spk09: Stand by. Good day and welcome to the Chenier Energy Inc. Q2 2022 earnings column webcast. Today's conference is being recorded. At this time, I would like to turn the conference over to Randy Batia. Please go ahead, sir.
spk12: Thanks, operator. Good morning, everyone, and welcome to Chenier's second quarter 2022 earnings conference column. The slide presentation and access to the webcast for today's call are available at Chenier.com. Joining me this morning are Jack Fusco, Chenier's President and CEO, Anatole Fagan, Executive Vice President and Chief Commercial Officer, and Zach Davis, Executive Vice President and CFO. Before we begin, I would like to remind all listeners that our remarks, including answers to your questions, may contain forward-looking statements, and actual results could differ materially from what is described in these statements. Slide two of our presentation contains a discussion of those forward-looking statements and associated risks. In addition, we may include references to certain non-GAAP financial measures, such as consolidated adjusted EBITDA and distributable cash flow. A reconciliation of these measures to the most comparable GAAP measure can be found in the appendix to the slide presentation. As part of our discussion of Chenier's results, today's call may also include selected financial information and results for Chenier Energy Partners LP, or CQP. We do not intend to cover CQP's results separately from those of Chenier Energy, Inc. The call agenda is shown on slide three. Jack will begin with operating and financial highlights. Anatole will then provide an update on the LNG market, and Zach will review our financial results and guidance. After prepared remarks, we will open the call for Q&A. I will now turn the call over to Jack Fusco, Chenier's president and CEO.
spk04: Thank you, Randy. Good morning, everyone. Thanks for joining us today, and thank you all for your continued support of Chenier. I'm pleased to be here this morning to review our second quarter 2022 achievements and discuss our 2022 positive outlook. The second quarter achievements were highlighted by the positive FID of Corpus Christi Stage 3 earlier this summer. In June, we issued a full notice to proceed to Bechtel, which had already commenced early construction under a limited notice to proceed earlier this year. The strategy of releasing Bechtel under limited notice to proceed ahead of a full FID continues to pay dividends as it locks in schedule and cost, which is especially important in today's inflationary environment. We're excited to move forward on this highly economic growth project, which will strengthen our market-leading LNG infrastructure platform and provide much-needed LNG to the global market. The FIDA Stage 3 is a milestone the entire Chenier workforce should be proud of, as it was made possible by everyone's dedicated and tireless efforts to bring this project to fruition. Over the last decade, Chenier has set the bar on safety and project execution, and we look forward to continuing those results with Stage 3. Please turn to Slide 5, where I will review some of the key operational, financial, and strategic highlights from what was a very busy and successful quarter, as well as introduce our upwardly revised financial guidance ranges for the full year. For the second quarter, we generated consolidated adjusted EBITDA of approximately $2.5 billion, and distributable cash flow of approximately $1.9 billion, as margins in the LNG market remained significantly above historical norms, and our focus on operational excellence continued to be rewarded. Our EBITDA and cash flow metrics for the second quarter both exceeded what we achieved in the first half of 2021, a powerful illustration of the impact of world-class execution and safe, reliable operations, which have become synonymous with the Chenier brand. The energy crisis in Europe continues to evolve, and it is at the center of a tragic and devastating war. The United States is blessed with an abundance of low-cost natural gas, and I am proud that our collective efforts at Chenier are having a direct and positive impact on the lives of so many people around the world. We produced, loaded, and exported 156 cargoes in the second quarter, as our operations benefited from the full quarter of operations of Train 6 at Sabine Pass. As of the end of the second quarter, nearly 225 cargoes of LNG which is over 70% of the cargoes produced at our facilities so far this year, have landed in Europe. By comparison, in the first half of last year, less than 40% of the cargoes produced by Chenier landed in Europe. Clearly, the benefits of the flexibility inherent in the commercial structures of our contracts are on display. That is enabling the LNG we produce to reach the markets with the greatest needs. For the third quarter in a row, our guidance ranges for 2022 are moving higher by over a billion dollars. We now forecast consolidated adjusted EBITDA of $9.8 to $10.3 billion and distributable cash flow of $6.9 to $7.4 billion, thanks to the expected lump sum payment by Chevron under the termination of the regasification TUA and marketing margins moving higher compared to our prior forecast. Zach will address guidance in more detail in his comments in a few minutes. On the marketing origination front, Anatole and his team have been racking up frequent flyer miles and bringing home more long-term contracts with customers around the world looking to secure long-term reliable supplies of LNG in support of energy security and energy transition. Just since the start of the second quarter and through July, We have entered into long-term contracts, aggregating approximately 140 million tons through 2050. Since our first quarter earnings call, we announced long-term SPAs with POSCO International, Equinor, Chevron, PetroChina, and PTT. All of these contracts extended beyond 2040, and the PetroChina SPA is our first LNG contract that extends into the second half of this century. Over the last 12 months, we have signed SPAs and IPM deals, aggregating up to approximately 15 million tons per annum and up to over 240 million tons in aggregate. The contracts with Equinor, Chevron, and PetroChina each contain a provision where the long-term contracted firm volume will double either once we make a positive FID on liquefaction capacity expansions at Corpus Christi beyond Stage 3, or we unilaterally