Eldorado Gold Corporation

Q3 2023 Earnings Conference Call

10/27/2023

spk01: Thank you for standing by. This is the conference operator. Welcome to the Eldorado Gold Third Quarter 2023 Financial and Operational Results conference call. As a reminder, all participants are in listen-only mode and the conference is being recorded. After the presentation, there'll be an opportunity to ask questions. To join the question queue, you may press star then 1 on your telephone keypad. Should you need assistance during the conference call, you may signal an operator by pressing star, then zero. I would now like to turn the conference over to Lynette Gould, Vice President, Investor Relations. Please go ahead, Ms. Gould.
spk00: Thank you, Operator, and good morning, everyone. I'd like to welcome you to our third quarter 2023 results conference call. Before we begin, I would like to remind you that we will be making forward-looking statements and referring to non-IFRS measures during the call. Please refer to the cautionary statements included in the presentation and the disclosure on non-IFRS measures in our management's discussion and analysis, as well as the risk factors set out in our annual information form. Joining me on the call today, we have George Burns, President and Chief Executive Officer, Philly Yee, Executive Vice President and Chief Financial Officer, Joe Dick, Executive Vice President and Chief Operating Officer, and Simon Hilly, Senior Vice President, Technical Services and Operations. Our release yesterday details our third quarter 2023 financial and operating results. This should be read in conjunction with our third quarter financial statements and management's discussion and analysis, both of which are available on our website. They have also both been filed on CDAR Plus and EDGAR. All dollar figures discussed today are U.S. dollars, unless otherwise stated. We will be speaking to the slides that accompany this webcast, and you can download a copy of these slides from our website. After the prepared remarks, we will open the call for Q&A. At this time, we will invite analysts to queue for questions. I will now turn the call over to George.
spk03: Thanks, Lynette, and good morning, everyone. Here is the outline for today's call. I'll provide a brief overview of Q3 results and highlights before passing it to Phil to go through the financials, and then Joe and Simon to review our operational performance. Then we will open the call to questions from our analysts. Turning to slide four, starting with production, our performance continued to improve over the quarter with safe production of 121,030 ounces of gold at Olympias, The mine delivered its best quarter of the year, and the trend is positive, with significant opportunity to make further improvements beyond where we are today. This is a site that is really seeing innovation and technology making a difference in productivity. In the past few months, we have energized the substation, upgraded ventilation, and added bulk emulsion blasting underground. All of this is converging to create a positive trajectory for the site going forward. In the third quarter, at Quesada, with the north heap leach pad operational, we are seeing increased tons with three cells under leach, which should positively impact gold production in the fourth quarter. The tons placed are record amounts compared to the past six and a half years, and a 19% increase relative to both the first and the second quarters of 2023. At Lamarck, Q3 production increased over both Q1 and Q2, However, it was impacted by slower than expected development in the underground due to suspended shifts in the second quarter owing to the wildfires in the region. As a result, we saw a ripple effect with reduced mining phases available for ore production during the third quarter, which impacted our production relative to our expectations. This site has consistently met its performance expectations, and I anticipate that it will maintain the trend throughout the fourth quarter as they access higher grade stoves. As we head into the fourth quarter, we are updating our guidance range to narrow the ranges reflecting our full year expectations given the operational and financial performance to date. And we expect tightening gold production to between 475 and 495,000 ounces versus previous guidance of 475 to 515,000 ounces. Lowered cash operating costs to be between $730 to $780 per ounce sold versus previous guidance of $760 to $860. Tightening all and sustaining costs to between $1,190 and $1,240 per ounce sold versus previous guidance of $1,190 to $1,290. Sustaining capital guidance remains unchanged at $114 to $139 million. Growth capital for the year has been reduced to $280 to $305 million from $394 to $437 million, primarily driven by lower than expected growth capital spend at scurries. Scurries