. I have one thing to add to what Ron was saying. Just to make sure you caught at the beginning of his comment, he actually answered the second part of your question in the beginning on the second docket. And that second docket does actually create an ability for us to do the math on how the benefits and the costs should work. It specifically allows the economics of customer outages to be part of the conversation. And so there's a few mechanisms that they create for that, but that's an important piece of that framework that the staff established.
spk07: Thanks, Drew. And I'll also add that in New Orleans, as we think about the $1.5 billion that we initially filed and the $1 billion sort of compliance filing after the feedback process, It's roughly two-thirds of the proposed CapEx and 80% of the customer benefits just going with the $1 billion versus the $1.5 in the accelerated docket process. So, again, we view the feedback as constructive in both Louisiana and the city of New Orleans today.
spk05: I appreciate it, guys. Sounds like solid progress. I'll get back in the queue. Thank you.
spk01: Your next question comes from the line of Julian DeMolen Smith with Bank of America. Please go ahead.
spk11: Hey, good morning, team. Thank you guys very much. Appreciate it. So just pivoting to Siri here and the pending complaints, is it completely path dependent on FERC or are you able to facilitate progress at FERC in any specific way? I just want to come back to that back and forth and just the procedural elements a little bit more specifically here, if you will. And then if I can, as a follow-up, are you still having settlement conversations with perhaps any of the parties considering maybe some of the ambiguities here?
spk07: I think the short answer to both of the frames of your question is settlement discussions will be aided by clarity from the firm that we are awaiting with regard to the sale lease back. and the uncertain tax position ruling, as you recall from the December ruling and the procedural order out in this past February. So, yes, there are ongoing conversations and settlement on all of the ancillary cases, but clarity around where the FERC sits on those two issues will go a long way towards setting the path for our path forward on settlement. Yeah, go ahead. I'm sorry.
spk11: No, I'm sorry. And it seems like it's path dependent on them, right? There's no ability to facilitate progress at FERC or otherwise enable it in a separate parallel docket, as you alluded to a second ago on storage.
spk07: I think that's a fair assessment just given the positions that certain of the stakeholders have taken around their reaction to the December order. Clarity from the FERC will clear the lanes for ongoing discussions. There's also a timing element where we expect the FERC to act sooner rather than later in order to maintain jurisdiction vis-a-vis the Fifth Circuit and others. So we're expecting, we don't have a date, but we are expecting FERC to act sooner to get ahead of what might be the appeals process if left pending. unresolved.
spk11: Got it. Excellent. And then if you can click right on 23 just super quickly on the guidance. I know, Kim, I think you said a second ago about the 22 cents and the 10 cents here of O&M. How much further flex is there in the plan to the extent which obviously other items materialize and or if you can elaborate a little bit more on just the components therein?
spk04: Thanks, Julian. You know, it's early in the year, so we certainly have good line of sight on our ability to manage that through the rest of the year. There are some additional puts and takes that we would manage through depending on what happens. Obviously, if the weather is milder in the summer, we'd have to work through that. If it comes in more normal or hotter, then there may be opportunities to flex up for some specifics. You know, certainly we talked about last year that in 2022, the higher O&M was tied to higher volumes, and we flexed up, which helps us to de-risk 23, and we're able to take advantage of some of that here. And then we've seen some favorability, as you probably saw in the materials, around volumes in residential and commercial, and that may give us continued opportunity throughout the year if that continues to persist. The other area I would point out is interest expense, and we've been able to manage through some potential upside there as it relates to timing of debt issuances, for example.
spk11: Excellent. Thank you. Appreciate it, Kev. Good luck to the team.
spk01: Your next question comes from the line of David Arcaro with Morgan Stanley. Please go ahead.
spk06: Hi, good morning. Thanks so much for taking my question. A little bit of a follow-up on On the last question, I was curious for the utility O&M targets for the year, you notched that up to $0.70 in terms of the savings. But I was curious, it was only about $0.03 of kind of a help in the first quarter. Are there any underlying challenges that you've hit or inflationary pressures or anything like that that make it more difficult to achieve the O&M savings for the year, or is it more just kind of a timing issue versus on a year-over-year comparison.
spk04: Thanks, David. You're right. For the first quarter, we were down about three cents, but our O&M doesn't occur ratably over the year. It's really tied, as I said, particularly last year. We ramped up with the higher volumes in second and third quarter. So I would expect to see, assuming normal weather, a much more spread versus last year in O&M in that second, third, and fourth quarter.
spk06: Okay, gotcha. Thanks. That's helpful. Then I was just wondering, are there any legislative bills in Texas that might be meaningful for your business as we get closer to the end of the session in the state for next month?