commit to the volume. So after reaching FID on Stage 3 only weeks ago, we've already sold an incremental almost 3 million tons per annum of volume beyond Stage 3. Those contracts clearly demonstrate the demand in the market, and my leadership team and I are very focused on Cheniere's next phase of growth. The investments we made at Sabine Path and Corpus Christi over the last decade provide both of those sites with significant brownfield expansion opportunities. And you can be certain we're pursuing growth at both facilities. At Corpus Christi, we see a number of potential ways to leverage the infrastructure we've built or are building to add economically advantaged LNG capacity from a smaller scale addition that could conceivably be done faster. all the way to a very large expansion on the land adjacent to Stage 3 we've shown you in the past. At Sabine Pass, with our third berth nearing completion, infrastructure hurdles to expanding SPL are being cleared, and we are currently developing plans for a potentially significant expansion of that facility as well. Later this year, I look forward to providing more detail on our growth plans at both Sabine Pass and Corpus Christi as we move into the regulatory process and communicating our enhanced capital allocation plans for the coming years. Turn now to slide six. On these calls, you've heard me talk about our operational excellence program. That program establishes the key operating philosophy of Cheniere, of which safety, reliability, and efficiency form the foundation. That program ensures safe operations and maintenance of our facilities while maximizing production and efficiency. While always one of my key priorities, operational reliability has become a key focus of those outside Chenier as well, especially with high LNG market prices in Europe in the midst of an energy crisis. First and foremost, with respect to safety, we have a safety first culture at Chenier and I'm extremely proud that our safety record demonstrates that. On the bottom of slide six, the graph shows our total recordable incident rate, the preeminent safety metric of an operating facility, and a metric that is part of the compensation calculation for each and every Chenier employee. You can see that not only have we exhibited consistent improvement over the course of last year, during which we commissioned and started commercial operations of train six, but also that Chenier's performance in this metric is comfortably within our industry's top quartile. Safety and reliability go hand in hand. It signifies an employee's ownership in the facility. A strong safety metric in operations typically leads to reliable operations of a facility. The middle of this slide shows our facility utilization since 2021, which is yielding production consistent with our run rate range of 4.9 to 5.1 million tons per annum per train. Our utilization is consistently above 90%, compares favorably to the 2021 global average of about 80%, and demonstrates the value of our operational excellence program. I tell our operations leadership team that safety is an investment, not an expense, and the return on that safety investment is clearly in the results we reported this morning. Turn now to slide seven. We'll highlight two significant milestones we recently achieved with respect to our ESG and climate and sustainability initiatives that demonstrate Cheniere's leadership position in these areas. First, during the second quarter, we commenced providing our cargo emission tags or CE tags to our long-term customers. These tags are the first of its kind innovation in our industry. and provide our customers with the estimated greenhouse gas emission profile of each LNG cargo, from the wellhead to the cargo delivery point. The data on the tags is calculated utilizing our proprietary lifecycle analysis, improving the accuracy of the emissions data relative to industry estimates. Cheniere CE tags are a tangible result of our prioritization of data-driven environmental transparency. We expect the tags will help identify opportunities to quantify and improve environmental performance throughout the LNG supply chain. In addition, in June, we published our third annual corporate responsibility report entitled Acting Today, Securing Tomorrow. I'm proud of the continued progress we are able to detail in these annual reports as Cheniere is emerging as a leader in ESG for natural gas companies with a focus on being actionable, not aspirational. On that note, I want to take a moment to address some of the recent news and speculation regarding Chenier, the EPA, and the National Emission Standards for Hazardous Air Pollutants, or NESHAP rule. The EPA recently lifted a near two-decade stay of that rule covering the types of turbines which we utilize above Sabine Pass and Corpus Christi. At Chenier, regulatory compliance is a strategic priority consistent with our ESG focus on being actionable, our company values, and our commitment as a responsible operator. We work constructively with federal, state, and local regulatory authorities to ensure prudent operations in compliance with current regulatory requirements. We value the fact that we operate under a regulatory regime in this country that seeks and values input from industry, and we have been in touch with the EPA regarding our concerns with respect to the rule. Currently, we are working diligently at our facilities to perform the initial testing required by the NESHAP. While we don't believe our turbine should be subject to the rule, as the use in LNG operations was not contemplated by EPA in the original 2003 rulemaking, we will work with the EPA and the relevant state agencies to develop an acceptable path forward to compliance, if applicable. At this time, it is too early to discuss what, if any, specific changes would be needed. However, we are confident that, if necessary, we'd be able to develop a solution that would enable compliance without a material, financial, or production impact. My conviction in Cheniere's LNG platform has never been stronger. We look forward to continuing to lead the LNG industry in terms of safety, operational excellence, and environmental transparency. in order to provide the world with a cleaner, more secure, and reliable energy solution. Thank you all again for your continued support of Chenier. I will now turn the call over to Anatole, who will provide an update on the LNG market.