capital is expected to be between $160 to $170 million versus previous guidance of $240 to $260 million. The reduction in scurries is driven by a change in timing to award several contracts in order to optimize project execution, shifting of certain pre-production expenditures from 2023 to 2024 without impact to work progress or completion schedule, transitioning engineering work into Greece, an updated execution approach to major IRF works while maintaining construction schedule flexibility. In addition, the closing of the project financing in April, which was slightly delayed from our initial expectation, meant a slower ramp up than what was expected in awarding the contracts. This lower than expected spend in growth capital at scurries in 2023 is not impacting overall project plan, including cost and schedule, and we remain comfortable we are on track for first gold in mid 2025. We are also pleased to issue our 2022 climate change and greenhouse gas emissions report in August, which provides a measurable progress towards our GHG mitigation target and enhancing climate resilience. This report builds on our first climate change report that was published in 2021 and focuses on our progress implementing the climate change strategy. The report included our GHG emissions target achievement pathway in which we seek to mitigate our Scope 1 and Scope 2 emissions from operating mines by 30% on a 2020 baseline by 2030. Our GHG emissions target achievement pathway comprises four levers, operational efficiencies and continuous improvement, technologies, processes, and energy generation, grid decarbonization, and mine shutdown and operational changes. These opportunities will help mitigate our emissions, and we are already discovering these levers often provide multiple benefits that extend even further. We are committed to continuing to assess opportunities to improve our emissions-related impacts and enhance the resilience of our business in response to climate change. In addition, we are committed to further investigating how we will incorporate Scurry's operational emissions to a climate target. I invite you to read the full report available on our website. The highlight as we entered the fourth quarter has been a well-attended investor and analyst mind tour that we hosted at all four of our European assets, Scurries, Olympias, Quesada, and FM Chukaru. Some of you on the call today were able to get a firsthand feel for how things are going on the ground, which provided a sense of confidence in terms of the abilities of each side team. Each of you that participated was able to see firsthand Our productivity improvements are making a meaningful impact across the sites, and in addition, the opportunities that still lie ahead for us. Additionally, you're able to see directly our sustainable mining practices that we feel are best in class. I think everyone that attended the tour was impressed with our site teams and the significant achievements that we have made across the business. We plan in the future to host more investor and analyst tours as we continue to deliver our growth and value creation that is unique amongst our peers. I'll stop there and turn the call over to Phil for a review of our financial results.
spk02: Thank you, George. Good morning, everyone. Slide five provides a summary of our third quarter results. Eldorado reported a net loss attributable to shareholders from continuing operations of 6.6 million or 3 cents loss per share in the third quarter, directly impacted by the previously disclosed 5% retroactive corporate tax rate increase in Turkey A, effective July 2023. After adjusting for one-time non-recurring items, adjusted net earnings were 35 million or 17 cents per share for the quarter. These one-time non-recurring items included a one-time 22.6 million non-cash deferred tax expense, and a one-time out-of-period current tax expense of 8.2 million, both the result of the retroactive corporate tax rate increase mentioned earlier. In addition, a non-cash loss of 15.2 million on foreign exchange translation of deferred tax balances related to the weakening of the lira and the euro, and partially offset by a non-cash unrealized gain of $6 million on the revaluation of derivative instruments, primarily the gold collars. Free cash flow in the quarter was negative $19.3 million. Excluding capital investment in the Scurias project, free cash flow generation in the quarter was positive $30 million. Cash flow generated by operating activities before changes in working capital totaled $97.5 million compared to the second quarter of 2023 of $82.4 million. Third quarter cash operating costs averaged $698 per ounce sold and all in sustaining costs averaged $177 per ounce sold. Our costs decreased during the quarter as we continue to see lower than expected fuel and electricity prices. This was