Hello, and welcome to the Scholz Technologies Group Inc. Third Quarter 2024 Earnings Call. My name is Alex, and I'll be coordinating the call today. If you'd like to ask a question once the presentation has finished, please press star, followed by one on your telephone keypad. If you'd like to remove your question, you may press star, followed by two. I'll now hand it over to our host, Matt Trachtenberg, to begin. Please go ahead.

speaker
Matt Trachtenberg

Thank you, Alex, and thank you everyone for joining us today. Hosting the call with me is our CEO, Brandon Moss, and our CFO, Dominic Bardos. On this call, management will be making projections or other forward-looking statements based on current expectations and assumptions, which are subject to risks and uncertainties, which should not be considered guarantees of performance or results. Actual results could differ materially from our forward-looking statement. Risk factors include, among other things, those described in our filings with the Securities and Exchange Commission including economic market and industry conditions, project delays, the effects of competitive dynamics, volume discounts and other customer mix in our key markets, defects or performance problems in our products or their parts, including those related to the wire insulation shrinkback matter, failure to accurately estimate the potential losses related to such matter, and failure to recover those losses from the manufacturer. decreased demand for our products, policy and regulatory changes, supply chain disruptions, and availability and price of our components and materials. Today's presentation also includes references to non-GAAP financial measures. You should refer to the information contained in the company's third quarter press release for definitional information and reconciliations of historical non-GAAP measures to the comparable GAAP financial measures. Please note that the slides you see here are available for download from the investor relations section of our website at investors.scholes.com. With that, let me turn the call over to Brandon.