spk06: Thanks, Jack, and good morning, everyone. Please turn to slide nine. As everyone is aware, the energy world has been caught in a maelstrom of geopolitical and macroeconomic events that are feeding volatility and heightening uncertainty in the market. all of which have had consequential impacts on supply, trade patterns, and consumer behavior across energy commodities. Amid this volatility, total LNG demand continued to grow, albeit constrained by lack of new supply and sustained elevated prices, undoubtedly contributing to the record amount of commercial activity in the second quarter. After a brief pullback in LNG spot prices in the second quarter, we've seen concerns over the dependability of Russian pipeline supply plus numerous LNG supply issues pushed JKM and TTF forward curves back into the $40 to $50 an MMBTU range through the coming winter, pushing European electricity prices to record highs. JKM prompt month futures continued to trade at a discount to TTF during the quarter as Europe priced cargoes away from Asia, and this discount has widened as a result of further cuts to gas flows into Europe in recent weeks. During the quarter, we saw pipeline imports from Russia into Europe, excluding Turkey, continue to fall, reaching modern-era lows of just over 5.5 BCF a day in June, prior to Nord Stream's annual maintenance period. U.S. LNG imports into Europe, excluding Turkey again, surpassed Russian pipeline volumes for the first time in June and again in July. On the LNG side, there have also been several supply disruptions, as well as seasonal maintenance activities, which have also acted to tighten the markets. The outage at Freeport LNG has removed the equivalent of approximately two BCF a day of LNG from the market. Industrial action at Shell's prelude beginning June 10th slowed production and resulted in a shutdown beginning around July 11th, which remains idled as of early August. And the restart of Norway's Hammerfest LNG, which had been offline since September of 2020, was delayed to early June. Several other projects in Angola, the U.S., and Indonesia also underwent routine planned maintenance, as expected in the shoulder months, tightening the market further. Despite the supply challenges in LNG, a recovery from below average production during the same period in 21 contributed to a 7% year-over-year increase in global LNG exports, which reached 100 million tons in the second quarter, consistent with the previous two quarters. The U.S. alone exported 19.6 million tons in the second quarter, up 12%, or 2.1 million tons year-on-year, due in large part to additional capacity online at SPL Train 6. While the U.S. was the largest LNG exporter in the first half of the year, total exported volume declined modestly in the second quarter, due primarily to planned maintenance and Freeport's outage. Finally, in the U.S. gas market, although Henry Hub prices have also recently touched new multi-year highs, domestic prices are still well below the relative spikes in both JKM and TTF. The July contract settled at $6.55 an M, down 26% relative to the June contract as supply increased and demand moderated in early June, loosening the U.S. gas balance. Since then, prices have moved up again on an unprecedented early summer heat. We're seeing a response to the price signal in the rig count, as gas-directed rigs in the U.S. are up approximately 50% year-over-year to 157 rigs, so we would expect gas production to increase from current levels in the near future. Please turn to slide 10 for more detail on gas and LNG supply and demand in Europe and Asia. As discussed, the global LNG market remained tight in the second quarter, despite winter coming to an end and a notable decline in Chinese imports. Consumers continued to endure high spot prices for natural gas, especially in Europe, given the reduction in Russian gas flows. During the quarter, LNG deliveries to Europe climbed 40% year-on-year, with volumes from the U.S. increasing by nearly 130% year-on-year, including flows from Chenier, which also increased by over 130%. Nevertheless, risks of further cuts to Russian flows continue to rise, maintaining upward pressure on prices. In mid-June, Nord Stream flows were reduced to approximately 40% of capacity, and following the end of the quarter, the scheduled maintenance reduced flows to zero from July 11th to 20th. Flows initially resumed at pre-maintenance levels, but have since fallen to 20% of capacity. Amid these risks and high prices, Germany raised its gas emergency plan to alert level, while the European Commission proposed measures to reduce gas use in Europe by 15% until next spring. In the meantime, Europe continues to fast-track plans to increase LNG import capacity by over 50% to approximately 280 million tons per annum and has already sanctioned 11 new regas terminals representing approximately 40 million tons per annum just in the first half of this year. In Asia, LNG demand declined about 5% in the second quarter, most of which was attributable to economic headwinds in China. The country's GDP growth rate decelerated to 0.4% in the second quarter from 4.8% in the first Shanghai, the largest financial hub in the country, endured strict COVID lockdowns, which was a contributing factor to a year-over-year decline in China's absolute GDP during Q2. Gas demand in the country fell 8% as a result as city gas and power sector consumption contracted. Elsewhere in Asia, overall demand growth was somewhat flat, although we observed improved demand in JKT and Thailand. Nuclear power generation in Japan was down year on year, which led to a 9% increase in LNG imports, while maintenance of coal-fired power plants in Korea sustained existing LNG import levels. Thailand continued to exhibit LNG demand strength as higher consumption requirements offset its dwindling domestic production. The relative weakness in Asia year-to-date has counterbalanced the heightened demand in Europe, but we expect this to be a transient phenomenon with near-term weather and longer-term organic growth confirming that long-term fundamentals in Asia remain strong with ample upside potential. This view is underscored by the demonstrated appetite for long-term LNG volumes exhibited by Asian customers this quarter, including our recently announced long-term contracts with POSCO, PetroChina, and PTT. Please turn to slide 11. Needless to say, the impacts of Europe's energy crisis have already been far-reaching, with significant consequences observed across multiple sectors of the economy, including food and commodities. This backdrop has exposed some vulnerabilities within gas and LNG markets around the world, not just in Europe, and has accelerated the impetus for gas consumers to secure reliable long-term LNG supply. In the first half of 2022, buyers around the world signed nearly 38 million tons per annum of firm long-term contracts globally, the highest level since at least 2016. Most of these firm contracts, or 28 MTPA, were signed with U.S. sellers, potentially underpinning a new round of LNG infrastructure investment in the U.S. In just the first seven months of 22, we have already had our most productive year for long-term contracting since 2011, continuing to successfully grow our portfolio of diverse creditworthy customers. The long-term deals we concluded completed the commercialization of Stage 3 And as Jack mentioned, LNG buyers have already begun to contract for our next phase of growth. Our commercial success further cements our position as the LNG provider of choice for buyers worldwide. Since just the start of the second quarter, we executed long-term transactions with FOB, DES, and IPM structures with credit-worthy counterparties from Asia, Europe, Canada, and a U.S. supermajor. This geographic and structural diversity is a prime illustration of the value of the Chenier brand that Jack referenced and what sets Chenier apart, the certainty on execution, the safe and reliable operations, and our unrivaled ability to structure long-term energy solutions tailored to fit the needs and preferences of a diverse global customer base. On the buyer side, you can see from the middle chart that a greater variety of buyer types are contracting for US LNG, Given the stability and flexibility, Gulf Coast FOB volumes can provide for their portfolios. While portfolio players still represent a significant portion of U.S. LNG buyers or prospective buyers, we observed that the end-user segment has also been growing, including those potentially servicing Europe. Finally, while Europe's target to displace Russian gas certainly creates a near-term increase in LNG demand, You can see from the chart on the right that credible commentators are forecasting this heightened demand to persist despite expectations for the region to reduce its overall gas demand over that same period. This uncertainty highlights Europe and the world's need for flexibility and reliability of supply to highly valued attributes of the long-term product we offer. Our conviction in the long-term global market fundamentals for our product remain as strong as ever. and our demonstrated ability to construct LNG solutions tailored to customers across the globe places Cheniere in an ideal position to continue to win business and grow our market-leading LNG platform for many years to come. And now I'll turn the call over to Zach to review our financial results and guidance.