partially offset by higher royalty expenses as a result of the higher realized gold price during the quarter. All-in sustaining costs per ounce sold in the third quarter were in line with expectations. With stronger gold production expected in the fourth quarter, we expect to see decreasing unit costs, and as George mentioned, we have updated our cost guidance ranges. The Apple expenditures were $91.1 million in the third quarter, which included investment in growth projects at Kissadag and at Scurrius, where we continue to advance procurement and the project. Income tax expense of 52 million increased in the quarter compared to Q3 2022, primarily a result of the retroactive 5% Turkish tax rate increase as previously noted. Current tax expense totaled 21 million in Q3 2023, an increase from Q3 2022 current tax expense of $16 million. Deferred tax expense increased to $31 million in Q3 2023, also an increase from Q3 2022 deferred tax expense of $12 million. These increases in Q3 2023 current and deferred tax expense over the comparative prior year period were due to the Turkey corporate tax rate increase previously mentioned. Turning to slide six, at quarter end we had unrestricted cash and cash equivalents of $476.6 million. With production expected to continue to improve over the fourth quarter, we expect to see our cash from operations improving further. With the closing of the Scurrius project financing in April, availability under El Dorado's $250 million revolving credit facility was reduced as El Dorado's funding commitment for the Scurrious project is fully backstopped by a letter of credit under that revolving credit facility. The availability under the facility as of September 30th was $116 million. We continue to focus on maintaining a solid financial position, which provides flexibility to unlock value across our global business. With that, I will now turn it over to Joe to go through the operational highlights.
spk04: Thanks, Phil, and good morning. Starting on slide seven, at SCORIUS, construction activity in Q3 continued to ramp up with overall project progress at 34%, and when incorporating all prior work, SCORIUS progress stands at 65% complete. Mobilization continued for major earthworks for construction haul roads needed to undertake all other major earthworks and is progressing well with work on several fronts underway. During the quarter, the contractors for the earthworks and pilings for the primary crusher were mobilized and commenced work. General works continued to focus on site preparation, relocation of temporary facilities, recommissioning of the non-contact water reinjection well system, and the haulage of aggregates for construction purposes. The first phase of underground development continues to advance the west decline and lateral development for the test dopes to validate the underground assumptions prior to first production from the underground. Test dope work access will commence at the end of 2024 with expected completion by mid 2025. With year-to-date spending at SCORIUS at $101.3 million, we expect to ramp up our commitments during the fourth quarter and are comfortable achieving our updated guidance range of 160 to 170 million. The spending is focused on completing detailed engineering and procurement. As of September 30th, detailed engineering is 56% complete and procurement is 73% complete. We continue to focus on completing key contracts with evaluations ongoing. with a view to generating cost and productivity synergies during the process. We expect to complete this process and award the remaining key contracts by the end of 2023, which include the filter plant, including the earthworks, pilings, and foundation to support the filters. Open pit pre-stripping and construction of the ore stockpile, water management ponds, and the integrative extractive waste management facility dam embankment. structural concrete for the primary crusher and associated process facilities, and mechanical, piping, electrical, and instrumentation for the process plant. The project, both cost and schedule, remain on track for commissioning and first production in mid-2025 with commercial production expected at the end of 2025. Turning to slide 8, in the third quarter, we recorded zero lost time injuries. The lost time injury frequency rate for the first nine months of the year was 0.74, a 49% decrease from the same period in 2022. We continue to take proactive steps to improve workplace safety and to ensure a safe working environment for our employees and our contractors. On our operating results, we produced 121,030 ounces of gold in the third quarter with a cash operating cost of $698 per ounce sold, a solid quarter which positions us to remain on track to meet our guidance. I'll pass it over to Simon to review the third quarter performance and operations in Torquay and Canada.
