7/30/2020

speaker
Thorsten
Conference Call Moderator

Thank you, Kai. Good morning, ladies and gentlemen. This is the Airbus H1 2020 results release conference call. Guillaume Fauré, our CEO, and Dominique Asam, our CFO, will be presenting our results and answering your questions. This call is planned to last around one hour and 15 minutes. This includes Q&A, which we'll conduct after the initial presentation. This call is also webcast. It can be accessed via our homepage, where we have set a special banner. Playback of this call will be accessible on the website, but there is no dedicated phone replay service. The supporting information package was emailed to you earlier this morning. It includes the slides, which we will now take you through, as well as the financial statements. Throughout this call, we will be making forward-looking statements. The package you receive contains the safe harbor statement, which applies to this call as well. Please read it carefully.

speaker
Guillaume Fauré
CEO

Now, over to Guillaume. Thank you, Thorsten, and good morning, everyone. Welcome to our H1 2020 results, and thank you for joining today. As you're aware, COVID-19 triggered an unexpected and unprecedented situation for the aerospace industry, and its scale required us to promptly deploy an adaptation plan to adjust our business to the new commercial aircraft environment. The latest view on commercial aircraft business is consistent with the commercial aircraft rate set by Airbus in April. We may still make minor adjustments, but we have growing clarity for the short term, I mean 2020 and 2021. And from today's perspective, we believe that we have defined the right calibration point that fits with the new environment or the understanding we have today of this new environment. Our industrial system, including our whole supply chain, has adjusted to the new levels and we are producing in accordance with the new production plan. This makes me confident that we are capable to further adapt in case the situation evolves. Actually, we launched a wide range of cash containment measures. We adjusted our incoming supply to manage our working capital. We deployed the available partial unemployment schemes to flex our workforce. We reviewed our R&D roadmap and other fixed costs and cut 2020 capex while still protecting key projects like the F321 XLR or DDMS project, the ones that are key to prepare the future. We're also addressing our long-term cost structure. We have announced plans to adapt our global workforce and resize our commercial aircraft activity. This adaptation is expected to result in a reduction of around 15,000 active workforce positions no later than summer next year, summer 2021. We're working with our social partners in order to limit the social impact in this bigger picture of huge impact on economies. We will rely on the full set of measures available, made available, while retaining our skills, competencies, and know-how as much as possible so we can be ready to meet our customer demand when the market recovers, because we believe it will recover. Our H1 financials reflect COVID-19 impacts coming through in the second quarter, mitigated by our adaptation measures. In Q2, We delivered 74 aircraft, slightly ahead of my expectation when entering into the crisis, end of Q1. Our H1 EBIT adjusted was at minus €0.9 billion, driven by commercial aircraft deliveries, which were 193 aircraft lower year on year, so roughly half of what it was in the first half of 2019. EBIT adjusted also includes a 0.9 billion euro COVID-19 related charges, which are not shown as adjustments. Free cash flow before M&A and customer financing is at 12.4 billion, of which minus 4.4 billion euro in Q2. Minus 4.4 billion euro free cash flow before M&A and customer financing in Q2. Our Q1 free cash flow excluding the fine under the deferred prosecution agreement was also at minus 4.4 billion euros, which demonstrates that in spite of only 74 deliveries in Q2, demonstrates that the measures we have launched to contain cash, including the adjustment of incoming supply, have already delivered results in Q2. They are partially compensated for the lower cash flow from the low number of deliveries in the quarter, the 74 I was mentioning before. The strong liquidity position we have built will support us in our ongoing efforts. It will also enable us to act in case new challenges are to come. And we are preserving our ability to invest, innovate, grow, and perform again after the crisis to ensure we can return to normal operations in a strong position once the situation improves again. Before we look at our commercial aircraft environments, let me come back to the WTO disputes. We recently agreed with the governments of France and Spain to make amendments to the F-350 RLI, the repayable launch investment contracts, to reflect what the WTO considers the appropriate interest rates and risk assessment benchmarks. With this final move, Airbus considers itself in complete compliance with all WTO rulings, with no doubt. From my perspective, this removes any justification for U.S. tariffs moving forward. Now, to our commercial aircraft environment in more details, the latest World Economic Outlook projects global GDP growth at minus 4.5, so close to minus 5 percent, sorry, at minus 4.9%, so close to minus 5% in 2020. Latest IATA figures show that the RPK in June were at 13.5% versus last year. Domestic travel was at about 32% with China on the recovery reaching about 65% and international air traffic was about 3% versus June 2019. which was a very low level we've been in. Airlines remain in a difficult situation, and there are as many situations as there are customers, very large diversity of situations. They have been reviewing their fleet planning, and we've been working closely with them to find mutually acceptable agreements and to align on a new delivery profile, airline by airline, that gives visibility to the customers and to us by defining a new way forward. Our assessment is that air traffic would reach its 2019 level again somewhere between 2023 to 2025. The single-line market is expected to lead the recovery while we believe wide body should take longer. The current market situation has led us to slightly adjust A350 rates from six to five per month for now. For my discussions with customers, and there are many, It appears that they're flying our products more than others during the crisis, and they tell me that we have the right product line for the post-COVID-19 world. Finally, I'd like to thank our ECAs, including EDC, for their continuous support, and we expect ECA financing to increase. Now looking at H1 orders. In H1, we booked 365 gross orders, largely driven by leasing companies. In Q2, despite being the worst quarter in the history of aviation, our net orders were roughly stable with actually plus eight aircraft. Net orders stand at 298 aircraft, so close to 300 aircraft as of H1. And our backlog remains high at 7,584 aircrafts. We recorded 67 cancellations, of which only one in the second quarter. Looking at helicopters, in H-120, we booked 75 net orders versus 123 in H-119. This included in Q2 some good orders, three five-bladed H-145, the product that's been certified in June. It's a new, very powerful product. We booked one Super Puma and four H-135 for Japan National Police Agency in Q2 as well, and one H-160 in the corporate version, the 160. has been certified as well recently, so we certified two very important products for the future of Airbus helicopters just recently. When it comes to the market, we expect the civil and parapublic segment to remain soft in 2020, particularly in oil and gas, to persist in lower oil prices and pressure on the segment. The support plan announced by the French government in June includes the following future order commitments. Eight H-225M for the French Air Force, then H-160 for Gendarmerie Nationale, and two H-145 for Security Civile, and as well, the second demonstrator of the military drone that we developed for the French Navy. Finally, in defense and space, we had an order intake of 5.6 billion euros. It's 32% more versus last year. And this is including the contract for the development, supply, and integration of 115 Eurofighter E-Scan Raiders for the German and Spanish Eurofighter fleets. As well, the contract to upgrade the training capabilities of the German Eurofighter pilots and the contract renewal to support the A400M French Air Force Training Center in Orléans. We continue to see opportunities in the field of defense with our European governments, Europe feels the need to prepare for the sovereignty of the future, which includes the air and space power, to protect its territory from the skies, and Airbus will play a major role in that, given our European presence and scale, and our technologies and products. Now, Dominique will take you through our H1 financials. Dominique, the floor is yours.

