This conference call transcript was computer generated and almost certianly contains errors. This transcript is provided for information purposes only.EarningsCall, LLC makes no representation about the accuracy of the aforementioned transcript, and you are cautioned not to place undue reliance on the information provided by the transcript.
Chart Industries, Inc.
5/3/2024
Good morning and welcome to the Chart Industries Inc. 2024 First Quarter Results Conference Call. All lines have been placed on mute to prevent any background noise. After the speaker's remarks, there will be a question and answer session. The company's release and supplemental presentation were issued earlier this morning. If you have not received the release, you may access it by visiting Chart's website at www.chartindustries.com. A telephone replay of today's broadcast will be available approximately two hours following the conclusion of the call until Friday, May 31, 2024. The replay information is contained in the company's press release. Before we begin, the company would like to remind you that statements made during this call that are not historical, in fact, are forward-looking statements. Please refer to the information regarding forward-looking statements and the risk factors included in the company's earnings release and latest filing through the SEC. The company undertakes no obligation to update publicly or revise any forward-looking statement. I would now like to turn the conference over to Ms. Jill Ivanko, Chart Industries CAO. Thank you. Please go ahead.
Thank you, Ina. Good morning, everyone. Thank you for joining Joe Brinkman, our CFO, and me to walk through our first quarter 2024 results. For all periods referenced, all metrics are pro forma for continuing operations of the combined business of Chart and Howden, unless otherwise noted. Starting on slide five of the supplemental presentation, the first quarter is typically our lowest quarter of the year, and this year is expected to be no different. What is different is that the first quarter of 2024 was stronger than our typical Q1 across the board, resulting in setting first quarter records for orders, backlogs, sales, reported an adjusted gross margin, reported an adjusted operating margin, reported an adjusted EBITDA, and associated EBITDA margin. To summarize, orders were up 4%, organic sales up 18%, reported EBITDA up 73%, and reported gross margin up 260 basis points. We'll discuss comparative financial metrics on the next slide, but a few standout items. First quarter sales, of $950.7 million grew 17.4% or 18.3% excluding the foreign exchange headwind in the quarter. Also, Q1 2024 sales were our second highest sales quarter ever in our history, which is rare for a Q1. It also sets the stage for sequential growth in 2024, as we have not yet had a full quarter of Teddy 2, our Theodore, Alabama jumbo cryogenic tank facility. and our Tulsa facility CapEx that is still in progress. Reported gross margin of 31.8% was an increase, as I mentioned earlier, of 260 basis points compared to Q123. This was also our second sequential quarter with gross margin at or above 31.8%. And all quarters since we closed on the Houghton acquisition have been above 30% reported gross margin. This, as well as seeing the P&L benefits from our Synergy actions taking hold, drove adjusted operating margin of 18% and adjusted EBITDA margin of 22.3%. Similar to gross margin, this is the second sequential quarter where adjusted EBITDA margin has stepped up to be at or above 22%. And since the acquisition of Howden, each quarter has been at or above 21.5% adjusted EBITDA margin. Strong end market and chart-specific demand continues, resulting in record backlog of $4.33 billion. Demand is also reflected in our increasing commercial pipeline, our highest ever at over $22 billion, up from approximately $21 billion prior. We have identified more synergy opportunities, open production at Teddy 2, and so, in turn, there's an increase in our commercial funnel for marine space and rail, water treatment traction, And we're seeing broader content on international LNG projects to name a few contributors to this increased commercial pipeline. First quarter 2024 orders of $1.12 billion included record repair service and leasing segment orders, which increased 10.5% compared to Q1 23. We also saw first quarter stronger demand than typical in our European industrial gas end market. We're seeing that strong start already through April. All of this resulted in a 1.18 book to bill, which is expected to continue to be above 1 through the year. This strength in terms of Q1 versus typical Q1s is also a contributor to us reiterating our full year outlook for 2024. Slide 6 shows the first quarter of 24 versus pro forma first quarter of 23. I'd point you to the far right-hand column, which is the year-over-year changes in each metric. On the prior slide, I commented about the 18% adjusted operating margin. This is a 620 basis point increase compared to last Q1. Both reported and adjusted EBITDA margin grew more than 550 BIPs, as shown in rows 10 and 12. An adjusted diluted EPS of $1.49 reflects a higher first quarter 2024 tax rate than is anticipated for the full year, as we continue to expect full year ETR of approximately 20%. Finally, free cash flow was negative $136 million, which included 47 million of CapEx, 24 of that related to our Teddy 2 facility. This free cash flow was in line with our internal expectations and included specific first quarter cash outflows that are shown on slide seven. As we shared on our fourth quarter 23 earnings call, the first quarter always has specific cash outflows that occur once a year, and there were other specific cash outflows related to the 2023 divestiture fees and the Teddy 2 manufacturing facility capex payments. As you can see in rows A through G on the table on slide 7, there were $219 million of specific first quarter cash outflows outside of working capital and normal course capex. Approximately $165 million of these are not expected to repeat in the second quarter 2024. On the bottom left hand side of the slide, you can see that we continue to opportunistically optimize our balance sheet and we recently completed an amendment to our revolving credit facility with very strong bank support. This extends our RCF maturity date to 2029 and we received other favorable changes to terms and conditions. We continue to reiterate our financial policy as shown on the bottom right of the slide until we are within our target net leverage ratio range of two to two and a half. As I commented, there were about $165 million of specific cash outflows across five items that will not repeat in the second quarter. Turning to slide eight, you can see our outlook for free cash flow in Q2 is approximately $175 million. It's clear we need to be explicit to align outlooks on free cash flow based on quarterly information, and therefore we are providing the next quarter's outlook, and we'll do the same for the third quarter