spk05: Thanks, Joe. Starting in Torquay on slide nine, At Kishida, third quarter production was 37,219 ounces and cash operating costs of $622 per ounce sold, which represents a 17% reduction in cash costs and similar production compared to Q3 2022. Production during the third quarter was driven by the successful commissioning of the agglomeration drum that was added to the crushing circuit in the second quarter. and tons placed on the heat bleach pad have continued to increase. The larger surface area of the newly commissioned north heat bleach pad has enabled the full capacity of the 54-inch stacking equipment to increase tons placed and increase the irrigation flow rates. Production is expected to increase over the course of the fourth quarter as we realize full effectiveness from the upgraded materials handling equipment. In addition, We expect to continue to draw down inventory built up in Q2 as a result of the substantial rainfall that resulted in diluted leach solution. On slide 10 at FM2Crew, third quarter gold production was 21,142 ounces at cash operating costs of $817 per ounce sold. Gold production throughput and average gold grade at FM2Crew were in line with plan for the quarter. Development towards the co-carpenter area is on track and is expected to continue to extend mine life. For 2023 at FM2 Crew, we expect to see a modest increase in Q4 production over the third quarter. Additionally, during the quarter, the FM2 Crew mine was successfully certified ISO 5001 energy management standard. And now moving to LAMAC on slide 11, third quarter gold production was 43,821 ounces at cash operating costs of $624 per ounce sold. Production was impacted by slower than expected development in the underground as a result of suspended shifts in the second quarter due to the wildfires in the region, which led to reduced mining faces for all production in the third quarter. The fourth quarter is expected to be stronger with development into high-grade stoves and continued stable processing rates. Additionally, we remain on track to complete our 2023 infill drilling program targeting the upper two-thirds of the Allmac deposit. Our plan is to take a bulk sample and announce Allmac inaugural reserve during the second half of 2024. to call back to Joe to review the third quarter results at Olympias.
spk04: Thanks, Simon. Moving to Olympias on slide 12, third quarter gold production was 18,848 ounces and cash operating costs were $885 per ounce sold. Mined and processed tons were up from prior quarter and at record levels for Olympias. Cash costs improved primarily due to productivity efficiencies resulting from recent transformation initiatives, as well as slightly lower unit costs for certain consumables, including electricity. During Q2 and early Q3, we completed a number of milestones that have resulted in our ability to increase underground development and production from the flat zone. These milestones include transitioning to mechanical loading of drilled rounds with a bulk emulsion agent, mechanical completion of a major upgrade to the ventilation system, and completion and energization of the new 150 kV substation, which enabled the ventilation system startup. With access into the flat zone, we expect to improve not only our gold production, but also our byproduct metal production, which we expect to result in higher byproduct credits and, in turn, lower operating costs going forward. Gold production is expected to be steady over the fourth quarter as the productivity initiatives continue to safely deliver increased tonnage and increased byproduct metals, reducing our overall cash costs. I'll stop there and turn it back to George for closing remarks.
spk03: Thanks, Gene. Our operating business delivered a strong quarter, generating improved free cash flow excluding capital expenditures on the Scurries project. We also delivered some fantastic improvements in our business. Both Olympias and Quesada reached major turning point with the completion of key infrastructure investments. Both sides are now beginning to reap the benefits from these investments. At Lamarck, we're well positioned for the Armach deposit in that we've got the exploration, drift, and infill drilling program moving to completion this year that sets us up for the bulk sample collection next year, which then sets us up to have our first reserve on our mock late next year. This site has continuously delivered or exceeded expectations, and they're set up to deliver a strong fourth quarter. At FM Chukaru, we're also advancing our exploration and infill drilling programs to support mine life extension. And at Scurries, we're just six months past finalization of the project financing, and the project is advancing nicely towards the start of commissioning in mid-2025 to deliver commercial production on budget and on schedule by the end of 2025. We are on track to deliver our growth strategy to deliver industry leading returns over the next couple of years. It's an exciting time to be at Eldorado. Thank you for your time. I will now turn it over to the operator for questions from our analysts.