spk07: Thanks, Anatole, and good morning, everyone. I'm pleased to be here today to review our second quarter 2022 financial results, our key financial accomplishments, and our increased 2022 guidance, all of which reflects the hard work and dedication of the Cheniere team, the reliability of our platform, and the volatile state of the global energy markets Anatole just described. Turning to slide 13. During the second quarter, we generated adjusted EBITDA of $2.5 billion, distributable cash flow of approximately $1.9 billion, and net income of over $700 million. Our second quarter results once again were driven by the sustained higher margin environment across global LNG markets, coupled with higher lifting margins due to higher Henry Hub prices. We recognized in income 574 TBTU of physical LNG during the second quarter, including 570 TBTU from our projects and 4 TBTU sourced from third parties. Approximately 85% of these LNG volumes recognized in income were sold under long-term SPA or IPM agreements. We are pleased to announce that we generated positive net income of $741 million in the second quarter. However, the net income line continues to be impacted by the unrealized non-cash derivative impact related to our long-term IPM agreements, as we have discussed on prior earnings calls. In fact, we recognize $1.3 billion of these unrealized non-cash derivative losses in the second quarter alone as Gulf Coast netback curves continue to rise in Q2. As a reminder, because GAAP requires mark-to-market accounting of these long-term gas supply agreements but does not permit the mark-to-market of the associated sale of LNG, resulting in a mismatch of accounting methodology for the purchase of natural gas and the corresponding sale of LNG, which drives this quarterly variability in net income from period to period. As Jack noted, during the quarter, we launched and closed on our widely syndicated financing for Corpus Christi Stage 3, raising approximately $4 billion of new capital, which was the final step needed for us to reach FID. As part of the financing, we amended and restated the CCH credit facility with 36 financial institutions, increasing total commitments by $3.7 billion to approximately $4 billion, extending the maturity by multiple years and reset the borrowing rate to SOFR plus 150. Approximately $300 million of outstanding borrowings were rolled over from the previous facility, and since closing in June, a little over $400 million was incrementally drawn as of the end of the quarter. In addition to the credit facility, we amended and restated the working capital facility at CCH, increasing commitments by $300 million to $1.5 billion, extending the maturity to 2027, and reset our borrowing rate to SOFR plus 125. The working capital facility remains undrawn. We are appreciative of a long-term partnership with our global bank group that has consistently supported us through the years, including on Stage 3, which further highlighted Chenier's ability to continue to develop and structure world-class infrastructure projects with brownfield economics underpinned by lump-sum turnkey EPC arrangements with Bechtel and a diverse mix of long-term credit-worthy take-or-pay commercial contracts. Thanks to our financial results so far this year and the expected proceeds from the early termination of our TUA with Chevron, we continue to make progress on our comprehensive long-term capital allocation plan on a significantly accelerated schedule. Not only has our prioritization on debt pay down accelerated the leveraging of our consolidated balance sheet, but also we are more than halfway through our three-year $1 billion share repurchase authorization in less than a year. During the quarter, we prepaid $1.1 billion of outstanding indebtedness, bringing our total debt repaid or redeemed to just over $3 billion under our capital allocation plan. so we are more than three-quarters of the way through our four-year deleveraging goal in about a year and a half. The expected proceeds from the Chevron prepayment will likely further accelerate the pace of our deleveraging by the end of the year. In the second quarter alone, we repurchased 4.1 million shares for approximately $540 million, including approximately 2.7 million shares from Icon Enterprises for approximately $350 million. which brought its shareholdings engineer below the threshold for board representation established in the nomination and standstill agreement that has been in place since 2015. We have also continued to declare and pay our quarterly dividend of $0.33, which we plan to grow over time now that we have completed or announced the first four quarterly payments. And finally, in terms of allocating capital to accretive growth projects, We reached FID on Corpus Christi Stage 3 and issued FACTEL full notice to proceed in June. Given this accelerated progress and our approximately $7 billion of forecasted DCF in 2022, our plans for a revised capital allocation plan have also accelerated, and we anticipate coming to the street with an updated plan for the future before the end of the year. While robustly leveraging and reaching investment grade in the next year or so will remain a priority you can likely expect a recalibration of allocations between debt paydown, shareholder returns, and future growth on a relative basis, particularly as we continue to develop and commercialize this future growth. Turn now to slide 14, where I will provide some more detail around a third consecutive significant increase to 2022 guidance. We are increasing the midpoint of our guidance ranges for full year 2022 consolidated adjusted EBITDA and distributable cash flow. each by over $1 billion, bringing expected consolidated adjusted EBITDA to $9.8 to $10.3 billion and distributable cash flow to $6.9 to $7.4 billion. With the recent distribution announcement for CQP, we are also tracking to the high end of the $4 to $4.25 guidance range. As Jack mentioned, about half of the $1.6 billion increase in EBITDA is attributable to the expected proceeds from the early termination of the TUA with Chevron, set to be paid to SBLNG prior to year end. The other half is due to curves moving higher over the balance of the year. In addition, our forecast has improved due to smaller contributing factors, such as some of the open capacity for 2022 that was previously reserved for long-term origination being released to CMI, higher lifting margin, lower shipping costs, and some third-party sourcing and portfolio optimization. With respect to the EBITDA sensitivity from here, We have sold much of our total expected production for this year and have approximately 40 TPTU unsold remaining. We currently forecast that a dollar change in market margin would impact EBITDA by approximately $20 million for the rest of 2022, as we continue to reserve some unsold volume for long-term origination in Q4. 2022 continues to prove the power of the Chenier platforms. and what can be achieved when operational excellence and seamless execution are combined during an elevated commodity backdrop. Thanks to our team's relentless focus on safety and reliability at both of our facilities, we continue to outperform expectations with respect to operational performance and financial results, which brings an even stronger balance sheet, increased shareholder returns, and further creative growth into focus. That concludes our prepared remarks. Thank you for your time and your interest in Cheniere. Operator, we're ready to open the line for questions.
