speaker
Operator
Conference Operator

Good day, everyone, and welcome to today's AMG Q4 and full year 2023 earnings conference call. At this time, all participants are in a listen-only mode. Later, you will have the opportunity to ask questions during the question and answer session. You may register to ask a question at any time by pressing the star and 1 on your telephone keypad. You may withdraw yourself from the queue by pressing star and 2. Please note, this call is being recorded. I will be standing by if you should need any assistance. It is now my pleasure to turn the conference over to Michelle Fisher, Senior Vice President of Communications.

speaker
Michelle Fisher
Senior Vice President of Communications

Welcome to AMG's fourth quarter and full year 2023 earnings call. Thank you to everyone in Europe joining so late in the day. Joining me on this call are Dr. Hein Schimmelbusch, the Chairman of the Management Board and Chief Executive Officer, Mr. Jackson Dunkel, the Chief Financial Officer, and Mr. Eric Jackson, the Chief Operating Officer. AMG's fourth quarter and full year 2023 earnings press release issued earlier today is on AMG's website. Today's call will begin with a review of the fourth quarter 2023 business highlights by Dr. Schimelbusch. Mr. Dunkel will comment on AMG's financial results, and Mr. Jackson will discuss operations. At the completion of Mr. Jackson's remarks, Dr. Schimelbusch will comment on strategy and outlook. We will then open the call to take your questions. Before I pass the call to Dr. Schimmelbusch, I would like to expressly refer you to our statement on forward-looking statements and the meaning thereof as we have used at all previous occasions and we will use at this earnings call, and which explanatory statement has been published as part of our financial presentation and on our website, all in connection with this earnings call. I will now pass the floor to Dr. Schimmelbusch, AMG's Chairman of the Management Board and Chief Executive Officer.

speaker
Dr. Hein Schimmelbusch
Chairman of the Management Board and Chief Executive Officer

Thank you, Michelle. The strength of our lithium and vanadium businesses brought us an all-time high full-year adjusted EBITDA of $350 million in 2023. We also set another record in 2023 with operating cash flow of $223 million, which was 33% higher than in 2022. These results underscore our low-cost position in both lithium and vanadium. We were 38 million free cash flow positive for the year despite investing 169 million in capital projects as well as acquiring a 25% stake in Sinwald in 23. Market conditions for all products in our critical materials portfolio substantially weakened as the year progressed. the lithium price decline is unprecedented. The average quarterly price of lithium carbonate decreased more than 76% versus the average of Q422. Another record was set in 23 by EMG Engineering, which had its highest ever full year order intake, 350 million. AMG's order backlog was 295 million at the end of the year. This record level was driven by strong orders for remelting and heat treatment furnaces over the course of 23 and our spare parts and services division during 24. AMG, through our critical materials science-based solutions, contributes to CO2 reduction by enabling our customers to increase the efficiency of renewable energy production and enable energy-saving strategies. We measure the enabled contribution to CO2 reduction at our customer level via stringent third-party developed lifecycle assessments. We base this mission on the nature of the high-growth environment and believe we can achieve higher financial returns and use our proprietary technologies to be at the forefront of the industrial contribution to CO2 reduction. Last year, our enabling CO2 reduction portfolio enabled 110 million tonnes of CO2 reduction versus 99 million in 2022. In terms of our expansion projects, our lithium concentrate plant in Brazil will temporarily stop production for the changeover period in March to the expansion of 90,000 tons to 130,000 tons. We expect to produce 93,000 tons in the full year of 2024 and will operate at the full expanded capacity rate or 130,000 tons per year in the fourth quarter of 2024. Our lithium hydroxide refinery's first 20,000-ton module in Bitterfeld, Germany, is in advanced phases of commissioning, and we expect the production qualification process to start in Q3 this year. This is the first European hydroxide refinery. AMG Vanadium's Saintsville, Ohio, facility surpassed its target production volumes in Q4 23. Moreover, The production from both the roasting operation and the melt shop exceeded historical averages achieved by the original AMG Vanadium operation in Cambridge, Ohio. Our innovative lever projects are vital for industrial power management applications, accelerating the energy transition. The batteries are currently under various stages of building and development. One is operational. Three are currently under contract and being engineered, and 15 are in bidding and development stages. AMG Lever has agreed to acquire the vacuum redox flow battery activities of JM Voigt SE in Kokage, which has developed an advanced technology for controlling and balancing large-scale high-voltage vanadium energy storage systems. The technology complements LEVA's vanadium systems development. Earlier this month, AMG Vanadium acquired the processing technologies and IP-related activities from Transformation Technologies Inc., TTI, a U.S. company based in Oregon. The unique thermal treatment of spent catalyst and other oil refining assets into valuable products is complementary to AMG's spent catalyst processing technology and extensive know-how. We will incorporate this DTI technology into our global strategic growth initiatives conducted through Shell and AMG Recycling BVE. Phase 1 of Shell AMG Recycling PV Super Center project in the Kingdom of Saudi Arabia plans to produce 8 million pounds of vanadium oxide from 7,000 metric tons of gasification ash located at a site in Dubai, Kingdom of Saudi Arabia. The FEL-3 basic engineering has been submitted. The full Supercenter project will also include the processing of spent catalysts, a fresh catalyst R&D facility, and the lever hybrid energy storage system. I will now pass the floor to Jackson Dunkel, AMC's Chief Financial Officer. Jackson. Thank you, Heinz.