spk07: Yes, there are a number of items in consideration. The one that we're certainly paying attention to has to do with resiliency filings, not just Intergy but other utilities. There's five weeks left, so the good thing is that it's been progressing nicely. The significant attribute that we're looking for in coming out of those resiliency filings would be the types of precedents that were set in Texas where when we were making AMI filings in Texas, we were able to take assets that still had useful life out of service and replace them with the newer, more modern, and in this case, more resilient assets, and still be able to account for those undepreciated assets. So we're tracking the progress of those various pieces of legislation to ensure that we have the appropriate flexibility with the commission to facilitate our our resiliency and reliability investments in Texas. So it's moving along. Stakeholder engagement has been strong and quite active, but five weeks or so left in the session. So we'll continue to go at it.
spk06: Okay, great. Thanks very much.
spk01: Again, to ask a question, press star 1. Our next question comes from the line of Ross Fowler with UBS. Please go ahead.
spk03: Morning, Drew. Morning, Kim. How are you? Just one from me around, or two from me, but the first one is on slide 38, so following up with Julian's question. So if I kind of just look through what you're showing here, I see sort of $0.10 of the O&M and then sort of corporate being down $0.05, kind of offsets the $0.05 of better sales mix. So versus the $0.22 of weather, $0.10 is sort of offsets. And Kim, to sort of get into your answer, I think what you were saying there is there's more offsets to come to offset the balance of that $0.12 or maybe some of that's in that slightly favorable impact around other income and lower interest expense. to sort of get back to the midpoint, or absent further mitigation, are you kind of pointing to the low end of the range for 23 years?
spk04: Yeah, Ross, I think you're right in that there are small pennies in a number of categories beyond what you went through there. So, you're right, you have 10 cents in O&M. You've got then 5 cents in parent and other, and the weather volume there is about 5 cents, and we saw that mix in the first quarter. And then you will see probably not specifically in the slide, but just throughout the balance of the income statement, pennies here and there that balance the rest out.
spk09: Yeah, and this, Ross, is true. So while we would certainly concede that 22 cents brings us lower than the bid point, it's early in the year and we wouldn't say that that's where we are at this point. You know, we're just targeting the midpoint, and we expect to do better than that by the end of the year.
spk03: Gotcha. That's very clear. Thank you, Drew. And then just maybe contextualize for me, you're showing 2% industrial growth in the quarter year over year, and Drew, you kind of went through this in some of the remarks, but maybe give us a little bit more contextualization of your sort of 6% long-term aspiration versus what you're currently seeing.
spk09: Yeah, I'll take that. So we've seen, well, we talk about the drivers, and we have a couple of slides in there about the drivers. And as we've said for a number of years now, there's a lot of advantages to the Gulf Coast, and that's access to global and national markets and the available energy infrastructure, low energy prices, supportive communities, available workforce. All of that has been driving investment domestically towards the Gulf Coast and, frankly, our service territory all the way up the Mississippi River. Now you've got the broken global supply chains, geopolitical uncertainty. You've got the tailwinds for the IRA. Before you even get to the IRA, we've seen a lot of onshoring. And that's basically what our 6% is based on. And And we see a lot of investment. The 6% is a probability-weighted assessment of where we think it will come out. That takes into consideration some projects don't always make it to the finish line. Some projects are a little delayed, all that kind of stuff. If all of it landed, it could be significantly larger than 6%, but that's not our planning assumption at this point. Then throw in the tailwinds of the IRAs. And it could get bigger. The rules are still a bit uncertain associated with that, particularly around hydrogen, green hydrogen in particular. But we are seeing an awful lot of interest in the Gulf Coast area to try and take advantage of, frankly, the existing infrastructure that's already there. The hydrogen infrastructure, for example, we have production, we have consumption, we have transportation, we have storage. We have everything that you need to move hydrogen. And we have a lot of people that are coming to the Gulf Coast to try and take advantage of that existing infrastructure. I mean, it is effectively a hydrogen hub already. And similarly, we also have CO2 pipelines and CO2 consumption, CO2 production. And so if carbon capture is going to be the game, there is existing infrastructure for that as well. And so folks are looking at all of that stuff and thinking about how to expand on that opportunity in the long term. And so we see a lot of exciting investment opportunities. In fact, when we were in Texas on Monday for the groundbreaking for Orange County, there was a lot of discussion about hydrogen, about carbon capture with state officials in Texas. They're excited about it. They're excited about the growth opportunities that they see. They're seeing all of it as well. And they are very supportive of us having dispatchable generation to make sure that we can support that potential investment that we believe is on its way. So that's frankly what we're looking at. It's very exciting and a lot of opportunity ahead of us.
spk03: That's great, Drew. Thank you. And of course, you'll be watching the the potential for EPA plant rules around carbon capture, too. But for now, I'll jump back into Keith. Thank you.