spk01: Thank you. We will now begin the question and answer session. To join the question queue, you may press star then one on your telephone keypad. You will hear a tone acknowledging your request. If you are using a speakerphone, please pick up your handset before pressing any keys. To withdraw your question, please press star, then two. We'll pause for a moment as callers join the queue. Our first question comes from Cosmos Chu of CIBC. Please go ahead.
spk07: Great. Thanks, George, Bill, Joe, Simon, and Matt. Maybe my first question is on SCARIUS. You know, some are wondering how a change in CapEx, at least for 2023, doesn't impact the delivery schedule. I guess my question is, is this just really a shift in timing? You know, on the top end, you're lowering 2023 CapEx Ascurius by $90 million. I'm sure you're going through the budgeting process right now, George and Phil. Is that going to show up in 2024?
spk03: Yeah, Cosmos, thanks for the question. Yeah, I mean, for scurries, I'd say a couple of key things I'd point out. Number one, you have to remember that prior to starting the work this year, we had roughly said the project was half built. So, I mean, the group that went and visited the site could see we have a tremendous amount of infrastructure already on the project site. And then the other high-level thing I'd say is, Remember, we just completed project financing in the second quarter. We're on a steep ramp-up curve. We have a lot of people on site doing construction now, but that's going to accelerate over the next number of months as we get a few of these major contracts. So, yeah, the capital spins down a bit. Some of it's actually optimization where we're pushing some costs off without any impact to schedule. And some of it is just simply a little bit light on a few of these contracts that none of which is affecting the critical path for the project. So overall, we remain confident that we'll get this thing into commissioning mid-2025, commercial production by the end of the year. Obviously, with a bit lower spend this year, it's going to be a heavier lift next year. But again, when we look at critical path, we're not concerned about the schedule or overall capital cost. And Joe, I don't know if you have a few comments you might want to add to that. No.
spk04: Thanks, George. Hi, Cosmos. Yeah, George, I would say that, you know, some of that confidence comes from right from the beginning, flexibility that we built into the construction schedule. So, you know, we remain continuing to project on a single ship, six-day-a-week construction schedule. So certainly, you know, we have flexibility in how to deploy resources over the remaining project time and and i also say that um you know kind of concurrent with george's comments that you know some of the optimization that we have done in the well in this early award stage i think is um you know pretty beneficial to overall project costs and so you know we're comfortable with that that trade-off in time versus money in the in the near term here and and as George said, are still confident or remain confident on being able to deliver Scourge in 2025.
spk07: Perfect. And then, you know, George and Joe, as you mentioned in your press release, you mentioned a few items that contributed to the decrease in CapEx for the year. Part of it is transitioning engineering work to Greece. Would that result in a permanent cost savings, or could you give us a bit more detail on what that entails?
spk04: Go ahead, Joe. Cosmos, this is Joe. Yeah, that's kind of what was being reflected there. As we move the engineering, the offshore engineering from Vancouver to Greece, we see a better cost structure for engineering, but also there was a bit of time in making that transition. improved cost and for a period as that was transitioning and ramping up, um, a bit slower delivery, but everything's on track now and working, working well. So pretty pleased with that.
spk07: Great. And then, uh, you know, going back to Q2, uh, you had mentioned at that time that, uh, you know, several contracts were going to get awarded in Q3. Likely it sounds like it didn't happen, but you know, that's okay. But you also mentioned that, uh, the, The FS estimate will be updated to the project control budget with some kind of update expected by the end of Q3. We're past Q3 now, but again, should we be expecting some kind of update? Should we be looking out for some kind of update? If that's the case, maybe when?
spk04: Where we sit today, this is Joe. Go ahead, George. Go ahead, Joe. Cosmos, where we sit today is that we did an update based on completion of award of contracts. And when that work is completed, we'll update should we see any type of material information that needs to be passed along. So that's where we sit today is we're not updating based on the commitment schedule. And as that completes through the end of the year, will update based on any material changes that we may see. And if not, then I think we'll hold where we're at.