speaker
Brandon

Thank you, Matt, and good morning, everyone. I'll begin by sharing some thoughts on the current events that we're all navigating and provide some color on markets we operate in. I'll then spend some time discussing the progress we're making with customers, new products, and growth opportunities. Dominic will then review our financial results for the quarter and provide our outlook on the remainder of 2024. Like many of you, I'm pleased that the election uncertainty is behind us. While we've seen recent volatility in solar equities, we believe the outlook for US utility-scale solar remains bright. While some have expressed concern the new administration will enact policies that harm the domestic solar industry, It is important to remember that there are almost a half a million jobs tied to solar and storage. Those jobs are in both red and blue states and have support from both parties. In fact, almost three times more clean energy investment occurred in Republican congressional districts than in Democratic districts since the IRA was enacted. Of the top 10 congressional districts that have attracted the most clean energy investments, nine are led by Republican lawmakers. The IRA has not only advanced clean energy, but has had meaningful impact on the local and national economy, regardless of political affiliation. While we may see some elements of the clean energy tax credits look different in the coming four years, we believe solar will fare well. Recall that Shoals does not receive any 45X credits and employs over a thousand people across the U.S. As a member of the Solar Energy Industries Association, We're proud of the bipartisan work we've done to advance the solar industry in America. In our opinion, the clean energy transition is more important now than ever before and is crucial to meeting the increasing need for more power, both in the U.S. and globally. While nuclear power will play a role in future energy needs, the extended timelines and costs associated with nuclear projects reinforce our belief in solar's position as the most efficient near-term solution for addressing immediate power needs. The recent FERC ruling rejecting the Amazon and talent agreement is telling. We continue to believe that solar is positioned to deliver the power we need today, and we will help our customers deploy it as quickly and efficiently as possible. There will always be macro headwinds of some form to navigate, this much we know. But we remain focused on creating value for our customers and shareholders over the long term. And from where I'm standing, there's a lot to celebrate. In the near term, as we've shared with you all year, the timing of when projects are awarded to the EPC by developers and in turn to us by the EPC has been lengthening. Delays are a curve reality for us and others and are seen across project size, geography, and choice of panel or trackers. In addition, they are independent of the depth and scope of our relationship with the EPC. We remain close to our customers, and that color is in turn offered here to you. In some cases, the developer is renegotiating the PPA, given the ever-shifting financial assumptions, and others, permitting is taken longer than planned. In some, the project's place in the interconnection queue remains too distant to continue construction or financing without adjustment, and yet in others, rapidly increasing labor costs have required another review of the project's economics. These projects are not canceled, and neither are agreements with customers related to these projects. The industry is at a unique point. On one hand, our power needs are off the charts, fueled by AI, onshoring, and volatile weather. On the other hand, solar is among the lowest LCOE and quickest time to deploy, but is currently challenged by regulatory and supply chain issues. There are more than 2,600 gigawatts of generation and storage capacity actively seeking grid interconnection. It's increased eightfold in the last decade and is now more than twice the total installed capacity of the existing U.S. power plant fleet. Solar, battery storage, and wind accounted for 95% of the active capacity in the queue at the end of 2023. Simply put, it's been a clear bottleneck, but I'm confident these issues will ease in time. Based on EIA data, as of July of this year, only 40% of utility-scale solar projects are on schedule. 60% are delayed. That is 10 percentage points higher than the same time last year and double the percentage of 2022. We do not believe these delays will continue in the long term, and so we remain flexible and stay close to our customers. This quarter was very busy for us. Revenue came in within our guided range at $102.2 million, driven by our team's solid execution. In August, Scholz received a favorable initial determination from the ITC regarding our patent infringement case against Voltage. We view this victory as an extremely important step in protecting our intellectual property. The target date for completion of the ITC investigation is scheduled for late December and final resolution following a potential presidential review in February 2025. As previously stated, We plan on pursuing damages in our pending district court case. We are also committed to ensuring a new, expanded BLA patent portfolio receives the same level of protection. In September, we held our first Investor Day, which is available for replay on our website. We presented a comprehensive strategy and product roadmap, our key growth opportunities, introduced lots of new faces on our leadership team, and shared our three-year financial objectives. We continue to believe our strategy is sound and we will win in the marketplace and operational improvements will drive increased shareholder value. We also came away from customer conversations at REplus in September increasingly optimistic. Most agree that the industry is poised for growth again and that if some of the transitory issues can be alleviated, current industry forecasts could prove conservative. Our compelling value proposition, new innovative products, and investment in our commercial organization are beginning to deliver results as evidenced by our updated revenue guidance, which is near the high end of our prior outlook. We are improving relationships with existing customers, establishing relationships with new customers, and increasing the agility and flexibility in how we deliver our products. The proof points appear not only in the 70% of the market we've traditionally addressed, but in the incremental 30 that we are now pursuing. We've built a strong and experienced team that is purely focused on taking exceptional care of our customers. It's exciting to watch and even more encouraging to hear the feedback. We've quoted almost $2 billion worth of projects this year alone. Following the initial ITC rolling, we signed up four new EPC customers. In 2023, a record revenue year, there were four top 10 EPCs in the US that combined contributed less than $1 million of revenue to Schultz. Those same four customers have driven more than $25 million of revenue this year so far and have a combined four gigawatts in backlog and awarded orders. We've shipped our first project to the new very large EPC we signed an MSA with earlier this year. They have potential to be one of our largest customers going forward. We are very pleased with the quality and diversity of our order book. Wallet share amongst our largest customers remain steady, as evidenced by the 12 gigawatt MSA we signed this summer. It's worth noting that no portion of that 12 gigawatt MSA is in our backlog. The investments we've made in our commercial plan are yielding results, and I'm very proud of the progress that we've made. Some of the success we are seeing on the commercial front is driven by a renewed commitment to product innovation. 2KV is a great example. This is an advanced electrical system designed to increase the voltage in solar projects to 2000 volts, improving the efficiency, sustainability, and cost effectiveness of solar installations. Scholz is uniquely positioned to drive this change. Previous transitions to higher voltage have been a game changer, especially for utility scale solar, because they've dramatically reduced the cost per watt of energy production, and we expect the transition to 2kV to have a similar impact. We have an exciting pilot plan with industry leaders like GE Brnova, and we're looking forward to showing customers how 2kV can change their business. One of the growth initiatives we presented at our investor day in September was CCNI. This market is approximately 10% of the size of utility-scale solar in the U.S., but growing at an attractive pace. Additionally, we believe it leverages our current strengths and application expertise and utilizes many of our current products and manufacturing capabilities. Our value proposition is compelling to these customers as well, so we believe it's a natural fit. Our focus on the CC&I market and the investments made to address this opportunity in 2024 have been significant. We've built an experienced commercial and product development team to focus specifically on this market. In 2024 so far, we've quoted 64 projects and have already begun shipping product. We've also signed an agreement with one of the largest distributors in the space. In summary, we're stepping on the gas. And while we're proud of how far we've come so quickly, I'm even more excited about what 2025 will bring. Battery Energy Storage Solutions is another exciting opportunity, and one we're investing in heavily. We've hired an experienced industry veteran to lead the business unit, increased our marketing efforts, and heard very positive feedback from customers on the new standardized configurations we introduced at RE+. We understand where we fit in the market, and we believe that we have the right products today. recombiners, and disconnects. The market is expected to experience significant growth in the coming years to more than double in size by 2027. We believe our strategy is sound and our core value proposition is compelling. I look forward to sharing more project wins as this business builds momentum through 2025. In summary, there are always going to be market disruptions or macro issues to navigate, and today is no different. We recognize there are numerous and often conflicting views on the state of the sector within our economy. However, markets have historically overestimated the impact of macro disruptions on the downside and under appreciate the abilities of good companies to navigate those challenges. Shoals is a high quality company with a marquee customer list and leading market share and attractive markets with an experienced team. I'm very confident in where we are and the direction we're headed. With that, I'll now turn it over to Dominic, who will discuss our third quarter financial results and our outlook for the remainder of the year. Dominic?