speaker
Jackson Dunkel
Chief Financial Officer

I'll be referring to the fourth quarter 2023 investor presentation, which was posted today on our website. Starting on page 3, I'd like to underscore Dr. Schimmelbusch's opening comments. Both EBITDA and operating cash flow were at all-time highs, leading to a positive free cash flow in 2023. The free cash flow chart on the bottom right also highlights the fundamental strength of our balance sheet. The Zanesville expansion was paid for with a 30-year, 5% municipal bond. As a result, in 2021, 22, and 23, we financed SP1 Plus and Bitterfeld expansions with operating cash flows. Because of our strong performance and careful financing decisions, our unrestricted cash balance today is unchanged from the second quarter of 2021 when we issued $120 million of shares. This places AMG in a very good position as we enter into a lower-priced environment. More specifically, in terms of our 2023 performance, we funded $170 million of capital expenditures 30 million of dividends, the purchase of a 25% stake, plus a $15 million reduction in debt, and kept our cash balance the same as year-end 22. Going back a bit further in history, I'd also like to point out that the $700 million of EBITDA and the $400 million of operating cash flow we've generated over the past two years is mainly due to the $75 million investment we made in Brazil in 2018. This investment decision to enter a new market and produce lithium concentrate was further complemented by excellent execution. We've been producing at full plant capacity for multiple years at an industry-low cost per ton. I'd also like to comment on the 23 achievement of the $350 million in EBTA versus our November guidance that we would be above $320 million. The difference is due to three items. is a $10 million dividend we received from one of our minority investments. The second is a change in the US tax law under the Inflation Reduction Act, which added $6 million to 2023's EVDA. And the third is due to shipping schedule variances in lithium concentrate. On the last point, we had a number of lithium concentrate shipments scheduled for the last week of the year, and not only did they all arrive, some that were scheduled in January arrived early. Given the size of these shipments, This accounted for 14 million higher EBITDA in Q4 than we are anticipating. Turning now to page four of the presentation, on the top left, you can see that revenue for the quarter decreased by 6% to $367 million. Q4 23 adjusted EBITDA was $71 million compared to 104 million in the same period last year. As Dr. Shimabushi mentioned, this decrease was primarily driven by the global decline in metals prices within our portfolio. predominantly the lithium price, which saw declines of over 70 percent compared to average Q4 22 pricing. Net income attributable to shareholders for Q3 23 declined $59 million quarter over quarter. This decline is partially due to a non-recurring sale of an existing energy supply contract in our silicon business that benefited the fourth quarter of 22. As I will detail later, This quarter's lower net income figure is also due to higher income tax expense, a lithium inventory cost adjustment, and a number of restructuring activities we took in Q4 23, all of which are in addition to the aforementioned fall in prices compared to Q4 22. Now I'll review the three segments and start with AMG clean energy materials, which is shown on page five of the presentation. On the top left, you can see that Q423 revenues decreased 10% versus Q422 to $158 million. This is driven mainly by decreased prices in both lithium carbonate and ferrovanadium, but was partially offset by higher volumes in lithium concentrate and ferrovanadium versus Q422. Q423 gross profit was 57% lower than Q422, due mainly to lower prices, but also due to an inventory cost adjustment at our lithium revenues. at our German lithium hydroxide business. The business started buying raw materials in anticipation of commissioning, and this material was written down to current prices at year end. As we've done in the past, this adjustment was excluded from EBTA. Q4 23 adjusted EBTA decreased $56 million to $56 million from $80 million in the fourth quarter of 22 due to the decline in metal prices, primarily the lithium price. Full year 2023 adjusted EBITDA was 15% higher than in 2022, though driven largely by higher average lithium concentrate prices in 23 versus 22, as well as by higher production volumes due to strong operations in lithium and vanadium. We also received a $10 million dividend from an equity