at the end of the second. Our Q2 cash outlook is driven by the non-repeating Q1 cash outflows as well as by items shown on the lower left-hand side of the slide, including sequential improvement in working capital. We anticipate the receipt of project payments in Q2 of approximately $125 million across our top projects and additional collections obviously beyond those globally. We also expect lower and final sequential capex related to Teddy 2. We did have $6 million of Q1 CapEx for our Tulsa facility to increase capacity and throughput on the Braves line there, and $2 million for our GOFA trailer facility expansion in Germany, all of which have existing backlog that will flow through these locations in the second half of 2024. And finally, we have no second quarter semi-annual cash interest payment. To date, second quarter 2024 cash generation has started strong. Turning to slide nine, a few points on the segment results, starting with cryotank solutions, or CTS. First quarter CTS orders of $159 million decreased about 4% when compared to the first quarter of 23, driven by a large rail car order booked in the first quarter of 2023. The increase in CTS orders sequentially from the fourth quarter of 2023 is what is important to today in our outlook, as we see continuing pickup in demand in global industrial gas, as well as having completed certain large customer long-term agreement renewals in March and April of 24. Additionally, the first quarter general industrial orders within CTS were the highest in our history. First quarter CTS sales of $160 million increased 13.6% when compared to the first quarter last year. This is very strong year-over-year growth, given that typically CTS grows in low to mid single digits. Reported gross profit margin of 20.5% is back in its normal range, coming off of the 2021-2022 lows from material price cost lags. Next, heat transfer systems, or HTS. First quarter, 24 HTS orders of $237 million decreased about 30% when compared to the first quarter of 23, primarily driven by specific large project bookings in the first quarter of 23, including big LNG. March 31st HDS backlog was about $1.7 billion and does not include the IPSMR International Big LNG Award from an IOC that we expect to book in early 2025. First quarter 24 HDS sales of $254 million had associated reported growth margin of 27.6%, a 160 basis point increase compared to the first quarter 23. and sales increased about 35% for HTS. Moving to RSL, which is a gem of a segment when you look at margins in particular. First quarter 24 RSL orders were record at $334 million. Orders increased 11.1% and associated sales of $301 million increased about 15% when compared to the first quarter of 23. It's also worth noting that we have had orders and sales growth above 10% consistently each quarter in RSL since we closed on the Howden acquisition. We're seeing a lot of demand, in particular in APAC, for upgrades to refineries for environmentally friendly equipment. Reported RSL gross profit margin of 46.7% was another RSL record, and gross margin in RSL has been above 43% each quarter since we closed on Howden. And finally, specialty product segment. In the first quarter of 24, specialty products orders were $391 million, which increased 40.5% compared to the first quarter of 23, and decreased about 2% when compared to the fourth quarter of 23. The sequential decline was primarily driven by a decrease in marine projects, as we had a very strong fourth quarter of 23 marine bookings. We expect marine and maritime bookings to increase throughout 2024, as we now have the Teddy 2 capacity, We'll come back to marine and heavy-duty sustainable transport applications in a few slides. Returning to specialty, in Q1, we had our highest-ever order quarter for carbon capture utilization and storage, or CCUS, in our history, driven by increasing activity in larger-sized projects, for us in particular in earthly labs. First quarter 24 sales of $237 million increased 6.7% compared to last year and sequentially increased just over 10% compared to the fourth quarter of 23, driven by timing of project revenue and the start of Teddy 2 pre-production. Reported gross margin and specialty was about 25%, and this was lower than we expect for the rest of the year due to specific project mix and first-of-kind project in the first quarter. We do bring first-of-kind projects in as there are multiple volume opportunities ahead, as well as aftermarket associated with the new build. On slide 10, we're showing the historical last 12 months or LTM pro forma trends. A key takeaway from this slide is that despite potential quarterly variances due to customer timing, the trend lines are all positive. I'd also point out that there was no significant drop off in our order book even when considering $620 million of big LNG orders in 2022. This is another way that shows the diversity of our end markets and the resilience of our aftermarket business. We've grown sales to $3.7 billion on an LTM basis from $3.3 billion in 2022. We've taken our gross profit margin to 31.6% on LTM from 27.8% in 2022. And we feel that this is just the beginning as our demand remains robust. Our backlog and commercial pipeline are both benefiting from key macro tailwinds, of which four of the main ones are shown on slide 12. First, starting in row one is global energy access. This is not only access, but security, stability of energy, and the fact that the world uses energy in everything we do. We continue to expect natural gas and LNG to be a part of this. Our customers are telling us this. The proof, though, is in our backlog with a variety of global gas associated orders. Let's spend a minute on some things happening in the LNG market. You have the CEDAR LNG project moving ahead with chart content. multiple LNG players buying their own ship fleets, and a lot of infrastructure being built globally. Beyond natural gas and LNG, hydrogen continues to have public and private support, and we're seeing this across multiple types of orders, ranging from liquefaction to storage to end use, including recently receiving a duplicate of our largest liquid hydrogen storage order in Europe to date. We also have strong visibility to the second quarter and the rest of the year, in particular in our hydrogen pipeline. Moving to row two, as we say in our nexus of clean, clean power, clean water, clean food, and clean industrials are all intertwined. This is the case with the macro driver of clean water scarcity, and it's getting more and more attention, in particular with the recent U.S. EPA designation of PFAS as hazardous substances. It's also important to note that in certain countries, clean water is a major political platform for government officials, and clean water touches clean power when speaking to green hydrogen as an example. In a couple of slides, we'll discuss our TART water offering and the associated commercial opportunity. So moving to the third row, as discussed in item one, there's growing demand for energy, period. It