speaker
Brnova

Thanks, Brandon, and good morning to everyone on the call. Turning to our financial results, third quarter net revenue declined 23.9% to $102.2 million year over year, but increased 2.9% sequentially. The year-over-year decline in net revenue was largely driven by project delays, which we've been discussing all year, and to a lesser extent, the competitive dynamics, volume discounts, and customer mix. Gross profit increased to $25.4 million compared to $14.2 million in the prior year period. We recorded a $13.3 million charge related to wire insulation shrinkback remediation in the current period This resulted in GAAP gross profit percentage of 24.8% compared to 10.5% in the prior year period. I'll provide more detail on this in a moment. Adjusted gross profit percentage, which excludes the effect of that warranty charge, was 37.9%, largely driven by higher labor costs, some non-recurring operational charges, volume discounts, and to a lesser degree, lower fixed cost absorption. We continue to target 42% adjusted gross profit percentage over the longer term. Adjusted EBITDA was $24.5 million compared to $48.0 million in the prior year period. Adjusted EBITDA margin was 24.0% compared to 35.8% a year ago, driven largely by lower sales and adjusted gross profit percentage. General and administrative expenses were $18.7 million compared to $22.6 million during the prior year period. The year-over-year decrease in G&A expense was primarily related to lower stock-based and incentive compensation. Approximately $2.3 million of G&A expense was specifically related to the ongoing wire insulation shrinkback litigation. Net loss was $0.3 million compared to net loss of $9.8 million during the prior year period. Adjusted net income was $13.9 million compared to $33.4 million in the prior year period. As I mentioned earlier, I'd like to provide some additional color on the status of our warranty remediation. We've been working hard on identifying and remediating shrinkback of the Prismian wire we've spoken to you about. And while the pace of new sites requesting inspection has fallen to one or two per quarter, we have gained a better understanding of the resources, time, and expense required to remediate the problem harnesses while minimizing disruption to these operating sites in the field. Due to the performance variability of the prismian wire in the field, together with these other variables, we feel it prudent to continue providing a range. As inspections occur, we've noted that some sites exhibit shrink back, while others do not. At this point in the process, based on additional information obtained in the quarter, we are able to tighten the potential range of outcomes. We now believe the likely range is $73 million on the low end to $160 million on the high end, and we continue to track to the low end of that range. It is important to note that the increase in the low end this quarter is a function of a higher estimated cost per site requiring remediation, not a higher quantity of sites. We anticipate completing remediation of the identified sites known to us at this time in mid 2025. Customers have been supportive of our plans and are pleased with our efforts. During the quarter, we spent $6.3 million in cash for that remediation and had a remaining shrink-back warranty liability on our balance sheet of $53.0 million as of September 30th. The current portion of the remaining liability related to shrink-back is now $33.0 million. As a reminder, this represents the amount of cash we estimate we will consume during the next four quarters as we continue remediation efforts. This does not reflect any potential recovery from prismium or increased reserves if our assumptions or knowledge of facts change. We expect this figure will be more than covered by our projected free cash flow over the same period. Our legal case against prismium is progressing as planned, and we expect written discovery and depositions to be completed by mid 2025. Cash flow from operations in the third quarter was $15.7 million, while capital expenditures were $2.4 million. Approximately $5 million of CapEx that we anticipated spending in 2024 will now occur in 2025. This is purely a function of timing around the planned move to our new consolidated factory next year. This change in timing will be reflected in our revised 2024 CapEx guidance I'll provide today, and the 2025 guidance we will provide on our fourth quarter call in February. Our balance sheet remains very strong, and we ended the quarter with net debt to adjusted EBITDA of 1.2 times. Optimizing our balance sheet is crucial to maximizing financial flexibility and long-term growth. By carefully managing our assets and liabilities, we believe we can ensure efficient use of capital, reduce costs, and position the company to seize new opportunities as they arise. Turning to our share repurchase program, the initial $25 million accelerated share repurchase was funded in the second quarter of this year. 60%, or approximately 2.2 million of the total shares repurchased, were delivered in Q2. The remaining 40%, or approximately 1.7 million shares, were delivered during the third quarter, as is normal practice with an ASR. there is $125 million currently remaining under the share repurchase authorization. We will continue to evaluate the cash deployment opportunities that we believe yield the highest return for shareholders. While we continue to believe our shares are trading below their intrinsic value, given the current market uncertainties, we value the flexibility that our current liquidity provides. Backlog and awarded orders ended the third quarter at $596.6 million, a sequential decline of $46 million, largely a function of the timing of projects awarded to customers. However, we've seen notable strength in the fourth quarter so far, adding almost $60 million of new projects to awarded orders as of last week. As of September 30th, approximately $455.2 million of our backlog and awarded orders have planned delivery dates in the coming four quarters, with the remaining $141.4 million beyond that. We are coming up on the end of 2024 and are cautiously optimistic as we look ahead to 2025. While we cannot control the regulatory environment or the availability of electrical equipment needed to complete solar fields, We can work to ensure customers get the quality products they need from Shoals in a timely manner and to manage our costs responsibly. Turning now to our outlook. Based on current business conditions, business trends, and other factors, for the quarter ending December 31st, 2024, the company expects fourth quarter revenue to be in the range of $97 million to $107 million. adjusted EBITDA to be in the range of $23 million to $28 million. Those figures imply that for the full year 2024, the company now expects revenue to be in the range of $390 million to $400 million, and adjusted EBITDA to be in the range of $96 million to $101 million. In addition, Adjusted net income to be in the range of $58 million to $62 million. Cash flow from operations to be in the range of $70 million to $80 million. Capital expenditures to be in the range of $8 million to $12 million. And interest expense to be in the range of $12 million to $16 million. With that, I'll turn it back over to Brandon for closing remarks. Brandon? Thank you, Dominic.

