Lines have been placed on mute to prevent any background noise. After the speaker's remarks, there will be a question and answer session. If you would like to ask a question during this time, simply press star followed by the number one on your telephone keypad. If you would like to withdraw your question, press the pound key. Thank you. Alex, you may begin your conference.

speaker
Alex Murray
Vice President of Corporate Development and Investor Relations

Good morning, everyone, and welcome to the Southland second quarter 2025 conference call. This is Alex Murray, Vice President of Corporate Development and Investor Relations. Joining me today are Frank Renda, President and Chief Executive Officer, and Keith Bassano, Chief Financial Officer. Before we begin, I'd like to remind everyone that this conference call may contain forward-looking statements within the meaning of Section 27A of the Securities Act of 1933, Section 21E of the Securities Exchange Act of 1934, and the Private Securities Litigation Reform Act of 1995. Forward-looking statements are neither historical facts nor assurances of future performance. Forward-looking statements are uncertain and outside of Southland's control. Southland's actual results and financial condition may differ materially from those projected in forward-looking statements. Therefore, you should not rely on any of these forward-looking statements and we do not undertake any duty to update these statements. For discussion of some of the risks that could affect results, please see the risk factor section of Form 10-K for the year-end December 31st, 2024, that was filed with the SEC on March 5th, 2025, and discussion on Form 10-Q for the quarter-ended June 30th, 2025, that was filed with the SEC last night. We will also refer to non-GAAP financial measures, and you will find reconciliation in the press release relating to this conference call, which can be found on the investor relations page of our website. With that, I will now turn the call over to Frank.

speaker
Frank Renda
President and Chief Executive Officer

Thank you, Alex. Good morning, and thank you for joining Southwind's second quarter 2025 conference call. I want to take a moment to acknowledge some recent operational accomplishments across North America. In Florida, we celebrated a significant milestone with the opening of the US-1 Jupiter Federal Bridge, a project that will improve transportation for the region. We also successfully started driving the first 60-inch piles for the Shands Bridge project, a critical step forward on the new bridge over the St. Johns River. In Toronto, our team successfully flooded the Ashbridge's Bay Outfall Tunnel, a major achievement that marks the nearing completion of this multi-year, large-scale project. Finally, our work with the Army Corps of Engineers continues to progress. our teams have now installed the first gates on the center hill and wolf creek dam gate replacement projects in tennessee and kentucky these achievements are a testament to the hard work and dedication of our employees who are the driving force of our company thank you to all our teams for their unwavering commitment to safety and operational excellence now to discuss our quarterly results We reported second quarter revenue of $215 million and gross profit of $13.4 million. Consolidated gross profit margin was 6.2%, an increase from negative 15.9% in the prior year period. The improvement was driven by strong performance in our new core work and less impacts from legacy projects in this quarter versus the same quarter last year. Our teams performed well this quarter despite unfavorable conditions, including adverse weather. It is encouraging to see the strong, consistent results in our core business as evidenced by our civil segment, which delivered a gross profit margin of 18%. This is a direct result of our disciplined bidding strategy and our team's expertise in executing complex, high-value projects. Revenue for the quarter was lower than anticipated due to impacts from weather and timing on new project starts. We had two water resource projects in the West totaling over $340 million in combined contract value that experienced delayed starts that were outside of our control. Both projects have now started, and we expect them to ramp as we progress through the end of the year. During the quarter, we added approximately $67 million in new awards. This was led by the McNeil Tunnel Project in Austin, Texas, bringing our total backlog to approximately $2.32 billion. We are excited about the success we are having in converting high margin, short duration projects to backlog. We continue to be excited about the opportunities bidding in both segments in the back half of this year. So far in the third quarter, we have executed a $77 million contract in our transportation segment for a bridge rehab project for a private client in the Pacific Northwest. We also have been awarded or are the low bidder on an additional $65 million of new projects that we are finalizing contracts on, which we expect to convert to backlog in the third quarter. Our outlook on the market remains unchanged. We're confident that sustained investment and robust demand for infrastructure, especially from federal and state governments, will serve as a powerful tailwind for our business for years to come. The IIJA is in full swing and continues to be a major catalyst for our industry. We're seeing robust demand driven by this federal funding. The current federal infrastructure cycle will expire in 2026. But we believe this funding will provide a strong tailwind for our business for several more years as it takes time for projects to work through design, permitting, and ultimately construction. We're also optimistic that there will be bipartisan support to reauthorize spending to address the nation's critical infrastructure needs. State and local spending is strong in our key markets across the Sunbelt. We're also seeing state and local governments developing long-term plans to meet the demand caused by population shifts and aging infrastructure. In May, the Texas Senate passed House Joint Resolution 7, which if passed in November by voters, will unleash $20 billion for water infrastructure development projects across the state over the next two decades. This is a significant investment in one of our core markets. We are well positioned to help rebuild and expand Texas's water resources. This is just one of the many examples of the strong demand for our services, which we expect to continue for the foreseeable future. With a strong pipeline of opportunities from private and public clients, we have excellent visibility into future demands. We continue to be selective in our approach, focusing on improving profitability over top line growth. We are excited about upcoming opportunities and have pending proposals, including the Pier 31 extension at the Naval Submarine Base in Groton, Connecticut for the Naval Facilities Engineering Command. We also expect to propose on the Eleuthera Glass Window Bridge in the Bahamas and phase three of the Winnipeg North End sewage treatment plant. We are currently constructing phase one of the program and are in the pre-construction phase of phase two of the program. We also expect to propose on the Alkasan-Ohio River Tunnel and numerous water resource projects across the Sun Belt. In closing, our teams performed well in the quarter despite some challenging conditions. We continue to make good progress winding down legacy work and are excited about the opportunities in all our end markets. While we are operating in an environment of strong market tailwinds, we are also aware of the challenges in our business. Our strategy is clear, focus on high quality, high margin work, proactively manage our cost structure, and maintain strong financial discipline. Our improved margins this year are a clear sign that this strategy is working. We are confident in our ability to continue to convert our new core backlog into profitable results and create long-term value for our stakeholders. We remain excited about our future and the strong market position we have built. With that, I'll now turn the call over to Keith for a financial update.