spk09: Thank you. If you would like to ask a question, please signal by pressing star 1 on your telephone keypad. If you're using a speakerphone, please make sure your mute button is turned off to allow your signal to reach our equipment. Again, please press star 1 to ask a question And we'll pause for just a moment to allow everyone an opportunity to signal for questions.
spk02: We will take one question and one follow-up.
spk09: Our first caller will be Jeremy Tonette with J.P.
spk02: Morgan.
spk03: Hi, good morning. Good morning, Jeremy.
spk08: It seems like Schneer has been quite successful in signing up new contracts as of late, particularly with Asian buyers. And some of those contractual terms have showed that part of it is contingent on expansion beyond CCL Stage 3. And so I was just wondering what the pace of new contracts could be. Do you see more of these coming in the near term? And are they going to be contingent on a further expansion? And if so, when might we hear more about that?
spk05: Jeremy, thanks.
spk04: And I can give you a little bit of color right now if you'd like. So as you all know, strategically, you know, we have a track record, right, of capitalizing on all the infrastructure and the sites that we've built. So we have executed on that strategy and expanded our portfolio by over 20 million tons so far, over 60%. And that's Corpus 3, Sabine 6, and now Stage 3. So I still view both sites as being excellent for major brownfield LNG expansion. So at Corpus specifically, and since you asked about the contracts, Corpus is growing to just over 25 million tons with the addition of stage three. We have a clear line of sight to get Corpus over 30 million tons on par with Sabine Pass with the addition of a few more mid-skilled trains as an expansion of Stage 3 as well as some de-bottlenecking and tuning efforts. And so in terms of growth plans, we believe that that's the lowest hanging fruit and it's expected to be extremely cost effective and potentially seamless with Bechtel already on site. Additionally, both at Sabine and at Corpus, both of those sites are ripe and ready for much larger expansions. So we're currently working on early stage development of over 30 million tons between those two sites. So as you highlighted, the energy crisis abroad has brought reliability and energy security and really the flexibility of Chenier's LNG into sharp focus around the world. And that includes Washington. So the U.S. LNG is rightly seen as a logical long-term balance or a long-term solution to help balance the shortages in Europe. And I believe that the permitting reform that's currently being talked about in D.C. is a very positive development. It should enhance the regulatory tailwinds for well-developed, commercially sound brownfield projects like ours and what we're about to propose longer term in our growth forecast.
spk05: So I hope that helps.
spk08: Yes, that's very helpful. And just wanted to pivot to capital allocation if I could. And I know there's a bigger update coming towards the end of the year here. But it seems like at this point, Chenier is clear on a site to hitting targeted leverage and reach full investment grade in the not-too-distant future here. And so just wanted to know process-wise, when you're thinking about buybacks, Would you think of buybacks in terms of balance sheet capacity or stock price, or think of it more in a holistic manner, a certain return of capital to shareholders that would be a combination of dividends and buybacks as a certain percentage of free cash flow or such?
spk07: Hey, Jeremy, it's Zach, and thanks for the question. I mean, it was less than a year ago we came out with capital allocation. We thought we'd have $10 billion of available cash through 2024. maybe it's double at this point, just where the curves are and how much earlier train six came online. So yeah, we're going to owe everyone a capital allocation plan with much bigger numbers this year because it's just been so much more accelerated. So as we think about it, there's this pile of money and how do we break it out? And we'll definitely recalibrate to an extent the debt pay down to shareholder returns No need for the four to one ratio of debt pay down to buybacks going forward. So there's going to be quite a bit of money allocated to share buybacks over time. And as you can see, we did over a half a billion just in Q2. And you saw some of the dislocation there, and we were really opportunistic. So you can assume that that's going to happen. There'll be a regular cadence quarterly that we'll always be buying back stock, but we'll be extra aggressive whenever we see
spk03: things like what happened in June. Got it. That's very helpful. Thank you.