investment, which is included in adjusted EBITDA. And finally, the quarterly capex shown on the bottom left of $35 million mainly reflects our investment into a battery-grade lithium hydroxide plant in Bitterfeld, Germany, as well as the expansion of our lithium concentrate capacity in Brazil. Turning now to page six of our presentation, which shows critical minerals. AMG critical minerals revenue for the quarter decreased 21 percent to $55 million compared to Q4-22. due to lower volumes largely driven by the silicon metal plant operating one furnace during the quarter. Q423 gross profit was sequentially lower than Q323 due to an asset impairment and restructuring charge at our graphite business, totaling together $8 million. Q423 adjusted EBITDA decreased 88% compared to Q422 to $2 million, largely driven by the shutdown of the silicon metal plant which benefited in Q4-22 from the sale of low-cost energy contracts. As noted in prior quarters, the lower volumes in antimony and graphite were caused by a slowdown in their end-use markets, primarily in the housing, industrial, and automotive markets. In terms of silicon, we currently plan to run two furnaces for the remainder of this year. Moving on to AMG critical materials technologies on page seven, starting on the top left, you can see that Q423 revenue increased by $10 million or 7% versus Q422. This improvement was driven by strong revenues in our engineering unit, as well as higher sales volumes of chrome metal and higher sales prices of titanium alloys partially offset by lower chrome metal pricing. Q423 gross profit was impacted by a restructuring and acid impairment charge at our titanium business, which together totaled $4 million. Adjusted EBITDA was $14 million during the quarter compared to $10 million in Q4-22. This increase was primarily due to higher profitability in our engineering and titanium businesses, partially offset by lower chrome margins driven by the continued sequential decline in chrome price in the current quarter. Turning now to page 8 of the presentation, on the top left you can see that AMG's Q4-23 SG&A expenses were $46 million versus $37 million in Q4-22. The variance was attributable to increased hiring at our German lithium business, at AMG Leva, and at AMG Engineering due to the increased order backlog. AMG's net finance income in Q4-23 was $2 million compared to $4 million in Q4-22. The decrease in income was mainly driven by lower capitalization of interest expense now that the Zanesil plant is fully operational. In today's raising right investment, rising rate environment, AMG continues to benefit from its low cost fixed rate debt facilities and has an average interest rate charge across its two main debt instruments of 5%. AMG recorded an income tax expense of $95 million in 2023 compared to 84 million in 22. This variance was mainly driven by negative movements in the Brazilian RAI last year compared to 22. but also driven by non-cash deferred tax expenses related to the derecognition of certain tax assets that were associated with interest expense carry-forwards in our U.S. business as well as loss carry-forwards in our German business. AMG paid taxes of $103 million in 2023 compared to tax payments of $42 million in 2022. This higher payment in 23 was due mainly to the timing lag related to Brazil's strong performance in late 22 through Q2 23. Turning to page 9 of the presentation, you can see on the top left that cash from operating activities was $45 million in Q4 23 compared to $57 million in the same period in 22 due to lower profitability in the current quarter offset by strong operating cash flows from our silicon and critical materials technologies businesses. AMG's annualized return on capital employed for 23 was 26.3% compared to 30.8% achieved in 22. AMG ended the quarter with $323 million of net debt, a reduction of $7 million from 2022. Excluding the municipal bond due in 2047, our balance sheet would reflect zero net debt. As of December 31st, 2023, the company had $345 million in cash equivalents, and total liquidity of $540 million. As mentioned before, AMG has no interest rate risk since our debt portfolio is fixed at 5%, at least until 2026. Our strong liquidity supports the current level of capital expenditures, and AMG management remains committed to maintaining a net debt to adjusted EBITDA ratio of below 2.5 times. And finally, we've included the 2023 results by quarter under our new segmentation in the press release. We've also put the 2022 figures on our website so that you can compare the two years. That concludes my remarks. Eric?