is in part being driven by artificial intelligence and data centers, which need electrification, energy storage, backup solutions, and cooling. All these applications fit our offerings very well, inclusive of CCUS, specialty compression, fans, air coolers, just to name a few. We have specific near-term commercial opportunities in these applications for data center heat rejection, power generation for base load and peak shaving, and energy storage. Just this week, the U.S. DOE's H2 at Scale initiative announced that a hydrogen demonstration facility is launched in Texas to provide power to the Texas Advanced Computing Center, or TAC. And please recall that we are one of the partners in H2 at Scale. The fourth row on the slide is the need to address existing and build new infrastructure, combined with a focus on decarbonization, especially in heavy duty transport applications. This is supported, again, by both the public and private sector, including with Biden administration's March 25th announcement of $6 billion of awarded spend via DOE for demo projects to reduce GHG emissions in heavy industrial applications. The private sector is progressing this as well with collaborations to study and develop low-emission trucks, trains, ships, and airplanes. And as one reason, we're very well positioned with our new Teddy 2 tank facility to serve these larger applications, in particular, in liquid hydrogen. So turning to slide 13, with our Teddy 2 facility and total solution offering globally, we're able to serve much larger heavy-duty transport applications, including aerospace, space exploration, additional rail, and onboard marine and the associated onshore infrastructure for liquid hydrogen. One such example is our new partnership with Energy Observer, specific to the Energy Observer 2, a liquid hydrogen cargo ship under development. The aim is to build an integrated hydrogen ecosystem, reducing the overall cost of liquid hydrogen and promoting its use in maritime transport. The establishment of a low carbon maritime energy hub combined with low carbon hydrogen production and the installation of port infrastructures is essential to achieving these objectives. And we'll partner on associated equipment and technology both with Energy Observer and their other partners. Another example is our recently executed MOU with Gaslog LNG Services to study the development of a commercial-scale liquid hydrogen supply chain, leveraging Gaslog's latest development of a liquid hydrogen vessel and our extensive experience in cryogenics and large-scale liquefaction solutions for the global distribution network and infrastructure. Our commercial pipeline for marine LNG, space exploration, and rail for our KETI II facility is over $400 million. Since we officially opened the facility a month ago, we have added an incremental $80 million to the commercial pipeline for this facility of potential opportunities. As you can see on slide 14, we have solutions and products that serve the macro tailwind we discussed of water, treating contaminants including PFAS, arsenic, biological processes, to name a few. Currently in our commercial pipeline, we have 65 opportunities for PFAS specifically. Eleven of those are new since the beginning of this year. As we've stated numerous times over the past year, there have been many benefits of the Howden addition to our business. One of the top on the list is the expanded aftermarket opportunity as shown on slide 15. RSL is 32% of our total revenues in the first quarter, and with sales growth of 14%, consistent order growth over 10%, we're set to have this high margin business become a larger part of our mix in the medium term. I'll now hand it over to Brinkman to talk about 2024 and our medium term outlook.
Thanks, Jill. On slide 16, to round out the key driver section, we show our main supply chain inputs. Generally, these have normalized from the highs we saw in 2021 and 2022. Carbon, stainless, and aluminum are all relatively stable, and each near their lower points over the past three years. We continue to watch freight carefully, given the Red Sea situation, yet have not seen meaningful cost changes from it to date. Turning to slide 18, with the foundation of the macro and specific key drivers we just went through, and based on our first quarter 2024 results being in line with our internal expectations, we reiterate our outlook. Slide 19 is an update to a slide we introduced in early November 2023 for considerations when you're modeling our 2024. Under positives, we have begun certain production in our Teddy 2 facility, so that is tracking well for 2024 revenue based on existing backlog. Additionally, We have approximately 63% of our next 12 months outlook covered in backlog, and we are seeing a trend towards larger project sizes, especially for Houghton content. As stated on our Q4 earnings call, we surpassed our year one Houghton cost and commercial synergy expectations earlier than originally anticipated. We are well underway on additional year two synergies. In the middle column, it is worth noting that while we are not dependent on the US IRA to achieve our financial targets, We anticipate the seven hydrogen hubs having potential incremental benefit to our backlog as they are deployed. When you think about our year and how the quarters play out, there are a few items to consider, including, but not limited to, further synergy realization timing in the back half of 2024, Teddy 2 revenue sequentially ramps throughout the year, specific larger projects that came into backlog in Q1 of 2024, will be later in the year revenue and into 2025. You can see our return on invested capital targets on slide 21. Our medium-term outlook for ROIC is mid-teens, coming from a jumping-off point of the last three-year average of approximately 8%. We have made significant organic and inorganic investments to position our company for growth and are in the early days of reaping the associated benefits. Howden is accretive to our ROIC and we now have less cyclicality with a shift to a higher portion of our business in aftermarket service and repair. On slide 22, we again reiterate our medium term financial outlook as we had previously shared in November 2023 and reiterated in January 2024. We have multiple contributors to achieving these, including our full solution mixes broader than just LNG and hydrogen. As you've heard today, And we play across the entire value chain globally. We now have a higher mix of aftermarket and services revenue and an incredibly large, diverse, and global installed base. Price cost continues to be a positive driver for us. Volume, productivity, and other chart business excellence activities continue. And we have a midterm target of mid-30s for our gross profit margin on an LTM basis. We are at 31.6%, up nicely from a year ago. and well on track to reach our 2026 targets. And last but certainly not least, we are benefiting as the industry is moving to a modular approach and IPSMR demand is going international.