speaker
Brandon

I want to close by offering some additional color on the environment we're navigating and the transformation taking place at Shoals. We believe we are at the cusp of a meaningful investment cycle within the clean energy sector. Our long-term financial model incorporates the Wood Mackenzie outlook of conservative growth in the U.S. utility-scale solar market, which we believe is realistic and achievable. At the same time, we cannot ignore the potential energy shortfall we expect over the next decade or fail to recognize the favorable position solar is in to address it. We've detailed at length the processes, capabilities, and strategies we've deployed that will help ensure we continue to win in the marketplace. We've identified attractive market segments, geographies, and new products that will enable us to leverage our strengths and diversify our portfolio. We've seen incredible traction with existing customers, signed MSAs with multiple new EPCs, and are winning back wallet share with others. Our product innovation engine is running on all cylinders, and we are releasing exciting new products. We are building a world-class team of seasoned business leaders and are streamlining operations in a new facility that will allow us to optimize our footprint to become lean and agile. The transformation we've been talking about with you is beginning to change the look and feel of Shoals in ways that customers, investors, and employees are noticing. In closing, 2024 was a challenging year for Shoals and others in the industry. However, given our momentum and supported by our backlog and awarded orders, we believe we'll return to growth in the upcoming year. I want to thank all of our shareholders and customers for their continued trust, in our employees for their hard work and dedication. Operator, we are now ready to take questions.

speaker
Operator

Thank you. As a reminder, if you'd like to ask a question, please press star followed by one on your telephone keypad. If you'd like to remove your question, you may press star followed by two. Our first question for today comes from Ryan Lee of Goldman Sachs. Your line is now open. Please go ahead.

speaker
Ryan Lee

Hey guys, good morning. Thanks for taking the questions. I guess one on the ITC decision, I just kind of had maybe a little bit of a clarification or housekeeping question. My understanding was that there was a deadline for review, which is this week, maybe today. Have you heard any updates there? And if there are no updates, does that effectively mean there will be no review and the initial ruling is, you know, going to be largely representative of the final ruling? Maybe walk us through that a bit. And also, if I have the timing right and I had to follow up, thanks.

speaker
Brandon

Brian, hey, thank you for the call. Good morning. I think you're right on the timing. It's either today or tomorrow, if I recall correctly, on the deadline for review. Look, I think there's, in these cases, there's issues that come up from review from time to time. I don't think that that should lead to any assumptions on how the case would turn out. So if there is something that is reviewed, it is a common occurrence. What we're looking for is that final determination that comes at the end of December. And to your question, have we heard anything about potential items up for review? We have not at this point. Having said all that, look, we still remain excited about the initial determination. It was a win for Shoals. And, you know, look, I think probably as importantly, we plan to protect our new BLA patent portfolio as we did the last one. And we'll continue to pursue this case in the district court following the final outcome of the ITC.

speaker
Ryan Lee

Fair enough. That's helpful. And then just a question on bookings. A bit softer this quarter, but then Dominic, appreciate the commentary around what bookings strength you're seeing at the start of this quarter. I know it's lumpy, but can you give us a sense of that run rate relative to where you were during the third quarter, you know, it would seem like the better competitive landscape, the election out of the way, you know, some of these new opportunities and customers you're talking about, you should see some meaningful strength in bookings activity with some of those headwinds out of the way. And, you know, based on the comments you made about the early start to Q4, maybe you're indicating that, but just any sense of, How sustained do you think the bookings momentum could be here in Q4 and maybe a comp to where you were at this point last quarter? Thanks, guys.

speaker
Brnova

Yeah, Brian. Yeah, thanks for that. Yeah, we've seen some good strength as we started the quarter. I think, as I mentioned in the remarks, we think there's some timing. There were some just folks holding out, as you mentioned, on some of the order processing. We have a very, very healthy pipeline. We've had quoting activity hit record levels. Some of the projects that are coming back online and coming through now from the award standpoint are represented in both 2025 revenue and some are already for 2026. So we haven't guided to where the quarter is going to land. We just wanted to say this isn't the first time we've seen this. I think a year ago we had a dip and we said, hey, there's some timing issues going on. But we're very pleased with the commercial gains that we've had, the customer engagement that we've had, some of the new customers since the ITC initial determination that we've had. So I'm very, very pleased with where we stand right now with our bookings. All right.

speaker
Operator

Thanks, guys. Appreciate it. Thank you. Our next question comes from Mark Strauss of JP Morgan. Your line is now open. Please go ahead.

speaker
Mark Strauss

Yeah, good morning. Thank you very much for taking our questions. Dominic, just one question for me. The gross margins in 3Q came in slightly below your target range of 40% to 45%. You mentioned a few things. I think you said some non-recurring operational items. There might have been some other things. Can you just give us a bit more color on exactly what those were and how to think about gross margin going forward? Thank you.

speaker
Brnova

Sure, absolutely. So, as you know, we've talked about some of the labor challenges when you're trying to have a volatile revenue plan coming in and out and how we've managed labor. We did run some elevated labor in the period. We also had some more unusual items that hit in the period, some supply chain things, some factors that impacted our efficiency on the floor. to make sure we had materials coming in at the right time. And when you're air freight heavy materials, because there was just a snafu with some supply chain issues, it has an impact within the period. So I think the margin in and of itself, there are always going to be operational things. It just seemed like we had a few that were all coming in against us in Q3. I do not characterize them as long-term issues. Our guide for the long term remains solid. We believe that the 40 to 45% target range is absolutely solid for us.

speaker
Brandon

Next question, Alex.

speaker
Operator

I'll take the rest off. Thank you. Our next question comes from Philip Shen of Roth Capital Partners. Your line is now open. Please go ahead.