speaker
Keith Bassano
Chief Financial Officer

Thank you, Frank, and good morning, everyone. I'll discuss an overview of our financial performance during the second quarter for 2025. You can find additional details and information in the financial statements, footnotes, and management's discussion and analysis that were filed on Form 10Q last night. Revenue for the quarter was $215 million, down $36 million from the same period in 2024. Gross profit was $13.4 million, an increase of $53 million from the same period in 2024. Gross profit margin in the quarter was 6.2% compared to negative 15.9% in the prior year. Selling general and administrative costs in the second quarter were $13.6 million, a decrease of $2.1 million compared to the same period in 2024. The decrease was primarily due to lower pre-construction expenses compared to the same period in 2024. Interest expense for the quarter totaled $10 million, up $3.3 million from the prior year. This increase was primarily driven by an increase in interest expense related to a real estate transaction that closed in the second half of last year, increased interest rates on borrowings, and increased deferred financing costs. We anticipate interest expense to average approximately $9.5 million per quarter going forward. Income tax benefit was 0.1 million for the quarter or an effective tax rate of 0.6% compared to income tax benefit of 16 million in the same period last year. We expect our effective tax rate to be in the 20 to 24% range subject to the impact of tax credits, non-deductible expenses, and state and local tax adjustments. We reported a net loss of 10.3 million or a net loss of 19 cents per share in the quarter compared to a net loss of 46 million or a net loss of 96 cents per share in the same period last year. In the second quarter, we produced EBITDA of 4.2 million compared to EBITDA of negative 49.9 million for the same period in 2024. Now to touch on segment performance for the quarter. Our civil segment had revenues of 81.5 million compared to revenue of 79.4 million in the same period in 2024. Our civil segment gross profit was 14.6 million, an increase of 5.4 million from the same period in the prior year. As a percentage of revenue for the quarter, our civil segment had gross profit margin of 17.9% compared to 11.5% in the same period in 2024. For the quarter, our transportation segment had revenues of 133.9 million, a decrease of 38.3 million from the same period in 2024. Our transportation segment had a gross loss of 1.2 million, an increase from a gross loss of 49.2 million in the same period in the prior year. As a percentage of revenue for the quarter, our transportation segment had a negative gross profit margin of 0.9%, compared to a negative gross profit margin of 28.6% for the same period in 2024. The materials and paving business line contributed $21.7 million to revenue and $3.8 million in gross loss in the second quarter. At the end of the quarter, we had approximately $99 million of remaining M&P backlog. This is down from $139 million at the end of last quarter. We anticipate to be substantially complete with these projects by the end of 2025, with three projects final completion tailing into 2026. Our transportation segment margin was negatively impacted in the quarter by an unfavorable adjustment of $7 million on a legacy bridge project in the Midwest. This legacy project had significantly impacted our results over the past several years, and we are now down to the final remaining contract items on the project. The new bridge opened earlier this year and demolition of the old bridge is well underway. This project is expected to be completed later this year. Our remaining non-MMP legacy backlog is now 40 million, down from 59 million last quarter. Excluding the impacts of MMP and unfavorable adjustments in our non-MMP legacy backlog, gross profit in the quarter in both transportation and civil segments produced double digit margins. We expect legacy projects to have less of an impact on the overall results as we continue to wind down these projects. This ongoing transition to a more profitable backlog is a key part of our long-term strategy and a major driver of our improved margin profile. We finished the quarter with approximately $2.3 billion of backlog, of which we expect to burn approximately 41% over the next 12 months. Thank you for your time and interest in Southland. I'll now pass the call back to the operator for questions.