Thank you to our entire OneChart global team who delivered a record first quarter while continuing to deliver year two synergies in the safest way possible with a total recordable incident rate of 0.52 and 70% of our locations around the world having had 12 months or more without a recordable incident. Keep the momentum, team. Safety with stakeholder orientation, strong work ethic, and giving back to our communities and operations. So thank you again to the One Chart Global team. Ina, please open it up for Q&A.
Thank you. Ladies and gentlemen, we will now begin the question and answer session. Should you have a question, please press star four by the one on your telephone keypad. You will hear a three-tone prompt acknowledging request Questions will be taken in the order received. Should you wish to cancel your request, please press star followed by the two. If you are using a speakerphone, please lift the handset before pressing any keys. Your first question comes from the line of Martin Malloy from Johnson Rice. Please go ahead.
Good morning.
Hey, Marty.
Hey, Marty. All right. First question I wanted to ask about the RSL segment, and you've delivered several quarters of growth there in the order outlook. And I just wanted to try to see if you could maybe talk a little bit more about the runway there and some of the drivers that are impacting this. Is this just the putting more equipment through all the service centers that you acquired through Howden, monitoring the equipment in different ways? If you could maybe talk about that a little bit. Absolutely.
And thanks for starting with RSL. I mean, as I commented in the prepared remarks, it really is a gem of a segment. The double-digit growth in orders and sales throughout the time we've had Howden. There's still quite a bit of runway here. And one of the things that we're doing as part of our year two synergy activities is we've created a global revenue operations team led by one of the aftermarket leaders of Howden that is going to pull together all of the remaining install base from ChartLegacy, and we're going to drive what we did in year one through that. There's dozens of other actions well underway to continue to take advantage of the runway that exists here, ranging from the digital uptime install base. We did have our first digital uptime connection in Earthly Labs with Real Ale Brewery this past quarter, and so there's opportunities like that as an example. In terms of drivers impacting the margin in the first quarter, we had a very strong mix in the Americas. In China, RSL, we had very strong manufacturing operations efficiencies, and so we see that opportunity continue ahead. In terms of drivers of the demand and why are we continuing to see this double-digit demand, the first thing I would say is because of the global footprint that we have, and the ability to serve the world versus just North America and a little bit of EU like we had in ChartLegacy is really a key contributor. We're also seeing a real strong push in many of our new build customers toward decarbonizing their existing facilities and locations, in particular in the mining segment where the need for, again, clean air, hotter, deeper mines is driving some retrofits happening there. And then lastly, we are seeing some repair service retrofit activity on existing facilities in LNG as well.
Okay, great. And then for my second question, I wanted to talk about the water side and the new EPA regulations and kind of what it means to chart in terms of the scope that you're potentially able to sell into a municipal water plant.
Yeah, so this is an interesting one and certainly the EPA new regulations are going, we believe, are going to be a catalyst in this area for our business. Recall and step back, we acquired added water technologies as well as Blue and Green over the last four years to really bring the capability to treat any contaminant across the board. The added water technology is the one that targets the PFAS in particular. And we've had an increase in our commercial pipeline. I think you're going to see this take a little bit of time to flow through in terms of the order book and in terms of the activities. Certainly, private sector companies are trying to figure out what does it mean to them, what are the steps that they're doing. But just the sheer fact that we had 11 new opportunities out of our total of 65 enter the commercial pipeline since the beginning of the year says that people are at least thinking about and talking about it. So I viewed it as a medium-term catalyst for us. And we're really well positioned to do that. We're also seeing a lot of international opportunity, not specific to PFAS, but rather to arsenic. And so our treatment system is very targeted for that as well. And we've seen some really good international orders over the last 12 months with a strong pipeline ahead. So while water is a single-digit percent of our total business, like in low single digits, The runway for growth ahead is really exceptional, and there's not a macro tailwind that doesn't support that.
Great. Thank you very much. I'll turn it back. Thanks, Marty.
Thank you. And your next question comes from the line of Mark Yankee from TD Cowen. Please go ahead.
Hi. Thanks. I wanted to start with the orders. solid orders here in the first quarter, but it didn't seem like there were any large items that were contributing. So the question is sort of, is this a good baseline level of orders to think about? And then we can add large items to that. And then when I look at the year over year progression, I think last year you had some big LNG in it. And if I take that out, the growth rate is kind of like 20%. So that seems pretty high for a base level, but maybe you could talk about the base level outlook and sort of what the growth rate for that should be.
