This conference call transcript was computer generated and almost certianly contains errors. This transcript is provided for information purposes only.EarningsCall, LLC makes no representation about the accuracy of the aforementioned transcript, and you are cautioned not to place undue reliance on the information provided by the transcript.

Eve Holding, Inc.
8/4/2026
Greetings and welcome to the Eve Holdings second quarter 2026 earnings call. At this time, all participants are in a listen-only mode. A question and answer session will follow the formal presentation. If anyone should require operator assistance during the conference, please press star zero on your telephone keypad. Please note, this conference is being recorded. I will now turn the conference over to your host, Lucio Aldworth. Please go ahead.
Thank you, operator. Good morning, everyone. This is Lucio Aldworth, the director of investor relations at EVE. And I want to welcome everyone to our second quarter 2026 earnings conference call. Our CEO, Johann Bordais, and CFO, Eduardo Couto, are joining me on the call today. After their prepared remarks, we're going to open the call for questions, at which point Marcelo Basile, our chief flight prototype engineer, will also join us to address more technical questions. We'll have a deck with a few slides and additional pictures that showcase our achievements in the quarter, including, of course, the more recent stages of the test flight of our full-scale prototype. The deck is available on our site at ir.com. Please feel free to download and follow along. And in fact, we just published on our investor relations website a video of our most recent transition flight and we encourage all investors and analysts to watch it. Let me first mention that today's conference call includes statements about events or circumstances that have not yet occurred. These are primarily based on our current expectations and projections regarding future events and financial trends that will affect our business and future economic performance. These forward-looking statements are based on current expectations and involve risks and uncertainties that could cause financial results to differ substantially from those expressed or implied in this conference call. We undertake no obligation to update publicly or revise any forward-looking statements because of new information, future events, or other factors. For a more detailed list of these risks and uncertainties, please refer to our SEC filings, which are available on our website. Now, I'll turn it over to our CEO, Johann Bordais.
Thank you, Lucio. Good morning, everyone, and welcome to our second quarter 2026 conference call. We had a good quarter with several milestones demonstrating steady progress. After the inaugural flight of our engineering prototype last December, we went through a series of hover flights. We concluded a planned ground test period of three months of software upgrade and which led to us to resume our flight campaign towards full transition by the end of this year. These three major phases validate not only our building block concept by extensively testing every part, but also the integration of critical systems such as fly-by-wire and fixed pitch lifter rotors. In parallel, we continue our rig testing of different components for our commercial aircraft and interact with certification authorities and partners. Lastly, we will go through the new LOI agreements announced at the Farnborough Airshow. The slide 3 details some of the tests we performed between May and July in preparation for transition. As I mentioned previously, we uploaded new software to optimize the synchronization between the lifters and the pusher to sustain lift during all the phases of flight. We also made sure that pusher, avionics, actuators, flight control, and other systems were tested again on the ground, this time with motors powered on and the aircraft anchored on the ground. On slide 4, we wanted to show you some additional details of the vibration test we perform on the ground. Because of wing-borne flights bring to the aircraft different pressure points, vibration, or aerodynamic loads, we attach a shaker device to the lifters to simulate and assess resulting oscillation in the entire aircraft. Slide 5 shows the progress of our accumulated flights. With successful completion of our ground test, we cleared the prototype to get back in the air and start transition flights. In total, our prototype flew 66 times and logged 2 hours 46 minutes of air time. Importantly, the prototype now enters a new phase with partial transition. This is when we gradually accelerate the aircraft by engaging the pusher, but still maintain the lifters powered on for the lift. The pusher was engaged at first with low RPMs and then powered up to around 1200 RPMs, allowing the aircraft to fly forward at 30 knots speed, which is about 35 miles per hour. In the coming weeks, speed will progressively increase to 60 knots and then to 80-90 knots to complete the full transition. At that moment, The lifters will be powered off, and all lifts will come from air passing through the wing, flying like an airplane. This is the aircraft's ultimate mission. Take off vertically, transition to wing-borne flight, and then transition back to vertical flight for landing procedures. Slide 6 shows some pictures and has a link of a video of one of the latest transition flights. The video is also on our website and social media platform. Now, more than quantity, our flight campaign also demonstrates quality. Every flight is digitally planned to test and validate specific aircraft components or flight metrics, and in total, we have validated 150 test points. It is precisely these validations that allow us to move ahead with confidence. Moving to slide seven, we can see here part of our physical infrastructure that supports Thank you for your attention. This is part of our testing process that should expedite the testing and the certification efforts, which also reduce the program cost. In parallel, on slide 8, we continue to advance our certification process with Brazilian certification authority ENAC. The means of compliance are almost completed with ENAC. These are the tests that need to be successfully performed on different components to certify the aircraft. Interestingly, few suppliers have already started testing some of the components that have means of compliance aligned already with ENAC. Separately, ENAC opened a new consultation with industry stakeholders on updated airworthiness certification base, reflecting the requirements alignment with FAA. This is another important step in the E100 certification process and contributes to the development of a robust regulatory framework for eVTOLs. Following the consultation period, which ends on August 18th, ENAC will review the comments received and assess the potential refinements on the criteria. In addition, ENAC published a proposed noise certification criteria for the EVE-100, which is the result of an extensive engagement between EVE and ENAC drawing on existing aviation noise regulations. Lastly, we applied through ENAC for TAP certification validation by EASA. and it is expected to certify our aircraft for European markets 12 to 15 months after ENAC and FAA. On slide 9, we continue to prepare readiness of necessary infrastructure for safe operation and EV tolls. We have partnered with Hitachi, a global technology leader in electrification, to ensure the vertiports can be reliably connected to a power grid and equipped to handle the high-demand, high-frequency operations. This includes enabling a sufficient power capacity, managing fast charging cycle, and integrating new demand in existing energy system. In Florida, we also partnered with Florida Department of Transportation focused on delivering insight in the infrastructure, operational procedures, and airspace navigation procedures needed to enable the safe and efficient integration of UAM into Florida's transportation network. On slide 10, you can see the timeline to certification. As I mentioned previously, we are now in the transition phase. We are around 30 flights away to full transition. Meanwhile, we are conducting a critical design review with our suppliers for each system and component that will be featured in our coming conforming prototype. This will allow us to and many more components within the required specs to produce and test our conforming vehicle in 2027. Without certification, an entry into service is expected for 2028, considering that we will need to fly our conforming prototype for around 12 months after the first crewed conforming prototype flight planned for the second half of 2027. Flight 11, we had a successful outcome at the Fambaro Airshow. and we met several investors at the show. We also announced two new LOIs for a total of 46 aircraft from MOVE for operations in Capo Verde and Cheerwaters, a Bay Point Capital company, a new lesser-in-hour backlog. This is a good segue into slide 12, which shows a total pre-order backlog of approximately 2,700 aircraft valued at about $13.5 billion at the list price, including the two new LOIs signed this quarter and announced at the Farnborough Airshow. And now, I hand it over to our CFO, Edu, for the second quarter of 2026 financial review.
You're reading a preview of the EVEX Q2 2026 earnings call.
Free account.