speaker
Operator
Conference Call Operator

As a reminder, to ask a question, simply press star 1 on your telephone keypad. And our first question comes from the line of Kevin Ganey with Thompson Davis. Please go ahead.

speaker
Kevin Ganey
Analyst, Thompson Davis

Good morning, Frank, Keith, Alex. It's Kevin on for Alex, or Kevin on for Adam. Hey, good morning, Kevin.

speaker
Alex Murray
Vice President of Corporate Development and Investor Relations

Good morning.

speaker
Kevin Ganey
Analyst, Thompson Davis

um frank i know you kind of highlighted two uh awards that you guys closed in starting q3 and then you rattled off a list of some con uh opportunities in the future i was wondering with those opportunities are they more second half weighted or are they likely to come maybe 2026. yeah we're excited about the second half so there there is um

speaker
Frank Renda
President and Chief Executive Officer

A lot coming in the second half, but also in 2026, you know, the overall, overall, the pipeline remains strong. We expect demand to remain strong and while confident we can secure new projects across all of our markets. Our main focus is on increasing margins, not not just increasing revenue. We've really been focusing on cleaning up the legacy work and taking a measured approach to adding new work. So we want to make sure these projects fit us perfectly with all the right resources.

speaker
Kevin Ganey
Analyst, Thompson Davis

That sounds good. And then civil margins, if you guys could maybe touch on how you feel that may trend in the second half of the year, given the strong first half.

speaker
Frank Renda
President and Chief Executive Officer

So civil margins have been strong, and we're excited about how our teams are performing here. The teams did well this quarter. In longer term, I'd expect civil margins to be in the mid-teens. We have a great deal of confidence in both civil and transportation segments. We see internally on a job-by-job basis how our new core projects are performing and the strong margins in our backlog. However, some large unexpected swings from disputes and older projects have overshadowed these results. And it's going to take a little bit more time, Kevin, for these new projects to have a meaningful impact. But we're excited about the long-term potential of both businesses.

speaker
Kevin Ganey
Analyst, Thompson Davis

I like the sound of that. And then just a quick one on cash flow. What are you guys thinking for operating cash flow in the back half? Is there any chance that could swing positive Q3, Q4?

speaker
Keith Bassano
Chief Financial Officer

Yes. No. So speaking of cash flow, so we had a use of operating cash flow here in the quarter, but we do expect that to pick up in Q3 and Q4, just normal cadence. And we're in the peak construction season right now.

speaker
Kevin Ganey
Analyst, Thompson Davis

Perfect. Sounds good, guys. I'll hop back in the queue. Thanks, Kevin. Thank you.

speaker
Operator
Conference Call Operator

And your next question comes from the line of Christian Swapp with Craig Hallam. Please go ahead.

speaker
Christian Swapp
Analyst, Craig Hallam

Thanks for taking my question. So my first question has to do with the commentary regarding the higher margin short duration work. Can you just elaborate on that a little bit further? um you know the increased opportunities that you're seeing there and is that something that you expect to continue on a multi-year basis are you just being opportunistic in the short term so we we see a lot of opportunity uh in the civil market right now Christian there's uh there's tons of projects that

speaker
Frank Renda
President and Chief Executive Officer

are out there for us in core markets for owners that we've worked for in the past, have great relationships with. Also, on the CMAR side, there are so many opportunities. So we see it as a near-term opportunity. We're going to continue to focus on those higher margins, short duration. And we also see this market, you know, this strong civil market continuing into next year and years down the road as well.