Yeah, thanks, Mark. And definitely a strong order quarter, especially for a Q1. We normally wouldn't have seen such broad-based in a Q1 just coming off of people's spend in Q4. So that's a good, robust demand indicator that we see. One of the things that is happening in terms of our business is the more we're taking our products into these high growth end markets that are solution set oriented or project oriented is we're now starting to get more frequent kind of medium size orders and it's not dependent on just LNG as an example or just hydrogen as an example. I do want to pause there and say we have a really good line of sight on strong Q2 hydrogen order activity. So I expect that's going to continue. So it's hard to call out, you know, we always historically had called out big LNG because that was really the thing that the only kind of large of its size. And now there's more consistency in the medium-sized projects in multiple end markets. And so to directly answer your question, I would expect that, you know, robust demand continues. If you look back over the last, I think, seven quarters, six of the seven were a billion dollars or above. So that's kind of the proxy that I use on it or the one book-to-bill, kind of consistent one book-to-bill on a regular basis. From Q1 to Q1, you're correct. We did have the large LNG activity, big LNG, large project activity in the first quarter of 23. We were pleased, though, when you look at peers and other industrials and Other oil field companies, you look at it and having just orders period up 4%, we were very pleased with kind of the absolute metrics in the first quarter, especially, again, coming off of such a strong fourth quarter. Yep.
Okay. Thanks for that, Jill. And then the other one I had was just on free cash. So, you know, if you're going to do the 175 in the second quarter, that's $40 million for the first half approximately you'd need to be doing. 550 in the back half to be to the midpoint of guidance. And that's like a really high conversion of what consensus has for the back half of EBITDA, which I think is, you know, there's some exceptional items expected there in the back half. Could you talk about what those might be if there are, you know, one-off cash inflows in the back half that are supporting the outlook? Maybe there's some seasonality in there and what the sort of run rate conversion of EBITDA ought to be when we get past all this noise?
Okay, yeah, so stepping to the first part of your question, I'm going to try to take it in pieces, Mark. What I would say is that we do have quarter to quarter, we have movements between that, between working capital, AR, AP, just kind of normal in our business. There's nothing in working capital outside of the fact that inventory hasn't spiked, right? We have good line of sight of our CapEx timing. So 2H CapEx in particular is going to step down from the first half of our CapEx in 2024. I'd also point to some of the things that we had just on Q2 on slide eight that we talked about around project milestone payments you know, project payments. So these are payments for work done. They're not payments for buying material or anything like that. So that, and we call that a few there for the second quarter. If you look at kind of how are your ramps based on more projects coming into backlog in Q4, Q1, Q4 23, Q1 24, that kind of, that is the number one outside of normal course and CapEx step down. That will really sequentially drive 2H higher from 1H on cash. Run rate conversion was, I think, the last part of your question. So, yeah, we look at it as free cash flow as a percent of sales and kind of mid-teens is our target.
Got it. Thanks very much. I'll turn it back.
Thank you. And your next question comes from the line of James West from Evercore. Please go ahead.
Hey, good morning, Jill.
Hey, James.
So really nice first quarter execution, good order, especially relative to your global industrial peers who are all down in terms of orders. So just wanted to highlight that. But really my first question is around both CCUS and hydrogen and kind of what you're seeing there in terms of demand and what you think gets pulled forward first. Because we've had this kind of multi-year of back and forth on, well, it's hydrogen, well, it's CCUS. And I'm kind of curious, it seems like both are actually starting to go and starting to get pulled forward and starting to move kind of in tandem now. I'm curious if you agree with that and if that's what you're seeing in terms of demand.
Yeah, thanks, James. And first of all, thanks also for the call out on the absolute first quarter metrics. You're extremely pleased with those. When you look at CCUS and hydrogen, I think you summarized it perfectly in terms of what we're seeing where they both seem to be increasing in activity and in some cases together. Our first quarter being our highest order quarter ever in CCUS is an indicator of that. You know better than anybody that I've been talking CCUS for four years and it's just been a little bit slow to get rolling. But now we're seeing real projects. And what I would say that's super interesting from our view in our portfolio that we're seeing the Earthly Labs offering, which we call small scale, is now what was originally half a million dollar orders. We're now getting one to five million dollar orders because the size is increasing. So the scale is increasing. And yeah, I think that you're going to see that continue to be a key part of all of this. Then you start getting down the path of like the data center stuff and how CCUS correlates with that and there's an immense amount of opportunity associated with the need for CCUS with respect to data centers. Hydrogen, we've seen hydrogen be fairly consistent. I was very pleased with the fourth quarter and the first quarter hydrogen activity. Mainly, setting aside the absolute dollar amount and number of projects, the fact that it is truly going global. We're truly seeing real projects with real money behind them, ranging from compression for heavy industrial in Europe to the liquid hydrogen storage tanks in Europe. That one's interesting to me, too, because historically, Europe has been gaseous, mainly, and now we're starting to see some liquid infrastructure coming into play. But we highlighted the energy observer because you're seeing now a correlation of hydrogen, liquid hydrogen for heavy duty transport and the onshore infrastructure. So good momentum. The thing that we do watch carefully is the fact that you have a lot of people that want to do projects in hydrogen and not all of them get to FID. And so ensuring that there is funding available, financing available for these types of projects is something that we watch carefully. And then my last comment, realizing it's a very long answer, that we do think the hydrogen hubs in the United States, the seven, are going to coalesce around the projects that they're going to do here likely later this year, early next, in terms of when you start to see some of those orders get deployed to the supply chain.