speaker
Philip Shen

Well, thanks for taking my questions here. Want to follow up on the bookings thread. So was wondering with the commercial success you're having if we see book to Bill at one or one to one in Q4, do you see potential for that with the election? But I'm sorry, I'll just pause there. I'll take the I'll start with the next one.

speaker
Brnova

Yeah, Phil, absolutely. I'm encouraged where we are in the quarter. We'd like to get that book to build back over one. So that's absolutely our target.

speaker
Brandon

Phil, maybe just to jump on to Dominic's point and to give a little bit more color about our bookings and commercial activity. Look, we've talked about over the course of the last couple of quarters, the investment we've made in our commercial organization. We've done it across sales, product management, and marketing, and that's beginning to pay dividends for us. And it's coming through in the results, right? We've quoted $2 billion worth of projects. That's up basically 50% year over year. A lot of those project quotes are due to our flexibility and new innovations that we're bringing to market, which is really neat to see. We've talked a lot about the past few quarters in talking about our wallet share. We had four EPCs that in 2023 did less than a combined million dollars with us. We've got $25 million year to date with those EPCs and we've got four gigs in our backlog and awarded orders. We've seen four new EPCs as Dominic mentioned since the ITC ruling. become customers, which is fantastic. We've started shipping our new large EPC that we talked about earlier in the year. We've launched a project with them that's now being deployed, which is great. And look, we still have things going with our top customers and our historical top customers. None of the 12 gigawatts that we talked about earlier this year in our new MSA is in our backlog today. So we feel really good about the progress we're making on the commercial side of the business, and we are moving. So I expect strong bookings.

speaker
Philip Shen

Great. Brendan, thanks for the caller. Shifting over to the election results, The auction's over. We're likely in for a red sweep, and that could result in uncertainty around the IRA and the incentives there, including the ITC. So our checks suggest these changes could result in a pause of activity in U.S. utility-scale soaring 25. I know it's really early. We're just a week out, but Have you had those conversations yet with customers? What's your sense in terms of the risk around slowdowns and pushouts for this new kind of headwind potentially?

speaker
Brandon

Yeah, Phil, that's a great question. Probably goes without saying. We here in Portland, Tennessee still love the solar market. We're excited about it. You know, there has been varying degrees of of opinions on how things will play out. I lean back just on the power needs here, specifically in the US. We're seeing 3% to 5% load growth over the course of the next five years. That may be an understated number. That's roughly 1,000 terawatt hours of power that that is going to be consumed with data centers consuming probably 10% to 15% of that. A lot of conversation around nuclear here, probably more so the last 60 days than before. Obviously, that generation source has its place on the grid. I think it's probably worth pointing out that those plants won't be generating. The new generation probably doesn't come online for five to seven years. And I think we saw some things play out there with the Amazon and talent situation here in the last couple of weeks. So look, we think, you know, solar still being lowest LCOE, quickest to deploy. And we've got projects, you know, that are ready to go nationwide, which is exciting. So I think the new administration is going to be supportive of that. I think there's a recognition that, that, you know, US has to dominate on the gen AI front and, um, and we've got to have power to do that. A lot of, uh, investments, as you know, in red States, I live in one of those Georgia where we've seen substantial investments. So you've got, um, you know, you've got some strong governors in red States that, that have, that have been supportive of the renewables industry. And, um, And also in Congress as well, with nine out of 10 top invested areas being Republican congressmen. So I'm excited about the new administration, and I hope the theories about a pull forward or an acceleration in supporting solar and U.S. manufacturing holds true. Thanks, Phil. Alex, next question, please.

speaker
Operator

Thank you. Our next question comes from Kashi Harrison of Piper Sadler. Your line is now open. Please go ahead.

speaker
Kashi Harrison of Piper Sadler

Good morning, everyone, and thanks for taking my questions. So, you know, first one for me, on slide, I think, 16, you talk about $445 million of backlog scheduled to ship within the next 12 months. You know, what are some of the parameters that underpin that statement, just given, you know, the lower contracted backlog in Q3 and The delays that we've seen all throughout 2024, just trying to understand, you know, the confidence in that 445 million.

speaker
Brnova

Sure. So actually, it's Dominic. Yeah. So of the 455, you're right that some of that 455 in the next few quarters, which takes us through three quarters of 2025, include delayed projects from 2024 that we had talked about earlier in the year. So, you know, it's not necessarily a forecast of our revenue. We're not necessarily calling our shot for 2025. But it is based on our book of business right now, which I think over the past year has gotten healthier. I think there were some delays. I think projects that were on the fringe may have we have may have told you about earlier quarters that we push some back into the pipeline. So I think our book of business is healthy. We've had good momentum this quarter thus far. The next four quarters are based on project timelines and delivery dates expected by the customers. And we remain closer to those customers than ever. So I really believe that the health of our book of business is very strong. And did you, sorry, did you talk? I appreciate that. Oh, sorry, go ahead.

speaker
Brandon

Sorry, go ahead, Kaushik.

speaker
Kashi Harrison of Piper Sadler

Yeah, sure. So just my follow-up question. I think last quarter you highlighted, Brandon, that your top 10 customers represented 61% of your backlog at awarded orders. Can you give us a sense of what that top 10 looks like right now? Thank you.