spk03: Let me just add a few comments to that. So I just want to make it clear when we said that in Q2, we're not signaling that we expect anything to come out of that necessarily. It's just it's an important milestone in the work. It will give us some updated information. So in the feasibility study, We obviously made assumptions on productivity, numbers of employees required to do each piece of work. And so once we get a contract negotiated, we've got improved information. And so we'll digest that. We're not expecting anything to change, but if it does, that will be a time to bring the market up to speed. And I would remind you again that it was roughly half built when we started. We have the confidence in all that work that was done. It was built into the feasibility studies. And we've done quite a bit of work beginning last year, including putting up the building around the mill facility, the cranes, and the work that you saw on site that we've completed this year. So we've got a lot of confidence in our equipment. We have a lot of confidence in the work we've done. We don't have any critical equipment that we have any concern about. I mean, the filters was really the last major piece of equipment that we needed to acquire. And the filters essentially are manufactured. So we're already working on plans to put those filters together on site. That risk is essentially eliminated now. So we remain confident. And again, those things we pointed to in Q2 are going to be additional data, additional information, a little later than planned just due to these contracts slipping a little bit, but again, not affecting schedule. And maybe one last comment, you know, On the civil works, we had originally contemplated that as four individual contracts. And we took time to digest all the bids that came in, put a lot of work into optimizing that piece of work, and in fact have landed with one contractor. And we're seeing synergies out of that work. It's a contractor we've got familiarity with as they've done work on the Coconolophus Dam the last couple of years. We're taking our time to make sure we got the right partner and the optimized execution strategy. And so far, things have gone very well for us. So I wouldn't be concerned about a little bit of slippage in the spend or getting these contracts. It's actually so far turned to be positive to take our time and get the best possible contract to ensure the best possible outcome on this project.
spk07: That's great to hear, George. Maybe one last question, switching gears a little bit to Olympia's very good quarter in Q3. And so, you know, I guess going back, there have been a bit of not volatility, but a bit of difference in the quarters. Q1 was good. Q2 was not as good. Q3 now is good once again. Could we expect more stability, you know, going forward now that, you know, you've implemented, say, bulk in motion, you've implemented or the ventilation is now in place, you know, Is the current level what we can continue to expect in terms of production? Costs were fairly good as well, $1,390,000 in Q3. Is that a good level of cost, or can we expect even better?
spk03: Cosmos, maybe I'll answer it. Just some of the high-level implications on this results, and Joe can speak to the operational. So, I mean... For Olympias, number one, I would say the infrastructure improvements we've put in place are a game changer for us. But some of the volatility on Olympias has to do with external markets. We got hit with that payability issue a year ago. We've been clawing some of that back by finding other customers where we avoid the VAT. And even within China now, We avoid VAT at times in that some of the contractors pay for it in order to get that concentrate. So we've got clawed back some of that. Zinc metal price is down quite a bit, and that's had a material impact on the byproduct credit value that we get. And then overall, we were late getting that infrastructure that was completed in Q2. We had planned on getting that up in Q1, and so that had a cascading impact on the quality So I would say at a high level, some of these external factors just add volatility to Olympias, and I think you'll see some of that continue. But overall, what we're doing on the ground with the things we have control, we're in a much better position now. And, Joe, you can add anything you want to that.
spk04: I think you covered it pretty well, George Cosmos. The only thing that I would add is that As we go into 2020, complete 2023 and 2024, we anticipate continued improvement in our underground operations, and we're running into a point where mine and mill are pretty evenly matched. So there will be kind of a period going forward where a bit of work will be required in the mill to take advantage of additional additional production from underground so we'll keep you apprised of that as we move along but likely to see um you know a bit of melty bottlenecking in 2024. great thanks george and team for answering all my questions congrats once again a very solid q3 and have a good weekend thanks our next question comes from carrie mcrury of canaccord genuity please go ahead
spk06: Hey, good morning, guys. Just wondering about Kishlet Ag. You know, 3.6 million tonnes is a huge uptick in tonnes stacked. Obviously, the North Heap League pad is open and you've got the bigger gear in there. Just wondering how we should think about that rate on a go-forward basis.