spk09: Thank you. And once again, we will be taking one question and one follow-up. We'll now move on to Mark Felicito with Barclays.
spk11: Hi. Good morning. You know, maybe just following up on the longer-term growth outlook with respect to expansions beyond Stage 3, I want to get your latest thoughts around what the next iteration of that could look like after factoring in the recent contracts you've signed. It seems like you could potentially move forward with a larger-scale train at this point or even a larger expansion with a couple more contracts. So just curious to the extent you could comment on how you're thinking about that versus modular expansions.
spk04: Mark, hi, it's Jack. I mean, I the way I'm thinking about it is I want to do what whatever expansion I can do quickly and in a financially disciplined way and and right now for us it looks like adding to the MIT mid-scale trains we can do very quickly with and in economically in all of our financial metrics and rather than get caught up in a long-term regulatory review of you know a large-scale expansion so my first goal is to just grab all the low-hanging fruit that we possibly can right now today and then and then make sure we're filing and being respectful in those filings of what what the longer term expansion plans are for both for both sites and that's near term also but But I just think we have an opportunity to add to our growth plans in a very effective way, and we need to take advantage of it.
spk11: Thanks, Jack. That's very helpful. And then with respect to Europe, curious how your discussions with customers there have gone and whether with the most recent curtailment of volumes on Nord Stream and re-escalation in gas prices, has that at all changed some of the discussions over the past month or so?
spk06: Yeah, thanks, Mark. This is Anatole chiming in. The discussions have been very robust for the better part of a year, really sort of in the market broadly and in Europe, obviously, the tragic events that played out at the beginning of the year and continue to play out does add a sense of urgency. You've seen us do transactions with Equinor, Engie, those are transactions that we think probably would have gotten done anyway, but perhaps were done sooner. And then, of course, on the Europe front, there's a tremendous push to add infrastructure to de-bottleneck, you know, regas infrastructure running at well over 80%, and now will grow most likely by about 50%. And even given our business model and the transactions we enter into, again, with the Equinors, the Chevrons of the world, etc., can all serve European demand. So kind of like a lot of the things you hear from us, it's all of the above, and we continue to be very well engaged. And, you know, to Jeremy's question, we do see kind of continued great opportunity to support Asia's growth, not just to help rebalance Europe.
spk03: Got it. Thanks for your time.
spk02: Thank you.
spk09: And next we'll move on to Jinan. Salisbury with Bernstein.
spk01: Hi, good morning. I won't ask any detailed questions about the EPA thing. I know it's kind of a sensitive situation, but I am just wondering if we should expect a resolution on it before the 180-day mark, which is coming up in a few weeks?
spk04: Maybe, Jeanne-Anne. Because, you know, and I just want to say, look, I've worked in and around the EPA for well over my 40-year career, and I'm very familiar with the EPA, their processes, and what their expectations are. As I talked about on my speaking remarks, we've been testing the turbines with Baker used at our side. Baker is our turbine OEM. to try to make sure that we provide the data that they want by the September 5th date. I have to say, being an old performance engineer from my days at PG&E back in the 1980s, the testing procedure in itself is very difficult. It relies heavily on correlations and calculations and estimates and guesstimates of the formation of formaldehyde. So we're working closely with the EPA as we're talking, just working on what an accessible test program looks like and what the shortcomings are from that program in and of itself. And as you know from your comments, 91 parts per billion is an awful small number and very difficult to measure, at least with today's technology. But we will continue to work closely with the EPA And I think ultimately the situation is manageable. I think the solutions will be immaterial to Chenier, both from an operational perspective and a financial perspective.
spk01: Great. Thank you. And then as a follow-up, what do you view as the maximum amount of U.S. LNG liquefaction that the U.S. could realistically build concurrently over the next four or five years? And what sets that limitation? It's obviously a very big talking point in the market right now. And you guys know more than pretty much anyone. So interested in your opinion there.
spk05: In the next four or five years, Anatol, what's the maximum amount the U.S. can build?
spk06: Yeah. So, Gene, I will admit that the answer to that question has changed modestly over the last six months. And it is probably higher today than we would have, you know, put it into our base case. But the constraints have changed, and the constraints are very different today. As we said, the way we prosecute these projects with lump sum, turnkey, commercial support, gas supply solutions, all of those boxes checked on a disciplined and attractive risk-adjusted basis, those boxes are getting more difficult to check. The commercialization issue which was a key gating factor two or three years ago, obviously year-to-date less so with well over 30 million tons of SPAs signed by U.S. projects and other 20-plus million tons of HOAs. That is not the gating factor, but running the gauntlet on all these other pieces and having the EPC economics that support that commercialization, Zach's prowess in financing these things is – is not that widely distributed, and the gas supply solutions that our guys come up with are becoming more and more difficult. So, all those issues are going to be the limiting factor.
spk03: Great. Thank you.
spk02: Thank you. Next, we'll move on to Brian Reynolds with UBS.
spk15: Hi. Good morning, everyone. Looking at looking at 22 guidance seems like 10 billion is roughly the right number to end the year for EBITDA. But when looking ahead at 2023, it seems like the CMI margin opportunity has expanded just given the role for it in hedging and strengthen prices relative to 22 EBITDA. So was kind of just wondering if you could talk high level about some of the moving pieces when considering What's changing in terms of stock contracts and CMI capacity as we look ahead to 2023 versus 2022? Thanks.