speaker
Brandon

Yeah, great question. You know, at this point, I don't want to get into details of the specifics of that backlog and the way it is assorted amongst customers. Again, the only thing that I would point out is I think about our backlog and awarded orders becoming healthier, as Dominic said, and more diverse. Again, I'd lean on the statement that I made earlier that we are really focused on wallet share of customer, like we've talked about all year. And we're starting to see the dividends of that being paid with, again, $25 million revenue of four top tenant EPCs flowing through already this year with four gigawatts of backlog and awarded order. So we're excited about our order book, quality and diversity of that.

speaker
Brnova

If I could add just one thing, there is a delay right now at the EDGAR site with SEC, so our queue is not available to you. But in the first nine months of the year, customer A's concentration has now reduced to about 30% from last year, running 34, 35. So I think the diversity that Brandon was talking about is manifesting itself in our revenue recognition as well. So I just want to point that out that the Q and our 8Ks have been filed and accepted, but they're just not published on the edgar.gov website yet. There's an issue on their end technically. I just want to put that out there.

speaker
Brandon

Thanks, Kashi. Alex, next question, please.

speaker
Operator

Thank you. Our next question comes from Christine Cho of Barclays. Your line is now open. Please go ahead.

speaker
Christine Cho

Good morning. Thank you for taking my questions. Just on a follow-up about that backlog and that $455 million of deliveries, when projects are delayed, are you using your discretion of how long it's going to be delayed, or do you actually have firmer timelines from the customers of how much it's going to be delayed? And, you know, you talked about how there's no cancellations, but that was another thing I wanted to ask. Like sort of, you know, is there any, I guess, what's the, you know, from a customer standpoint, can they just like indefinitely delay? Or like at what point do they actually cancel?

speaker
Brandon

Yeah, Christine, good question. It's Brandon. Maybe I'll take the first part of that. We do not use our discretion in how we're pacing the backlog and awarded orders out or the potential award date. We're actually sitting down with our top customers on a weekly basis and we go through their construction schedule. So many of our top customers will share that schedule with us from the time they're putting pilots in to the time that they're putting modules on tracker. So we've got a great understanding of of those dates and timing. And we blow that through our CRM, which drives these backlog and awarded order numbers. So while not totally perfect, we feel pretty good about that information. And we've been getting better and better and more rigorous around it as the year has gone. Dominic, maybe you want to hit the second part of that?

speaker
Brnova

Oh, I was prepared to do the first one. I'm sorry. What was the second part? Christine, I'd be happy to.

speaker
Christine Cho

the can't like indefinitely postponing versus the cancellation.

speaker
Brnova

Yeah, I apologize for forgetting that I was all focused on the first part. Yeah. So we have backlog. We actually have a contract. And as you know, we've had one cancellation in the past year. I think it was we talked about in Q1 that was actually a cancellation with one of our top customers that was beyond their control. And we work with them on cancellation fees, et cetera, how to reapply some things if we could. With awarded orders, we do not have the contract yet. And so those can be delayed for a while. We've had some of our European projects or international projects, I should say, that actually they've had delays. We're still on the slate for the award. We just don't control when those projects are going to go forward. So we don't control that. We don't consider it something that we would remove unless we think the project has lost funding. If we hear that the EPC is now not able to do the work because they have a conflict. We did move some projects like that up back into pipeline to rebid with other EPCs. So that does happen occasionally with awarded orders, but not with backlog.

speaker
Brandon

The move back up the pipeline was Q2. I believe that we did that. But again, talking about our order book, Christine, we feel very strongly about the quality of it. And I guess just to reiterate, and I know you've all heard this, that when these projects delay, they push out. Shoals is not losing the projects. They're just slower to deploy than we had originally scheduled due to the plethora of different situations that we've talked about all year due to high interest rates, renegotiating PPAs, and it could be even EPCs, you know, renegotiating construction costs with the owner or developer. So we feel great about our order book moving forward.

speaker
Brandon

Thanks, Christine. Alex, next question, please.

speaker
Operator

Thank you. Our next question comes from Jordan Levy of True Securities. Your line's now open. Please go ahead.

speaker
Jordan Levy

Thanks for taking my questions. Just a quick one on back project timing. And like you said, there's a lot of complex dynamics here. But just on a high level and kind of a normalized environment, how far out do you typically book projects for the following year? And at what point could you still be booking incremental orders for a 2025 delivery?

speaker
Brandon

Jordan, you, uh, we lost sort of the first part of that question, but I think I've got it. So, um, yeah, look, we're, we're booking orders out, um, into 2026, um, you know, right now. So projects and the project, uh, cycle, as we've talked about has elongated all year where it used to be, you know, closer to a nine to 12 is stretched out probably more on an average standpoint to 13, 14 months now. So, um, While things are elongating and that's bad, it does give us better visibility for the long term, which is ultimately a good thing for the business. As far as our book and turn business, we can usually book and turn things within, I'd say, nine to 12 months is probably typical.

speaker
Brnova

Yeah, there's always some of that. Now, when we give guidance for 25 at the end of the year in February, we will really have a really solid idea of the first couple quarters because the book and turn business with lead times will really be back half generated. But it is still possible up through the first half of the year to book things at once. That's part of the business that happens with us every year. In fact, as we talked about last time on our quarterly guidance, we anticipated booking some additional business in the year that will, in fact, play out that way. And we did have some projects push out the way we guided. So we anticipated both sides of that equation happening, and that's really how we're seeing it play out this year. So we can still book additional 2025 projects, I'd say, through the first half of 2025.