spk03: Go ahead, Simon.
spk05: Hi, Kerry. Yeah, thanks for the question. Yeah, I think that rate is what we are planning... Moving forward, that's what we've been sort of alluding to with the bigger materials handling experiment that we have now available. The only caveat to that would be the summer months are our best stacking and availability months just due to weather effects. Typically, we do see a small impact from the colder months which we really factor into our plan for Q1. But beyond that, we expect to be at those type of rates for the majority of the year.
spk03: And I might just supplement that. I mean, if you kind of look backwards over the Kisadag life, it was a pretty consistent performer with a number of expansions over time. And really what happened beginning of last year, we started agglomerating the ore on the conveyor belts And that causes some pretty big challenges, particularly last winter. And essentially it was because we were adding essentially cement to the conveyors to do binding of the fines to support the high pressure grinding role. And that caused plugging and clogging of the transfer points between conveyors. So, I mean, our production dropped off as a result of that challenge. And as Simon said, by putting in these larger conveyors and the larger stacking equipment, that impact's not going to hit us going forward. But we will see some seasonal impacts. Whenever we get a lot of rain, or particularly in the winter, it's tougher to get the same tonnage as you do when you've got blue sky and great weather. So the run rate you saw in Q3, I think, is a good assumption going forward. We'll obviously be trying to push the open pit and the circuit for more tons, but I'd say the bigger opportunity and upside is actually in the agglomeration and how fine we crushed the ore, how much gold we exposed, and how effectively we can rinse that gold out of the crushed heat bleach pad. That's gonna be our focus going forward. That's probably our opportunity going forward as well.
spk06: Great, that's good color. And maybe just to follow up on Kisladag, you know, obviously the operations still working through the rain event from May, June. I'm just wondering how you're seeing production sort of heading into Q4 here. Are you starting to see an uptick in that sort of that impact wear off?
spk05: Thanks, Kerry. Yeah, we are seeing now that we're sort of beyond the The Q2, Q3 sort of challenges, as you're able to see when we're out in the field, things are sort of lining up fairly nicely. Irrigation rate and flows are up where we expect them to be. And now we're working hard to draw down on that inventory created over that period.
spk06: Great. That's it for me. Thanks, guys. Thanks, Kerry.
spk01: Once again, if you have a question, please press star, then one. Our next question comes from Kerry Smith of Haywood Securities. Please go ahead.
spk08: Thanks, operator. Joe, for scurries, getting the detailed engineering done is pretty critical to keeping the timetable. Is there any risk that transferring that engineering group from Vancouver to to Greece is going to cause any kind of delays, or are you pretty confident that that shouldn't be the case?
spk04: Thanks, Carrie. We're pretty confident that should not be the case, and we're working in good cooperation with LORE in oversight of that engineering. So essentially, we're still running the engineering schedule in concert with them, but we're doing it from site rather than afar. So in a lot of ways, it helps us in order to be, you know, kind of get time zones and other things out of, out of that and we paid real close attention to critical path engineering around filters and other things so that we don't put schedule at risk over engineering. And we've had good agreement with all of our vendors on production of vendor drawings and such. So we're feeling pretty good about it as a benefit in
spk03: shortening timelines for turnaround on key information and the like being you know with with the whole team consolidated in greece now carrie i'd say there's one additional benefit to to moving some of this engineering in country early and and that is you always have to run the filter of taking those engineering drawings and data and localizing it to regulations And so by doing that at an earlier phase, we eliminate some duplicate work, and it's a bit more efficient. And we've got confidence in the capability of these firms within Greece to be able to do this work. So I think there's some net benefits here, and we haven't really put any risk to the project from that decision.