speaker
Eric Jackson
Chief Operating Officer

Thank you, Jackson. The unprecedented fall in lithium and vanadium prices resulted in substantially lower gross margins in the fourth quarter of 23. Additionally, although we aggressively manage inventories, These falling prices compressed margins on existing inventories as they worked their way through to sales and revenue recognition. It should also be noted, however, that our number of days in inventory compares very favorably to all of our relevant competitors and peers. I also want to note that many of our competitors are reporting significant losses in this depressed market, while all of our major products continued to be profitable even at these lower prices. Our ongoing cost reduction and efficiency programs, which we initiated about nine months ago, will reduce our headcount by approximately 200 full-time employees, but will ultimately be offset by the hiring associated with the ramp up of our expansions in Germany and Brazil, as well as the growth in our engineering business in LIVA. Therefore, we expect overall staffing in 2024 to be approximately unchanged from 2023. The spent catalyst processing facility in Zanesville exceeded our target production volumes in the fourth quarter of 2024. Production from both the roasting operation and the melt shop exceeded historical averages achieved by our Cambridge, Ohio operation and is producing today at higher levels than Cambridge. AMG Vanadium qualifies for Section 45X of the U.S. Inflation Reduction Act, which provides a production credit for domestic manufacturing of critical materials. Based on preliminary regulations as issued by the IRS, we expect to receive a subsidy of approximately $6 million for full year 2023 and similar amounts ongoing. Our Brazil lithium operation delivered 30,000 metric tons of lithium concentrate in the fourth quarter of 2023. The average realized sales price was $1,943 per ton SIF China, and the average cost per ton SIF China was $498. On a full year basis, we produced at full capacity and delivered 95,000 metric tons of lithium concentrate. at an average realized sales price of $3,160 per tonne SIF China, an increase from the prior year. The average cost per tonne for 2023 was $475 per tonne SIF China. In Brazil, our lithium concentrate plant will temporarily shut down for the changeover period to facilitate the expansion from 90,000 tonnes to 130,000 tonnes. We expect to produce approximately 93,000 tons for the full year of 2024 and will operate at full expanded capacity during the fourth quarter of 2024. In 2024, we anticipate the cost per ton of production will rise somewhat due to unabsorbed costs during the ramp-up period, as well as lower relative tantalum sales prices and volumes offsetting spodumene production. We believe net of co-product credits. We are and will continue to be at or near the bottom of the global lithium concentrate cost curve. AMG Lithium's battery grade lithium hydroxide refinery in Germany is in advanced stages of commissioning for the first 20,000 ton module. The qualification process is is planned to start with our customers in the third quarter of 2024. Our global vanadium team in Ohio and Germany has developed, engineered, and installed process technology at AMG Titanium in Nuremberg to produce vanadium oxides from roasted spent catalysts. This process technology further diversifies our ability to accept a variety of vanadium-bearing materials to support our vanadium electrolyte expansion. The process is commissioned and processing material from our existing spent catalyst sources. The vanadium electrolyte plant is under construction. The facility will process vanadium oxides into vanadium electrolyte. The target capacity is 6,000 cubic meters of vanadium electrolyte, the equivalent of approximately 100 megawatt hours. which will serve the electrical storage market as a vertical integration into our LEVA batteries. We expect to reach nameplate capacity by the second half of this year. AMG Silicon operated one of four furnaces in the fourth quarter and will operate two furnaces from March 24th through the year end. We expect this operation to be solidly cash flow positive for the year. In terms of our critical materials technology segment, AMG Engineering signed a record high of $350 million in new orders in 2023. This order intake level was driven by strong orders, as mentioned by Heinz, of remelting and heat treatment furnaces, representing a 1.27 book-to-bill ratio. We had an order backlog of $295 million as of the end of the year. We continue to see improvement in the end markets of our aerospace-related products, specifically titanium aluminides and titanium master alloys. Our overriding objective continues to be the lowest cost, highest quality, most environmentally responsible producer of our products, ensuring strong cash flow and profitability even at these cyclical low prices. I would now like to pass the floor to Dr. Shima Bush, AMG's Chief Executive Officer.

speaker
Dr. Hein Schimmelbusch
Chairman of the Management Board and Chief Executive Officer