speaker
Brandon

Also important to point out, we're talking about the scale right now. For our CC&I business, it's a quicker turn business. As that becomes more impactful to Shoal's overall revenue, I think we've got the ability to generate some quicker book and turn business. We talked about in the remarks, we've quoted 64 projects and we're starting to see some revenue flow through in 2024. which is great and confident that'll accelerate in 2025.

speaker
Brandon

Jordan, do you have a follow-up?

speaker
Jordan Levy

Yeah, just a quick one. I appreciate that on the international side of things. I know Gary and the team and all of you have worked hard to get a new product set there, Super Jumper and Trench BLA and that sort of thing. I just wanted to see if we could get any color on how customers are responding post the rollout of some of those products.

speaker
Brandon

Yeah, Jordan, we have seen substantial quoting activity post-Intersolar when we've launched those products, which has been very exciting for us. Again, we're in a long sales cycle business, so no huge wins to report yet as it relates to the new products on the international front. but we are seeing, I would say, pretty drastically increasing quoting activity, which is a positive sign for us. So more to come on international. I like our strategy and the direction we're going there.

speaker
Brandon

Thanks, Jordan.

speaker
Brandon

Alex?

speaker
Operator

Thank you. My next question comes from Andrew Patoko of Morgan Stanley. Your line is now open. Please go ahead.

speaker
Andrew Patoko

Thanks. Good morning, guys, and thanks for taking the question. Most of the questions have been answered, but maybe just one quick follow-up on the margin question. In the slides, you mentioned volume-driven discounts as one of the drivers for the lower gross margin in the quarter. Obviously, you guys have been focused with, you know, regaining wallet share with some of your top EPCs. Can you just discuss a little bit more about how you're approaching pricing and some of these volume-driven discounts on a go-forward basis, and maybe what that means for margin recovery in the fourth quarter of 2024 and then into 2025. Thank you.

speaker
Brnova

Sure. So as we've talked about, and I think we reiterated at our investor day, pricing is always a discussion and we always look at the volume of business. And historically, we had not had these master supply agreements in place. And so historically, while we may have been negotiating pricing differently based on an EPC and the volume that they provided, we now have MSAs in place, have very scripted volume arrangements for some of them, not all, but some do. And so in the in the case, as that becomes more significant, we will increase disclosures around that in the future because it's now something that we can calculate. There's a very specific accounting guidance for that. So as we look at those things, I want to make sure that we're very clear that we do want to have partnerships when we sign a twelve and a half gigawatt deal. You certainly want to make sure that you reflect that with your top customers. And so as those things become more significant to drive top line growth, there might be some percentages associated with that on the discount side. So it's nothing unusual for us. It's not a new thing. It's just now that it's kind of been memorialized in MSAs, it will become something that we will disclose more about probably in 25.

speaker
Brandon

Andrew, just to jump on that a little bit, I do want to reiterate our third quarter gross margin being at 37%. did have some non-reoccurring issues in there and some other things, as Dominic outlined. Our Q4 guidance, and I know we don't guide to gross margin, but it does reflect higher EBITDA margins, which would lead you to believe that we're going to drive some higher margins on the We do not think of 37.9 as a go forward or acceptable margin for us. Having gotten to that in Q4 and are confident we can get it back to the range that we have been discussing all year, the 40-45 or 42% range. Thanks, Andrew. Alex?

speaker
Operator

Thank you. Our next question comes from Anit Satish of Wells Fargo. The lines are open. Please go ahead.

speaker
spk11

Thanks good morning, maybe just going back to slide 16 looks like you expect 76% of the quarter book to convert to revenue in the next 12 months, which is, which is actually up from last quarter when I think the metric was 72%. I guess what's driving that improvement and then you know just given the current macro backdrop, do you think we could see this metric hold steady or continue to improve into Q4?

speaker
Brnova

Yeah, so a couple things on that. One, as we mentioned, some of the projects that we thought were being kind of delayed indefinitely were pushed back out of our awarded order book. The order book, we believe, is healthy, probably the healthiest it's been in a few quarters, simply because there was some shakeout in 2024 for everybody in the industry. so the improvements i would say um a couple things are driving that we we believe that some of the delays that we saw earlier in the year that we now have you know the customers good timelines so we have good expectations of when uh some of those awards and when purchase orders will be coming through for those materials um and i believe that the the market um now that the election is behind us and ppas that had to be renegotiated have been renegotiated Those customers that have come to us with projects such as following our victory at the ITC, you know, those are projects that were probably already on the books and they need to have materials. So we feel very confident in that timeline of our order book right now.

speaker
spk11

Got it. That's, that's helpful. And maybe just, you know, staying on this, this, this concept here of revenue conversion cycles, as you, Patrick Corbett- kind of look out over the next few years when you compare international utility scale CC and I batteries. Patrick Corbett- What are the revenue conversion cycles for each of these verticals look like compared to your traditional domestic utility scale market, and do you think overall you could see. Patrick Corbett- You know that that percentage of the amount of the order book that converts to revenue in the next 12 months, do you think that could. kind of skew up or down over the next few years based on the verticals you're entering?