Right. Okay, got it. And then maybe just a quick follow-up for me on the margin. The margin performance was excellent in the quarter. And curious, and I know you guys aren't stopping here. You're going to take that margin higher. But how much more room do you think we have to go with respect to margin? And have we seen the full benefits of Howden and the increased aftermarket in the margin yet, or is there still some, I guess, easy pickings to see here in margin of performance?
So we definitely, as Brinkman said, have that medium-term outlook, which is the mid-30% gross margin and well, well on our way to that. There's much more ahead here. I think what you see year one with Howden was great and now we're kind of in a cadence and now what we're seeing is, okay, let's optimize. Let's look at where there's efficiencies and where year one it was really low hanging fruit and now it's really about the optimization. A good example is we had the opportunity to consolidate, as we operate internally, a couple of our regions together. And so there's savings there just from having a certain number of entities, as an example. But definitely more room to go. And I think the other side of it is the more project business and full solution business that we get, while understand that It's hard having movements between three-month periods or quarters is actually a really good thing if you look across a year or 12-month period to the margin profile because we're getting that engineering work, the technology, and the equipment associated with it. And I think we had somewhere in our notes that the project sizes for our content are getting larger, in particular on Howden. I was chatting with one of our Howden presidents that had been with the business for many years. And he said, I've never seen before this number of projects in our commercial pipeline that are above $5 million, because typically $5 million historically for Howden on its own would have been a big order. But now that portion of the total project size for them is getting even larger. So tons of opportunity. And then my last answer to your question is RSL, aftermarket, it's done exactly what we wanted it to do in terms of margin, in terms of growth, and in terms of helping us not have that whipsaw cyclicality if a big LNG project goes away or something like that.
Got it. Thanks, Jill.
Thank you. Thank you. And your next question comes from the line of Ben Nolan from CFO. Please go ahead.
Thanks. Hey, Joe. Hey, Ben. You have a couple. First, I wanted to go back to the RSL in appreciating that it's probably an area where you're capturing some of the most synergistic benefit from the Haldane acquisition. I think it's a little over a third of the revenue mix now. It's growing at a pretty good clip. Longer term, what do you think, Jill, is a fair assumption for what RSL will be out of revenue after things settle out? Could it be half of what you do or 40%? Just curious how you're thinking about where we land.
Yeah, thanks for the question, Ben, and thanks for the call out on RSL. I mean, as I just said, it's just really done what we expected it to do, and in some cases more. There's a lot more to go here, and I'm very excited about it. What I'm really excited about is, you know, you take like a first-of-a-kind opportunity that we get on the new build side. And that's great because historically we take the first of a kind to either be an innovator in the market or help market make or see a lot of volume ahead for the new build side. But now with the aftermarket presence that we have, we also take those types of first of a kind if we see a tail for the aftermarket repair service side of things. In an ideal world, I think our split would be somewhere in the 45% for RSL. And that's clearly based on the growth rates. You do the math to get to the longer term. But I took your question to be where do we see it kind of in an optimal construct of the business.
Okay. Now that's helpful. And then the other question is we have seen some elevated pricing for things like aluminum and carbon steel. And I know that that was an issue a couple years ago. You guys took some steps to – uh at the time ensure that you know it you could pass through those costs could you maybe just talk through a little bit how you know how that stands if there is an element of uh you know whether we should see you know increased pricing and lockstep with increased cost of goods sold or is there any any risk of you know a timing gap or anything like that yeah
As we've talked before, Ben, the pricing mechanisms that we have in place protect us quite well from changes in the carbon, the steel, the aluminum. We're able to, for projects specifically, lock in the costs at the time of order very nearly thereafter, so we have very little susceptibility to market swings. Like we had in the deck, the uh the carbon steel and aluminum has largely stabilized aluminum's had a little bit of a uptick recently but nothing too alarming so we're well positioned to uh to uh pass uh pass increases in those those costs along and uh in the price cost okay and just to just declare about how much is the cost of those commodities in in the uh
Cost of goods sold. I assume most of it's labor, but just to frame it.
Those three commodities?
Well, basically your commodities as part of your cost of goods sold. How big of a slug is it?
I would say it's less than 20% of the cost there. Okay. All right. Thank you.
Thank you. And your next question comes from the line of Roger Reed from Wells Fargo. Please go ahead.
Yeah, thank you. Good morning. Hey, Roger. Hey, Jill, Joe.
Yeah, I'd like to just maybe, Joe, some of the stuff you talked about on the medium-term targets and getting the, I guess, the gross margins and ultimately the EBITDA margins up, and Q1 did show progress on that. As you look Within the orders, the backlog that you have, you mentioned discipline price cost is part of getting there. Like, how is that developing? You know, what is the visibility that you have within the orders and the backlog to say that that's holding and that's there? And then, you know, how does that fit in also with the productivity part as you've now had Houghton for a year?
Yeah, well, just Firstly, on the visibility of increasing EBITDA and margin over time here, and we've got the over $4 billion of backlog, 63% of the next 12 months covered here, and we've got good visibility on the price cost there, so we know where margin is going on a roll-forward basis. That, as we highlighted in our earlier comments, we've got As every quarter progresses here, we've got more of the cost synergies being realized and baked into our results here. So that's just margin tailwinds, if you will. And then we have charged business excellence, like I highlighted as well, generating additional costs out constantly. So we feel very strongly about our medium-term outlook.