Thank you, Eric. AMG's two main lithium expansion projects are heading towards completion. Our lithium concentrate expansion project from 90,000 tons to 130,000 tons in Brazil and Module 1 of our lithium hydroxide refinery in Germany. We are reviewing our resource development project and all other expansion activities in light of the present market conditions. Regarding 24, from the lithium concentrate and lithium carbonate market price highs in November 22 of 6,100 per ton and of 84,000 per ton, prices have each declined by about 84%. On November 8, we indicated an adjusted EBITDA for 24 of approximately $200 million, excluding any profitability for Bitterfeld's lithium hydroxide refinery and utilizing contemporary pricing. Since then, market prices for spodumene and lithium carbonate have declined 50% and 39% respectively. Utilizing today's price levels, lithium profitability will be $60 million lower and vanadium profitability will be $10 million lower. Therefore, AMGs24 adjusted EVD will be approximately $130 million at present price levels. Our analysis of the long-term supply and demand trends in lithium gives us confidence that the present low prices are unsustainable. Operator, we would now like to open the line for questions.

speaker
Operator
Conference Operator

At this time, if you would like to ask a question, please press the star and 1 on your telephone keypad. You may remove yourself from the queue at any time by pressing star 2. Once again, that is star and 1 to ask a question. We will pause for a moment to allow questions to queue. We will take our first question from Sten De Meester of AMG.

speaker
Sten De Meester
Analyst

Yes. Good afternoon, and thanks for taking my questions. I have a couple, and we'll ask them one by one if that's okay. The first one is on the CAPEX guidance of 125,024. If I'm right, the previous guidance was 175 to 200 million. So what explains this lower number? Are you now excluding spending on the technical grade facility in Brazil this year? Correct. Or are there other elements?

speaker
Jackson Dunkel
Chief Financial Officer

No, you got it. It excludes the technical grade plant.

speaker
Sten De Meester
Analyst

Okay. And in light of that, I'm intrigued by the statement that you put in the press release and also was repeated by Dr. Simon Busch just now, that you are reviewing the resource development projects and all other expansion activities in light of the present market conditions. Could you elaborate what this could lead to? Are you effectively putting the lithium strategy into question given recent events in the market?

speaker
Dr. Hein Schimmelbusch
Chairman of the Management Board and Chief Executive Officer

No, the lithium strategy is unchanged. In particular, as regards to the lithium project in Brazil, the lithium chemical plant, the lithium chemical plant in Brazil has a full-fledged feasibility study definition, FEL3, but we have changed the site from MIBRA to a site at a harbor in Brazil for several reasons. It is risk management reasons. We want to have that plant able to receive supplies of spodumene in addition to spodumene from our mine in Mibra, from other sources in Brazil. And that is a critical risk reduction move. And therefore, the feasibility work has to be amended as each of that, of course, an EFEL3 feasibility study is highly dependent on the site. That site also has advantages as regard it is located at the tax-free zone. which enables the site to receive equipment from overseas without import taxes. So that major project is unchanged except that we are amending this due to this site change. The other projects are essentially unchanged except that we have increased our scrutinizing analysis on the question of low cost. Our benchmark is our own low cost production in Brazil and we do not want to dilute that. So each of the resource projects we are working on is being reviewed whether it meet that standard another time. We have reviewed that before, but now we are pinpointing this to this benchmark and are sort of more selective than we have been before.

speaker
Sten De Meester
Analyst

And does that have implications for Zinwalt and Lagoa?

speaker
Dr. Hein Schimmelbusch
Chairman of the Management Board and Chief Executive Officer

That is not an indication for a specific project. It's just a general principle. But while you are mentioning Lagoa, Lagoa, we are in a drilling program, indicating the fact that this is a staged development. As regards to Sindwald, we are confident that Sindwald is meeting the standards which we have just outlined. However, it's a complex project and we will announce things happening there by listening to the announcement of Synvoid PLC in London.

speaker
Sten De Meester
Analyst

Okay, understood. Another question I have is on the On the phrasing of the guidance for the refinery, at Q3 you were more detailed or more specific with regards to the 7,000 tons of battery-grade lithium that you are expecting to produce in 24. You don't repeat that statement. I also noticed that the qualification process has shifted from Q2 to 3Q to the third quarter now. So does that imply that you're no longer banking to produce these 7,000 tons of volumes, even though they were not included in the climate?