speaker
Brnova

Yeah, so a few things about that. I think at our investor day, we did talk about some of the ramp. And as we target our 12% to 18% growth over time, not all of these verticals will grow at the same speed. And revenue conversion cycles are certainly a factor in that. As Brandon mentioned, CC&I has a relatively shorter conversion cycle. We can find out about projects. We can build a product. We can recognize revenue in a shorter timeline. Some of the things internationally we have proven to take longer than our US utility scale base. So we factor that in because we still have some awarded orders that have had delays even longer than we've seen here in the US. I don't believe things are getting worse for us from a utility scale standpoint. When we look at projects that went COD, we're still averaging about 13 month lead time in front of when a project goes COD. I think our customers in the construction side, they figured out timelines about when to really maximize their efficiency and use of cash when they build these things. And they now know how to place orders with us. So we're not seeing anything worse in that standpoint. And I think with battery energy storage, those are relatively quick turnarounds. We can get those cabinets, those combiners and disconnects turned around relatively quickly. And so I think it really varies on the vertical. We're excited about all of our growth verticals, but the revenue cycles are certainly not getting any worse at this point.

speaker
Operator

Alex? Thank you. Our next question comes from Joseph Osher of Guggenheim Partners. The line is now open. Please go ahead.

speaker
Joseph Osher

Thank you. Good morning. Two questions. First, looking at the redesigned voltage product, which was excluded from the ITC, you all have mentioned your patent portfolio a number of times this morning. Might we expect that you

speaker
Brandon

begin to look at your your other options for uh addressing competitive outcomes with that redesigned voltage product and and i do have a phone joe we'll totally tip our hand there um but you know like we've said we we will continue to uh to protect our patent portfolio we feel very strongly about our two new patents related to the bla product line um so so more to come there

speaker
Joseph Osher

Great, thank you. And then just returning to this revenue conversion question, this bookings conversion question, given how timelines have stretched out and how hard it's been to predict timing, obviously C&I and whatnot is a separate issue, but why would it make sense in your 2025 outlook to build in any book and chip, just given the way the business looks and given the experience of 2024 in utility, that is.

speaker
Brnova

Joe, would you like to come present to our board of directors so I can get a good plan approved for next year? Seriously, though, that's a great question.

speaker
Andrew Patoko

I'd be glad to. You know me.

speaker
Brnova

Seriously, that's a great question. We do look at what's been happening, and as we work with our customers, We are starting to have even tighter integration on construction timelines. As we've talked about the master supply agreements that we've signed with some very large EPCs, they share very detailed specs. And so we can really look at projects that they are bidding on that they hope to move forward with in the back half of the year. And if we feel like they have a great shot at winning those those projects and they do get an awarded order, we should be able to count on that. We know the percentages of the business that we're going to get. So, yeah, it's always risky. As I mentioned before, I think it was last time that this is the first year where our revenue for the year is going to be below the backlog and awarded orders that we started the year with. Usually, we can target getting another 10% lift or something on top of what the backlog and awarded order book is at the end of the year. So we're going to look at that. We are very sensitive to the dynamics facing our customers, but we're also very confident in our relationships with them that we would have confidence to put those jobs into our back half if they win those jobs.

speaker
Brandon

Alex, let's see if we can squeeze in one last question.

speaker
Operator

Thank you. Our final question for today comes from Colin Rush of Oppenheimer. Your line is now open. Please go ahead. Thanks so much.

speaker
Colin Rush

Thanks so much for squeezing me in, guys. Can you talk a little bit about the competitive environment separate from Voltage, any competitors that you're seeing start to emerge, and any needs from your customers, thinking about second sources or alternate solutions for what you guys provide?

speaker
Brandon

Yeah, Colin, great question. We've seen really some exciting engagement between our commercial team and customers. We're working hand-in-hand with them to try to really improve deployments around eBoss. There's been sort of, I guess, a restart of our voice of customer efforts here in the last year, so to speak, and we're starting to see the benefits of that. You'll see some new products from us probably over the course of the next year, some adaptation of products as a result of that. You know, we talked about the 2KV product and the prepared remarks. That's an exciting new product line for us. But we're really focused on customer satisfaction. dynamics and making sure that we're meeting their needs not only on the specific product side but we have gotten much more flexible around the packaging and how we kit products to deliver them on site to uh to make us more competitive by unlocking additional value for our customers so that that's our focus in terms of the broader competitive landscape You know, we're always going to have competition. We command a great share in the marketplace. People understand that. They'll always be nipping at our heels. But I like what we're doing specifically in the space right now to maintain and continue to grow our share. We are at the top of the hour.

speaker
Matt Trachtenberg

Thank you. We're at the top of the hour. That's all the time that we have for questions today. I want to note that we do have a very active investor relations calendar through the end of the year. It can be found on our IR website. So please join us for one of those events. If you can, we'd love to meet with you. If we can help you further, please reach out to the investor relations team at investors at shoals.com with any questions. Thanks, everybody, for joining us today. Have a great day.

speaker
Brandon

Thanks, all.

speaker
Operator

Thank you all for joining today's call. You may now disconnect your lines.

Disclaimer

This conference call transcript was computer generated and almost certianly contains errors. This transcript is provided for information purposes only.EarningsCall, LLC makes no representation about the accuracy of the aforementioned transcript, and you are cautioned not to place undue reliance on the information provided by the transcript.

-

-