spk01: Our final question will come from the line of Stephen Fleischman with Wolf Research. Please go ahead.
spk10: Thanks. Good morning, everyone. Just wanted to follow up on the question related to SIRI, where I think, Rod, you mentioned a timing element. that FERC needs to act before they lose jurisdiction. Could you give us a sense of what that timeline is or limit?
spk07: Yeah, I don't have the actual procedural schedule in front of me, Steve, but it's my appreciation that the Fifth Circuit process that includes actually all of our utility jurisdictions, there's an appeals process at the Fifth Circuit that would impact FERC's ability to provide clarity around that December 23rd decision. And so it's our appreciation from the lawyers that the FERC has an interest in resolving any lack of clarity in avoiding having to create a conflict jurisdictionally between the Fifth Circuit's answer to the appeal from the parties. and their ability to drive their respective order. And so that's why you hear the hedge of sooner rather than later, because we don't know exactly what that timeframe is, but we recognize that objectively it is an issue.
spk10: Okay. And then I guess a question for Drew, just, you know, things have quieted down a lot once the securitization was approved and fuel prices have come down and the like. Could you just give a latest sense of relationships with the Louisiana Commission and do they kind of have appreciation of the volatility that was created around stuff early in the year? Yeah, any caller there would be helpful.
spk09: Sure, Steve, I'll start, but then I'll kick it to Rod, who has the subject matter expertise in that particular area. But it is, you're right, it is a little bit more constructive right now compared to where it was last fall. I know you have to, thinking back to last fall, it's easy to forget that we had an election going on. There were contested elections. There was a lot of outside money in those elections, which were putting additional energy into the political process. And it was coming on the heels of a hot summer with escalating gas prices. And that was all just coming to a point as our securitization was showing up there. We believe that we still continue to have strong relationships in Louisiana and at all levels of the government, including the commission. And so we endeavor to work closely with them on an ongoing basis. But that's still...
spk08: We're not taking that for granted.
spk09: That is something that we are very much focused on. We know that our commissioners are very focused on customer outcomes, and so we are as well. And so I'll turn it over to Rod to talk a little bit more.
spk07: Yeah, and I think, Steve, your preface was on point. The fact that gas prices have come down and we have aided in providing relief to customers And there's been some time since the election that's given us an opportunity to re-engage with commissioners around our customer centric strategy. I think it's proven very helpful. I will note that our most recent engagement with the commission was around a 5-0 vote on the gas business rate case. That was a big deal. The prudency of our Lake Charles power station, along with the gas rate case, was all 5-0. And it is not insignificant that the proposed rulemaking from the staff with regard to resiliency, that too was the result of the intentional work in part that we have done we've done in engaging with the commission and our other stakeholders, especially the customers. So, look, in response to the noise coming out of the elections and the end of the year, we've certainly ramped up our engagement processes to make sure that our commission and staff and related stakeholders are informed. But also, I want to be explicit in saying that the The fact that we have a new commissioner in Louisiana for us represents a new commission. Anytime there's a new addition to the commission, it's an opportunity for us to reassess, reset, and re-engage. And we've been quite deliberate about doing that for the purpose of keeping alignment with the commission. Because we have a real, and you know this, we have a really aggressive commission. regulatory agenda, given all of the myriad of customer-centric opportunities and investments we have in Louisiana and the growth in Louisiana, is going to put a lot of pressure on the Commission. And our engagement process is geared to help make their lives easier as we try to solve our customers' problems. But we get it. and it will be ongoing. It is not a thing where we check the box and say, oh, we have finished the work. The stakeholder engagement process is 24-7, 365, Steve.
spk10: Great. Thank you.
spk01: We have no further questions at this time. Mr. Abler, I will turn the call back over to you.
spk09: Thank you, Regina, and thanks to everyone for participating this morning. Our quarterly report on Form 10-Q is due to the SEC on May 10 and provides more details and disclosures about our financial statements. Events that occur prior to the date of our 10-Q filing that provide additional evidence of conditions that existed at the date of the balance sheet would be reflected in our financial statements in accordance with generally accepted accounting principles. Also, as a reminder, we maintain a webpage as part of Entergy's investor relations website called Regulatory and Other Information, which provides key updates of regulatory proceedings and important milestones on our strategic execution. While some of this information may be considered material information, you should not rely exclusively on this page for all relevant company information. And this concludes our call. Thank you very much.
Disclaimer

This conference call transcript was computer generated and almost certianly contains errors. This transcript is provided for information purposes only.EarningsCall, LLC makes no representation about the accuracy of the aforementioned transcript, and you are cautioned not to place undue reliance on the information provided by the transcript.

-

-