speaker
Eric Jackson
Chief Operating Officer

I think there's a good probability that we will produce close to 7,000 tons. The qualification process is not fully under our control. It's really three steps. We match and agree specifications with individual customers. We send them lab samples from different batches, and we have completed that with all of our customers. But then we need to reach stable commercial scale production and send them large, between nine and 20 ton shipments that they run through their process, their cathode material production, and then it goes through the cell manufacturer. So we're very confident of the project and generally very much on schedule, but it's a long process in reaching the end customer.

speaker
Sten De Meester
Analyst

Yeah, that is understood. Final one for me before I go back into the queue is on the IRA subsidy. The $6 million, am I assuming right that this is tied to the vanadium production, since that is the U.S. production of critical materials? Correct. Okay, understood. And then should we see this as a one-off, or do you think this will be a recurring subsidy as long as the production?

speaker
Jackson Dunkel
Chief Financial Officer

Yeah, a couple of notes on that. One, it does not have a termination point for critical materials, so it is evergreen. It will occur forever unless, and it's based on an act of Congress, so it would require a new law from Congress to cancel it. And it's important to note that it obviously improves our total cost position because it's effectively a reduction of our cost of goods sold in Faribault, Indiana.

speaker
Sten De Meester
Analyst

And is the $6 million then, because you mentioned in the press release that it's an approximation, is that tied to the full production of vanadium or could it even be higher than the $6 million run rate?

speaker
Jackson Dunkel
Chief Financial Officer

No, look, the regulations say that they want to give a tax credit for 10% of the production cost of a plant. But then... they went through a series of exemptions. And so the $6 million is the most conservative interpretation of those exemptions, and we are discussing with the IRS the other exemptions, which may cause it to go up, but that's the uncertainty. It's not an uncertainty of production. It's simply an uncertainty of how the law will be enacted with the IRS.

speaker
Sten De Meester
Analyst

Okay. Okay, thanks. That's helpful. That's it for me for now.

speaker
Operator
Conference Operator

We will take our next question from Richard Hatch with Barenburg.

speaker
Richard Hatch
Analyst at Berenberg

Thanks very much for the call. So just to 100% clarify on that, you're guiding us to put in a 6 million per annum subsidy into our models for vanadium sort of into perpetuity at this point. Is that correct? Correct. Cool. Okay. And then just to clarify again, just on the precursor plant, If that's the delta on the capex versus previous guidance, when should we start modeling in the spend? Does it slip into 2025?

speaker
Jackson Dunkel
Chief Financial Officer

For the technical grade Brazil plant?

speaker
Richard Hatch
Analyst at Berenberg

Yes. Yeah, I think that's... Okay, understood. And then the acquisitions that you've announced, sort of you announced them previously, are Just to clarify, do we need to start – what kind of cash impact, if any, do we need to put into our numbers for 2024? Immaterial.

speaker
Jackson Dunkel
Chief Financial Officer

Pretty much immaterial, yeah.

speaker
Richard Hatch
Analyst at Berenberg

Immaterial. Okay, cool. And then just the dividend that you received on EBITDA, which gave you that nice $10 million bump, is that – how should we think about that? Is that something that creeps in at some point, or is that more of a one-off thing?

speaker
Jackson Dunkel
Chief Financial Officer

That was a one-off. That was a one-off. It is cash, however.

speaker
Richard Hatch
Analyst at Berenberg

Okay. And that's received now, right? Yeah, correct. Okay, cool. And then, sorry, I've just got a couple more smalls. Just on the... You know you mentioned about the benefit of the inventory that slipped into Q4, which basically has helped your costs and therefore... you know, created a bit of a benefit there. Is there a back, is there like a rollback of that? Does that, is there a negative impact of that into Q1?

speaker
Jackson Dunkel
Chief Financial Officer

Sorry, which, which business unit?

speaker
Richard Hatch
Analyst at Berenberg

It was, it was, sorry, it was clean energy materials. Just the, you know, you mentioned the 50, was it 15 million, 14 million?

speaker
Jackson Dunkel
Chief Financial Officer

Oh, the $15 million inventory cost adjustment?

speaker
Richard Hatch
Analyst at Berenberg

Yeah, yeah, yeah.