spk07: Sure. This is Zach. And you know full well we don't really give guidance on 2023 until the November call. So that's coming in a couple months. But what I can say is that we're comfortably over 90% contracted on our nine trains plus stage three at this point through the mid-2030s. And for the next decade, we're on average 95% contracted across everything. However, considering a few of the remaining contracts aren't going to stand up or start until 2023 or even early 2024, there is actually a reasonable amount of open capacity next year, especially in the first half before most of these contracts that still haven't started yet related to the first nine trains begin. But that's not to say we're not still comfortably over 90% even next year. But if you look at the curves and on average for the rest of this year, next year, high 20s, if not better, we're comfortably confident that we can beat the five and a half billion of run rate EBITDA on nine trains again next year. So it could be a really strong year before 2024 or so where we're almost fully contracted on the nine trains. until stage three ramps up in 25, 26, and then we have a little more open capacity again.
spk15: Great. I appreciate all that incremental color. Maybe as just a follow-up on the CCL stage three, I know you've gotten a few questions on this already, but just kind of curious if you can talk about brownfield expansions, like with mid-scale at existing CCL stage three in Sabine, that would, you know, Limit the, you know, regulatory approval versus, like, you know, permitting a whole new site and going back to, which is, you know, seems like the long term plan at this point. But is there anything in the interim on the mid scale perspective at CCL stage 3 or Sabine that could potentially be brought online earlier? Just given that you already have almost 3 contracts signed. Thanks.
spk04: Yeah, no, we are a FERC regulated site. So it doesn't matter what technology and in fact, it doesn't matter what we do. we always go back to FERC and then and PHMSA and now the EPA so I I didn't want to mislead you on that aspect of it there they the degree of difficulty in in my opinion is different from doing a modular expansion to a whole new large-scale large train construction program as far as getting through FERC and the engineering required. So since we've already engineered and got fully permitted seven trains, mid-scale trains, it should be significantly easier to just add to those seven trains and punch them out.
spk05: But it still requires FERC approval.
spk03: Great, appreciate the call. Have a great rest of your morning.
spk02: Thank you.
spk09: Next, we'll move on to Matt Taylor with Tudor Pickering Holt and Company.
spk14: Yeah, thanks for taking my questions here. I wanted to go back to Europe and it's all in terms of behavior there as we're seeing a lot of those Western European countries seem to be really focused on getting through the winter here. So, I guess the question here is, have you seen structural change in that behavior, meaning should we expect to see interest, like you said, it's already picked up, but interest picking up even once we get through next year? Or are you still seeing LNG imports being viewed as a short-term measure to backfill Russian gas before turning back to, say, mothballed base load generation so that they can support renewable development?
spk06: Thanks, Matt. The first step in solving this crisis that Europe has pursued very aggressively is the infrastructure solutions. The issue of lining up contractual long-term molecules for those infrastructure solutions is something that has been somewhat successful, let's say, and something that will we think be largely intermediated. So the support that the market will get from the IOCs intermediating these issues is clearly what you're seeing in the Chevron, Exxon, even Equinor transactions that have been executed lately, as well as some European customers. Again, the NGs and ENPW, for example, that was done with another project falls into that bucket. you really can't get away from the fact that demand growth and real sort of underlying increase for LNG imports is going to be driven by Asia into the 40s and 50s. And the fact that we now have deals that go into the late 40s and into the early 50s from that theater really support that. So that's the balancing act. But of course, the flexibility and reliability of our products will go to to the market of most need as it has for over 70% of our volume to date.
spk14: Great. Thanks for that. And maybe as a follow-up to that, then, we're starting to see longer-term contracting on those regassed terminals. So is that something that acquiring or building those types of assets, would that fit your risk-reward preferences? And do you guys get involved on the debaldnecking of infrastructure in Europe? I mean, Sabine was previously an import facility.
spk06: I guess the short answer to that is we'll have at least 60, if not 90, and maybe even more million tons of additional European import capacity really without our involvement. So we're happy to look at things. We obviously are in the market, but to date that hasn't required our participation. And frankly, we don't expect it to go forward.
spk03: It hasn't slowed us down at all on our growth plans.
spk02: Great. Thanks for taking my question. Thank you.
spk09: And next we'll move on to Michael LaPite with Goldman Sachs.
spk10: Nice try. Hey, guys. Thanks for taking my question. I actually have a couple. One, Jack, just curious. Actually, the first one's for Jack. The second one's probably for a combo of Jack and Anatole. The first one, just on the NESHAP issue, is there anything that your team is saying to you that would keep you and the EPA, both state and federal, from entering consent decrees that give you a lot of time to come into compliance if coming into compliance is required?
spk04: Yeah, I mean, that would be the logical next step. If we could not get a subcategory and get a stay on our turbines, which which is what we believe is would be the correct thing for the EPA to do since this rule was in place in really 03 04 and our facility was approved in 2011 that that we think it makes sense for them to put it in a subcategory but if not we would we would go into negotiations on some type of consent degree most logically with the state agency, which in our case would be Louisiana LDEQ. And we would go from there just like we have many times before. And like I said, Michael, I have in my career many, many times. Got it.
spk10: Okay. And then a long-term question. And this is just when you're talking to counterparties and especially the utilities in Asia, what are they saying to you these days just given what's happened to global gas prices, about the future of their coal generation fleets?