speaker
Christian Swapp
Analyst, Craig Hallam

Great. And then as far as, you know, we haven't discussed this in a while, at least on conference calls, but now that we're getting finally near the done of the MNPI work, and completion of that and a lot of business to win and the focus, as you said, on increasing margins, not necessarily focused on driving substantial revenue growth. You know, as we look to, you know, maybe beyond 26 as, you know, the three projects that trail off and, you know, what is a target you know operating margin range as large as you want to make it that you think the company can you know uh operate at um at that time frame you know we haven't been in the public market for uh for an extended period of time Christian but uh you know we've we've been doing this for uh for a couple of decades now

speaker
Frank Renda
President and Chief Executive Officer

And we couldn't be excited about more excited about the long term opportunities. You know, we, we look at some of the programs that are out there and the infrastructure need. You know, here appear in North America. And there's, there's just so many, there's so many opportunities for us to pick up really meaningful projects that will increase our, our margin. So we're going to stay. we're going to stay disciplined. What we've done and gone through the past couple of years really should set us up, is going to set us up for long-term success. So we have the right crews available. We have, you know, tailwinds in our business and really expect to increase our margins, you know, and hopefully those mid-teen civil margins and low-teen transportation margins will be out there in the near future for us.

speaker
Christian Swapp
Analyst, Craig Hallam

Fantastic. And then my last question, you know, can you give us an update on, you know, potential timing or resolution in some form or fashion, you know, of

speaker
Frank Renda
President and Chief Executive Officer

you know the massive amount of unresolved contracts that that are in dispute yeah so Christian you know we continue to work through and make small progress on settling Legacy claims no major updates this quarter on on larger claims we continue to work vigorously to collect every dollar that we are owed and expect positive cash flow from these claims in the coming quarters you know, it's important that we remember most of this work, you know, was picked up in that 2017, 18, 19 timeframe. So, you know, we're a year closer now than we were last quarter at this time. And, you know, getting some of the owners to the table. So we can't, yeah, can't go on forever. And we're going to continue to fight for every dollar that we've earned and had to, finance you know so many of these these projects self-finance so many of these projects that the owners are reaping the benefit from great thank you no other questions thanks christian and your next question comes from the line of the julio romero with cenote and company thanks morning frank and keith hey good morning julio hey frank i uh

speaker
Julio Romero
Analyst, Cenote & Company

My ears perked up a little bit when I heard you mention Civil Segments' expertise on executing complex high-value projects. Can you give us a refresher of Southland's value products with regards to complexity and handling complexity and what you guys bring to the table?

speaker
Frank Renda
President and Chief Executive Officer

Absolutely. I think we're a very unique company in the civil market. We can do all aspects, really, of heavy civil work. We do the underground. We do the tunnels. water and wastewater treatment plants, all types of marine work. And, you know, we pride ourselves on cross-training, you know, our employees. So we have an expertise that not many people do of our size where we self-perform about 80% of the critical path work and take on some really challenging projects another thing that we do is you know we'll manufacture some of our own tbms and there's there's not a lot of companies around that have the manufacturing capabilities that we do is that we do so it gives us some real competitive advantages and i think that's why you see us in so many one or two bitter uh situations on on these uh civil projects and those are tunnel boring machines helpful and thanks for the clarification on the acronym there

speaker
Julio Romero
Analyst, Cenote & Company

Historically, you guys have been about 80% tied to public spending in terms of the projects you target. Have you seen any change in the pace of awards on the public side? And you mentioned IIJ funding. How much runway do you think is left for projects you would target that would have IIJ funding and kind of help us think about Southland's exposure to federal versus state and local and other funding sources?

speaker
Frank Renda
President and Chief Executive Officer

Yeah, so so first on the question, I think we've seen less than 50% of the money has been spent to this point. We kind of mentioned in the prepared remarks. It really takes some time for these projects to work through the design and permitting before people like us, the contractors get involved. We're optimistic that this funding will be reauthorized next year. We mentioned the resolution in Texas. which would deploy another $20 billion to address just the state's water needs. So we're seeing states trying to prepare for this spend in addition to the federal money. Our country has neglected our infrastructure, you know, a bit for decades. You can look at the different end markets we are in, and the stats are just incredible. Roughly 7% of the nation's 623 bridges are in poor condition. The dams in our country have an average of close to 60 years old, and nearly 17,000 dams in the country are considered high hazard potential, meaning there's a likelihood of harm to residents if the dams were to fail. You can see stats like this across different infrastructure in markets, and they're really hard to believe. So the bottom line is, we believe it's critical to the country's success that we improve the aging infrastructure. So we feel there will be sustained long-term demand for what we do. And what we do is historically been 80 plus percent in the public market. We're going to continue to focus on the public market. But if private opportunities arise in the same type of work that we do, that could shift over time. So pretty good demand on the private side and really good demand on the public side right now in our market.