And hey, Roger, one other point to that is the increasing mix of RSL just naturally helps us there.
Yeah, definitely.
Yeah, no, that business has been great in terms of the steadiness, taking some of that seasonality out, as you mentioned. The other question I'd like to come to, and obviously you've had to put a lot of explanation into the one-time factors here in Q1, how the, what you see in terms of margin improvement, how that's going to work into cash flow generation and pre-cash flow generation as we go forward. I mean, back at the time of the merger, I mean, different numbers were tossed around, but, you know, it was 80% conversion to pre-cash flow from cash flow to I don't expect that every quarter, but what's the right way to think about free cash flow conversion? I mean, 95% to 100% seems pretty strong, but, you know, we haven't seen that in the first few quarters here with the Howden deal. So I'm just curious how to think about that, you know, with the occasional, you know, does that include the interest expense payments, the, you know, other items that can come along on a seasonal basis?
Yeah, thanks for that question. I think it's a really important one. You know, I would say clearly as I commented in my prepared remarks that we have taken the feedback that we need to be more explicit on kind of what does the next quarter look like, at least through 2024, given that it's our first full year of the combined business. And we've taken that to heart to try to give visibility to what we're seeing. I think your point is extremely valid on how we ramp to that 95 plus percent of the cash conversion in the medium term goals. And it's going to take a little bit of stair-stepping to get there. But the metric itself does take into account all of the items that you refer to interest in these kind of different topics between quarters like we talked about on Q1. So a ramp to get to that point, but certainly The increasing EBITDA margin profile helps that, drives that. The fact that we anticipate continuing to pay down debt, so the discipline on our target to the net leverage ratio. And we said toward two to two and a half is our target. But in the near term, in 2024, mid 2024, the high twos that we've said before. So there's a way to get there. There's a path to get there. It requires us to continue to deliver margin, continue to pay down debt, and also, you know, we feel really good that there's more and more synergies out there that we're seeing that can help drive that.
Yeah, and I would just add to that, you know, as we highlighted in the earlier comments, you know, we're coming off of a pretty significant CapEx spend cycle, you know, with $47 million in Q1 here, but for the year we expect that more on the $120 million range. We're just finishing up on some very large CapEx expenditures needed to convert backlog, add that additional throughput, which is going to drive the sales, and the CapEx spending will come down as a percent of sales here towards the end of this year and into 2025.
Okay, thanks. Appreciate that. Yeah, and I mean, like James said earlier, right, I mean, the order trends backlog for y'all are much better than what we're seeing from others. So, you know, next step to conversion, right?
But thanks and good luck. Thanks, Roger. Appreciate it.
Thank you. May I ask analysts to have a limit of one question each? And your next question comes from the line of Eric Spine. Please go ahead.
Hi, Jill. Hi, Joe. Hey. Hey. So maybe we just go back to carbon capture a little bit. I know you touched on it earlier, but I just want to kind of contrast it with how you've discussed it in the past. And I know you viewed hydrogen as, what, 12 to 18 months ahead. You know, is this quarter, given your commentary, something where you think it actually is now know going to be a more repeatable predictable business do you still think this is kind of stops and starts here in advance of that you know just just maybe how are you thinking about that and maybe contrast it with where hydrogen is in its kind of development yeah yeah thanks for uh pointing it out because we are
As you know, as one of our long-standing followers, you know, I've talked about it here for four and a half years, and I think that it took longer than certainly we had anticipated, but we were pleased to get the technologies in when we did because it allowed us to really develop early feed and pre-feed relationships with a lot of the folks that some of them will move ahead. I think it's definitely starting to be real and tangible. We actually debated internally as to how to talk about, you know, at some point here we're going to start talking about carbon capture, water as a percent of our total business because they're starting to get sticky enough that that's a metric that can give you guys a jumping off point. We didn't do it this quarter, but it's pretty damn close to being ready to share that. So that is a qualitative statement, but I definitely think that what we're starting to see is global traction on carbon capture. I also think that in the last few years on carbon capture, it was really, okay, you've got people doing demonstrations, or you have, in our case, Earthly, which had great traction from day one because it was an economical, easy-to-install solution and solved for CO2 shortages. The larger scale is what's taken a little bit longer. But now we've got the pipeline that we had before and an increasing pipeline related to all of the discussion that you hear on artificial intelligence and all of these kind of energy-intensive actions. And so I think that's also kind of what I would say a relatively near-term catalyst. Is it 12 to 18 months behind hydrogen? I think it's accelerating, so it was really kind of three years behind hydrogen in my opinion. But we're seeing it accelerate. And certainly with Q1 orders in carbon capture being a record, that's a pretty good place to jump off from as we head into the rest of this year. And then maybe my last data point for you on carbon capture is, yeah, we've got our highest backlog in carbon capture as of the end of the first quarter that we have ever had, obviously given record quarters. But it's sequentially stepped up. Backlog has sequentially stepped up or essentially doubled since a year ago for carbon capture.
Thank you. Thank you. And your next question comes from the line of Rob Brown from Lake Street Capital Markets. Please go ahead.
Good morning, Jill and Joe.
Good morning.
Just wanted to follow up on the year two synergy kind of effort on, I guess, the cost side. What's sort of the key areas you're focused on and how do you see that playing out for the rest of the year?