speaker
Eric Jackson
Chief Operating Officer

The $15 million inventory cost you're referring to, I think you're referring to the additional shipment in the fourth quarter.

speaker
Richard Hatch
Analyst at Berenberg

Is that what you're referring to? So that's purely top line. There's nothing to do with costs.

speaker
Eric Jackson
Chief Operating Officer

No costs.

speaker
Jackson Dunkel
Chief Financial Officer

Yeah, that's purely lithium concentrate shipments from Brazil, while the lower cost of market or the inventory cost adjustment was related to battery grade or technical grade lithium hydroxide in Germany, two different products.

speaker
Richard Hatch
Analyst at Berenberg

Okay, cool. And does that cause any kind of impact into Q124 in terms of accounting, like that cost rollback or not? No. Okay, cool. And the last one is just on the working cap. I think there was about a $30 million release in Q4 from what I can see versus Q3 to Q4, which took you to about $60 million. I guess, is that an element of those shipments slipping into Q4? Is there any build that you'd steer us to for 24? Or is it 24 expected to be neutral? Thanks.

speaker
Jackson Dunkel
Chief Financial Officer

No, it's expected to be neutral. I mean, if you look at our days on hand for inventory, they went from 100 to 91. So that's a clear release of that's just good working capital management. And we would expect that we wouldn't We wouldn't expect to see another draw. Yeah, okay, helpful. Thank you very much.

speaker
Operator
Conference Operator

We will take our next question from Martin Dindriver with Abnamro.

speaker
Martin Dindriver
Analyst at ABN AMRO

Yes, good afternoon, gentlemen. Thank you for taking my questions. I have two. With regards to reviewing the capacity projects, expansion projects and development projects, you've basically said that everything, perhaps with a slightly different timeframe, is moving along. still in the planning. Are you going to update the markets about your longer-term EBITDA ambition in five years or less at your AGM, or is that something that is not in the planning today?

speaker
Dr. Hein Schimmelbusch
Chairman of the Management Board and Chief Executive Officer

No, we do that routinely, and nothing has changed with that routine. Okay.

speaker
Martin Dindriver
Analyst at ABN AMRO

So is that then, should I then also see it that you will update the market on that 650 that was the previous targets?

speaker
Dr. Hein Schimmelbusch
Chairman of the Management Board and Chief Executive Officer

Or are you now saying that... We normally do that in the context of the general annual meeting. You're correct. All right.

speaker
Martin Dindriver
Analyst at ABN AMRO

Got it. And my second question relates to specifically Vanadium. You've now split it out in the new reporting structure. Vanadium Q4 EBITDA 29.5. Would it be just as simple to take that 6 million out to get to some sort of an underlying EBITDA? And if that is true, if that is correct, is that a run rate that we can use going forward, apart from the price effect of Ferrum Canadian? Because you've also said that Q4 would be impacted still by some inventory revaluation on the Middle Eastern spend catalyst. That would be helpful to understand the profitability there.

speaker
Jackson Dunkel
Chief Financial Officer

Well, let's first talk about what's in AMG Vanadium, right, because it includes chrome and titanium, right? So you have other business units in there. Both chrome and titanium should benefit from an aerospace upturn in 24. So, you know, and taking the six out – you know, yeah, that's fine for a go forward, but recognize that the six has to, oh, sorry, I'll get to that. Recognize that the six has to be blended in then every quarter, right? Because it's ongoing, right? And then finally, don't forget there's a $10 million GAM dividend in that $29 million number.

speaker
Martin Dindriver
Analyst at ABN AMRO

Oh, that's included in that number as well. Okay, got it. Yeah, no, all my other questions have been answered. Thank you. You're welcome.

speaker
Operator
Conference Operator

It appears that we have no further questions at this time.

speaker
Dr. Hein Schimmelbusch
Chairman of the Management Board and Chief Executive Officer

Michelle?

speaker
Operator
Conference Operator

This does conclude today's program. Thank you for your participation. You may disconnect at any time.

speaker
Eric Jackson
Chief Operating Officer

Thank you.

speaker
Michelle Fisher
Senior Vice President of Communications

Thank you.

Disclaimer

This conference call transcript was computer generated and almost certianly contains errors. This transcript is provided for information purposes only.EarningsCall, LLC makes no representation about the accuracy of the aforementioned transcript, and you are cautioned not to place undue reliance on the information provided by the transcript.

-

-