speaker
Julio Romero
Analyst, Cenote & Company

Great context there. Last one for me, if I may, is just on the civil segment. Given the shorter duration project focus of civil, should we still be looking at kind of a quarterly high single-digit backlog conversion run rate going forward?

speaker
Keith Bassano
Chief Financial Officer

Um, so, you know, with the, uh, with the civil, I would, um, I guess, let me ask you this. Can you, can you just clarify the, uh, backlog conversion?

speaker
Julio Romero
Analyst, Cenote & Company

Yeah, I'm just, uh, dividing your sales figure by, by the backlog and back it into about 9% for this quarter, eight and a half for last quarter. Oh, I'm sorry. I'm looking at, uh, uh, 8% this quarter, 11 last quarter.

speaker
Keith Bassano
Chief Financial Officer

Yeah, I think, I think we're going to be pretty consistent there. We, We're going to be pretty consistent there for civil. We did have a couple of projects that encountered some impacts during the quarter. Outside of our control, we expect those to ramp up a little bit more as we get into the second half of the year. So we could see a little bit of an uptick, but nothing too significant.

speaker
Julio Romero
Analyst, Cenote & Company

Really helpful. Thanks very much.

speaker
Keith Bassano
Chief Financial Officer

Thank you.

speaker
Operator
Conference Call Operator

And our final question comes from the line of John Valise with David Davidson.

speaker
John Valise
Analyst, David Davidson

Hi, good morning. Thank you for the time.

speaker
Kevin Ganey
Analyst, Thompson Davis

Hey, good morning. Good morning.

speaker
John Valise
Analyst, David Davidson

Could you perhaps provide more color on what the revenue impact was to each segment due to weather? And just as a follow-up, are you expecting to revenue catch up revenue more weighted on third quarter, or do you expect it to just carry on more or less evenly to the second half?

speaker
Keith Bassano
Chief Financial Officer

Yeah, so let me speak to the revenue decrease here to start. As I mentioned, we did have those couple of delays, not necessarily weather driven by those two, but those both have been since resolved. We do anticipate revenue to normalize in the back half of the year. Again, we're in peak construction season, so we anticipate certainly a pickup over where we were in Q2. We really don't disclose as far as weather impacts by segment. That said, weather in the south has been wet for us, and we did see some impacts there to the business.

speaker
John Valise
Analyst, David Davidson

No problem. Thank you. And then just following on the questions on civil. So just based on the commentary, we should expect, continue to expect at least about mid-teens margin portfolio 2025. Is that how I, am I reading this right?

speaker
Keith Bassano
Chief Financial Officer

Yeah, so we've demonstrated those mid-teen margins here over the last couple of quarters. And as for any impacts from the legacy civil work, we expect to see that going forward.

speaker
John Valise
Analyst, David Davidson

Perfect. No problem. And then just one last one for me. Just focusing now just on transportation. You were regarding the materials, and I guess just focusing on materials and paving. Is there a possibility of just catching up in the second half of 2025 a little faster, or do you expect to just stick to the guidance, what you provided early on?

speaker
Frank Renda
President and Chief Executive Officer

So, you know, on M&P, we're down to just a handful of M&P projects left, which we expect to be substantially complete by the end of the year. And some projects' final completions dates slip just a bit and expect three projects to completely wrap up in the first half of next year. But the impact to overall results continue to get smaller each quarter. You know, if you look at, you know, legacy burn, at the end of last year, we had 246 million total legacy backlog, and we're down 139 million at the end of this quarter. So, we've worked down approximately 107 million so far through the first two quarters. We're making good progress, but it will just take some time before this is completely behind us and getting closer every day we expect most of this to burn off again in the next two quarters with a couple tailing in the next year hey i appreciate that commentary thank you so much for the time hey thank you john thank you and with no further questions in queue i will hand the call back to frank renda for closing remarks i appreciate Appreciate everybody joining. You know, the last couple of years have been challenging, and we're doing the right things to set the company up for success in the long term. We haven't been a public company for very long, but we have been doing construction for a long time. Things are trending in the right direction, and we believe the company's performance over the next five years will be significantly different from what we've seen in the past few. Appreciate your support and look forward to talking to you next quarter. Thanks, everyone.

speaker
Operator
Conference Call Operator

Thank you again for joining us today. This does conclude today's conference call. You may now disconnect.

Disclaimer

This conference call transcript was computer generated and almost certianly contains errors. This transcript is provided for information purposes only.EarningsCall, LLC makes no representation about the accuracy of the aforementioned transcript, and you are cautioned not to place undue reliance on the information provided by the transcript.

-

-