spk08: Okay. Okay. And are all the long-need items now ordered? I assume they are and some are delivered to site, or what is the status of all the long lead items?
spk04: Kerry, this is Joe. So, there are no long lead items remaining on critical path. I mean, we're just cleaning up bulk items for procurement. And the last major piece of equipment I think mentioned earlier was the filters and the filters are packaged in shipment and receipts are started for site assembly, but all of that will be onsite end of 24, early 25, so no concerns on schedule and due to equipment. You know, and all of the work on existing equipment that was installed and review has also been completed. And, you know, any kind of requirements for modifications, other things due to, you know, standby time have been accounted for as well. So feeling really good about lead done.
spk08: Okay. And just maybe one last question on scurries. Are you seeing any issues in terms of hiring people deal of trades and labors as you ramp up to the 900 people on site by the end of the year? And the second part to that is, are the productivities that you're seeing so far from the contractors sort of add or better than what you'd budgeted?
spk04: So to take the first part of the question, as availability to workforce, There have been no issues to date for contractors managing to mobilize and bring skilled workers on site, so pleased with that. And as far as productivities, there's not a lot of data points out there, but the work performed last year around the mail building cladding cranes and the rest of it was at expectation or kind of at feasibility levels, and the work ongoing to date has been similar. But, you know, I think that remains, you know, a watch point for us going forward. But so far, Kerry, we're pretty pleased with productivities and how they match up with feasibility.
spk08: Okay. Okay. And just on fish today, maybe Simon can answer, are the recoveries through the agglomerated material kind of tracking with what you expected or better or How are they tracking?
spk05: Thanks Kerry. So far we're still pretty comfortable with the recoveries tracking as planned when we initiated the HPGR investment and really the agglomeration drum is a supplement to that to help us improve our materials handling and permeability on the pads and so far.
spk08: Okay. Okay. And then just one last question, if I could. How are the two electric trucks operating at Lamarck? I know you brought those two pieces of kit in. And, you know, what has the experience been?
spk05: So we purchased two, that's correct. We only have received one so far. And right now that one has been used pretty extensively to train and test the workforce while we're preparing for implementation in the underground activities. So we expect to see the second BV in the first quarter of 2024. So that's the sort of plan right now, and we'll be rolling the first one into service through this quarter, and then the second one as it comes onto site in Q1 of 2024.
spk03: Kerry, one of the things that I heard last week that was pretty cool, because I haven't been there to see the truck that just arrived yet, but it's about two minutes to change the battery, which is to me, pretty amazing. One of the big issues for us is you got to have an efficient truck where you're not stopped charging. And so we got spare batteries, but it takes two minutes basically to take a battery off and then get the other battery on to keep the truck moving. So they've come a long ways with making these electric trucks efficient. We can't wait to get the thing underground and see what it can do for us on productivity. They're faster. That's obviously a big win. And the ventilation impacts are pretty enormous for us. We don't need air to deal with diesel emissions with these trucks. So it's going to be awesome, I think.
spk08: And I guess the battery packs have to be changed with equipment or can it be changed by a biomechanic or an electrician? Are they heavy?
spk05: So there's an inbuilt battery changing unit. So essentially part of the design of the truck is to actually have a removal system installed on the truck so it's powered to lift off and drop down and then pick up a secondary battery or without the need of a third party to put it together. So the truck driver can do that without leaving the truck.
spk08: Okay, okay, great. Okay, well, that's great. I appreciate it. Thanks for answering my questions.
spk03: Thanks, Kerry.
spk01: That is all the time we have for today, and this concludes the question and answer session and today's conference call. You may disconnect your lines. Thank you for participating, and have a pleasant day.
Disclaimer

This conference call transcript was computer generated and almost certianly contains errors. This transcript is provided for information purposes only.EarningsCall, LLC makes no representation about the accuracy of the aforementioned transcript, and you are cautioned not to place undue reliance on the information provided by the transcript.

-

-