Yeah, it's interesting because as we said at our Q4 earnings call, okay, we surpassed early both the cost and commercial synergies and we're going to keep going on years two and three. I've said that Externally, we'll let you know when we hit a billion dollars in commercial synergy orders, and we're well on our way toward that number, certainly to be achieved here in the coming next couple of quarters, if not in the next quarter. And on the cost side, it's really around, year one was heavy low-hanging fruit, hitting our supply base, restructuring, facility consolidations were applicable, which there were only a few there. And now where we're into is things like entity rationalization, where we can optimize entities from a cost standpoint, but also you get benefits like tax savings and ETR benefits, which Joe, I think, referenced in his comments, and things around just tangible costs like audit fees, right, where you had audit fees for, 10 different auditors on statutory or larger costs in year one, that type of thing. So lots of different activities, but we will continue to optimize. And I also think that the more we get to know the businesses, the more we're taking advantage of the talent throughout and they're coming up with new cost energy ideas. So we are tracking as of today to be on track for our year two target from the original acquisition model for cost and commercial.
Thank you. And your next question comes from the line of Pavel Mokhanov from Raymond James. Please go ahead.
Thanks for taking the question. You flagged the Chinese LNG orders. And I remember a decade ago when PetroChina was your biggest customer of the whole company. Are we seeing another LNG transportation boom in China, or is this caused by something else?
We're definitely seeing LNG transportation infrastructure. I'm not sure I'd call it a boom yet, Pavel, perhaps like a recovery taking advantage of lower natural gas prices, but this is very broad-based, so it's not concentrated with any one particular customer. So we're seeing multiple orders related to, in particular, the LNG trailer side. So I think it's reflective of having been lower the last couple of years, but also reflective of the fact that LNG natural gas is everyone's view. I guess I can't speak for everyone, but broadly our customers are saying it's going to continue to be a key part of of their mix, their infrastructure, and their energy source. So I think we'll continue to see that infrastructure for LNG, in particular on transport and ISOs, import terminals, that type of thing.
Thank you. And your next question concerns the line of from UBS. Please go ahead.
Good morning. Can we get a little more details around this order with element resources for renewable green hydrogen and then a little more details around the collaboration with GasLog LNG services, I guess, both related to hydrogen. So I'm assuming you could give us more details on those.
Yes. Thank you for the question. So let me – well, first, what I would point out is we like – those two are great examples of the – breadth of the hydrogen being used in different applications, and then also different geographies. Element being further along in terms of their progress for the city of Lancaster, California. That project is liquefaction for their site in Lancaster, California. And just recently, I think last week, they announced the purchase of additional acreage and additional land for future expansion. So good traction there and certainly, I think, reflective of kind of how the U.S. hydrogen economy has started being specific to California. And now we're seeing that hub structure here in the future that's going to take similar opportunities around the United States. And then, so future, there is more future opportunity for us with Element Resources. And they're very disciplined and strong leadership in that business that has decades of both oil and molecule experience. And then on the gas log side, so this is earlier days. This does not have an order related to it yet. This is a partnership. And so ahead of What we love, and we started hearing this at COP 28 in December of 23, was that this large scale infrastructure for liquid hydrogen is being focused in on and honed in on, whereas prior to that everybody was talking ammonia for marine in particular. So this is around larger scale ship and marine transport with associated onshore infrastructure. And the cool part, I'll wrap my answer up. The cool part I see, the thing I like about this, is this onshore infrastructure for heavy duty transportation can work together across industries. And so while right now we're having these studies and this work done with a gas log on the marine side as an example, or an energy observer on their infrastructure, or aerospace people on theirs, this is going to converge on itself and leave us with just an immense amount of future opportunity. The other thing about GasLog that is specific to our partnership is we're, again, starting to see what was traditionally a very gaseous, siloed hydrogen market in Europe turn toward longer distances, heavier transportation, decarbonization, which is liquid.
Thank you. And your last question comes from the line of Ati Modak from Goldman Sachs. Please go ahead.
Hi. Good morning, team.
Hey, Ati.
Chil, you spoke a lot about carbon capture today. So, you know, keeping up with the theme, seems like Erty Labs is getting a lot larger, which is great to see. But I initially thought SES was the driver in the quarter, given its industrial scale. So curious on any color you can provide on that order in particular and how close we are to increase commercialization and orders in SES going forward?
Yes, thanks for the question, Adi, and good point. What we've done internally and haven't really shared kind of the sausage making externally, but the Earthly and the SES teams work very closely together. So you're seeing kind of Earthly scale up and SES's expertise at the larger end help them in their application. And SES gaining quite a bit of global traction We did cite the Greymont agreement. There's numerous others that we're not able to speak to publicly just under NDA of work that's being done. We're definitely seeing that in the UAE in particular, so good near-term opportunities there for SES. And the other kind of end market I'd point to for SES is on the lime cement side of things. really quite a bit of traction there toward commercialization. So, yeah, your point's extremely valid, right? Initially, SES was for kind of this is going to be our large scale. We've learned a lot about what end markets that have the money to do this and that it makes sense for them to do. And while we refer to Earthly and SES separately, it really is kind of one carbon capture solution that goes to different applications. And maybe my last comment on SES slash Earthly or our carbon capture end market, starting to see biogas also come into play there, which was a pull through from Howden's equipment and customer sets to pull our technology through. So that's getting some legs as well. We've had a few orders there.
Thank you for your question at this time. Ms. Ivanko, please proceed.