spk04: Well, I'll give you my perspective first, and then Anatole can chime in. Like Anatole says, we track all the natural gas infrastructure being built around the world. And I think the last thing I saw from Anatole's team was around $1.3 trillion of nat gas infrastructure that's currently being built. And most of that is in Asia. I think a very small amount of that is in Europe with the FSRUs that they're currently trying to build and the interconnections into their gas pipelines. But most of that trillion dollars is in Asia. Our conversations have gone very smoothly because of our reliability. And, you know, it's not an accident that I touched upon it in the presentation. It has been a competitive advantage. for Anatole and his team to go sit across the table and say, look, we haven't missed a foundation customer cargo. And if you're building this power plant, don't you want to have a reliable source of natural gas for that combined cycle power plant? And those conversations have went very well, which is why Anatole highlighted the fact that PetroChina is already into the 2050s with us on their contracted amounts. So they really do see the value proposition of a long-term Henry Hub-based contract.
spk06: And just to build on that, unfortunately, the way Europe has set up its market, the pain of these very high prices is very broadly felt. The way that Asia, most of Asia, has set up its market, those prices are largely irrelevant. Our friends at CPC said, are largely immune from these prices and pay a long-term contractual price that is much less volatile and much lower. And that's really what Asia is relying on. And as we look across and think about, you know, as you do, about demand destruction and the implications of these high prices, A, we're not seeing anything, right? The commitments to not build any more coal plants, retire coal plants, continue to import more LNG, continue to develop more gas-fired generation, really haven't changed over the last couple of years. And one of the large reasons for that, as Jack said, is we supply a fundamentally much less volatile, very reliable, and these days much lower priced product. And the coal alternative is even economically not attractive, much less environmentally. So that's one of the many reasons why we're still so sanguine on Asian gas and LNG demand growth for decades to come.
spk10: Got it. And if you don't mind, one last one, and this is probably for Zach. Zach, just curious, when you think about any open capacity, whether it's in first half of 2023 or first half, winter of 23, 24, how liquid or how deep is the market? Like if you wanted to go ahead and start locking in, call it winter of 23, 24 for any open or uncontracted cargos, can you actually go ahead and do that pretty easily right now? Or do you have to wait till you get closer to prompt months, prompt delivery for doing so?
spk07: I mean, the team is selling what it can for the rest of this year into the winter and in the first half of next year physically. And that's even trying at times with all the volatility that we're seeing. But to put in perspective financially to hedge out over a year, that's not really realistic to be done right now. I mean, 18 months ago, early last year, you might have to reserve I don't know, $15, $20, $25 million to lock in a $3 margin on a cargo for the prompt month, that's now $300 million with the volatility doubling since then. And if you even go up six months, you're almost talking about a billion dollars. So financially hedging out all that far is not really realistic or tenable. So we've been most successful on locking in on a Henry Hub Plus basis, or just on a fixed price basis. And what we're doing is really reducing any liquidity risk and taking on likely more credit risk. But that's why even on the short-term book these days, it's just as essential working with IG counterparties that are reliable or those that can post enhanced credit support up front.
spk03: Got it. Thank you, guys. Much appreciated. Thank you, Michael.
spk02: Thank you.
spk09: We will now be taking our last question today from Michael Bloom with Wells Fargo.
spk13: Thank you. Good morning, everyone. So you're clearly going to be adding a lot of capacity in the future here. I'm curious for your latest views on construction costs. I know in the past I think you've talked about $700 per ton range, but does that still make sense? And I guess on a related note, Can you talk about the cadence of Stage 3 CAPEX over the next few years?
spk04: Yeah, so I'll take part of that question, and then I'll turn it over to Zach. We have an extremely strong relationship with Bechtel. They built our first nine trains. We had early meetings with Bechtel. We locked in on some of our major equipment with our major equipment suppliers. with Bechtel early to help manage the inflation. And then Bechtel did a full wrap on stage three. We saw some inflation, but it was manageable and a relatively small number on stage three. A lot of that is the design. Since it's smaller trains, it uses a lot less nine nickel steel than some of the larger trains, you know, the five million ton trains. Our stage three trains are one and a half million a train. And in that case, they use more aluminum, less by nickel, and aluminum prices haven't escalated as much. And we were able to lock in those prices and still get within that $700 a ton range. With that, I'll turn over to Zach.
spk07: Right. And I think just Locking in the contract and doing that limit is noticed for seed work even in early March. Huge advantage to us that probably sets stage three apart from most other projects that are trying to get done this year. And as Jack mentioned, that six to seven hundred a ton on an unlevered basis, that's correct. That's including contingency. The six times capex to run rate EBITDA of, let's say, one one to one two billion. That's good, too. And that's where we stand today. And if you think about our financing, we raised 50% leverage on it. So it goes a little over $7 billion when you add the interest costs and the financing fees. That's SOFR plus 150, so less than 4% funding. We're going to delay draw that over time with equity. So it's about $800 million a year for debt and equity on average through construction.
spk13: Got it. Very, very helpful. And then just one other really quick one. O&M expense at CQP was up, you know, I think like 12% sequentially this quarter. I'm assuming that's just train six being fully in service, but I want to confirm that and also just ask if that's kind of the new run rate.
spk07: Thanks. Yeah, I think you got it. That train six for a full quarter, there was a little extra maintenance. So it can go up and down quarter to quarter, but that's about right.
spk03: And that's why you saw the O&M be up a bit this quarter. Great. Thank you. Well, thank you, everybody. Thank you. We appreciate your support and stay tuned.
spk02: Thank you so much, and that does conclude today's teleconference.
spk09: We do appreciate your participation. At this time, you may now disconnect.
Disclaimer

This conference call transcript was computer generated and almost certianly contains errors. This transcript is provided for information purposes only.EarningsCall, LLC makes no representation about the accuracy of the aforementioned transcript, and you are cautioned not to place undue reliance on the information provided by the transcript.

-

-