speaker
Dominique Asam
CFO

Thank you, Guillaume, and good morning, ladies and gentlemen. I hope you're well and remain safe. The H1 financials clearly show the impact directly linked to COVID-19. Revenues decreased to 18.9 billion euros, down 39% year-on-year, driven by the difficult market environment impacting our commercial aircraft business, as we delivered about 50% less aircraft year-on-year, partially offset by the appreciation of the US dollar. Our H1 EBIT adjusted was minus €0.9 billion, reflecting the lower deliveries in commercial aircraft and some idle costs. We've taken the necessary steps to adapt our cost structure to the new levels of production, and the benefits are materializing as we execute our plan. H1 EBIT adjusted also reflects charges recorded due to the impairments and write-offs following a comprehensive review of the balance sheet triggered by COVID-19. Our H1 earnings per share adjusted stand at a loss of 1 euro 1 cent per share, using an average of 783 million shares. Our H1 free cash flow before M&A and customer financing was minus 12.4 billion euros, of which minus 4.4 billion in Q2. As Guillaume mentioned, our Q2 free cash flow reflects the lower cash flow resulting from the unusually low number of deliveries, partially compensated by our efforts on cash containment. Going forward, and in the absence of any unforeseen escalation of COVID-19 and new travel restrictions, it is our ambition not to consume cash before M&A and customer financing in the second half of the year. Now, onto the page with more details on our profitability. H1 2020 EBIT reported was minus 1.6 billion euros, The level of EBIT adjustments totaled a negative 614 million and included minus 332 million related to the A380 program cost, of which minus 299 booked in Q2. Minus 165 million impact from foreign exchange and balance sheet revaluation, of which 31 minus 31 in Q2. Minus 117 million of other costs, including compliance costs, of which minus 82 in Q2. Earnings per share reported include minus $429 million of financial results. It mainly reflects a net $212 million negative related to Dassault Aviation, as well as the impairment of a loan to OneWeb recorded in Q1 for an amount of minus $136 million. The tax rate on the core business is around 27%. The effective tax rate on net loss is 3%. impacted by impairments in certain tax jurisdictions and on certain investments. The resulting net loss is minus 1,919,000,000. Loss per share reported was minus 2.45 euros. In the context of COVID-19, we are progressing in the discussions with our social partners. A restructuring provision is expected to be recognized once necessary conditions are fulfilled. The amount is expected to be between 1.2 and 1.6 billion euros. Now on to our hedging activities. Our total hedging portfolio in U.S. dollars stands at 87.8 billion dollars with an average hedge rate of 1.23. In H1 2020, we implemented 2.4 billion of forwards, of which 2.1 billion in Q1. Seven billion dollars of hedges matured at a rate of 1.18 in H1 with associated EBIT impact and another 2.9 billion of Q2 hedges will be rolled in Q3. In addition, 1.8 billion dollars of hedges have been disqualified in H1 with maturity dates mainly from 2022 and beyond, resulting in a negative impact to financial results of approximately 0.1 billion euros. In the second quarter, we rolled 3.3 billion dollars of hedges mainly from Q2 to Q4 of 2020. In order to adjust our portfolio to the new delivery profile, we have been rolling existing hedges to deferred delivery dates while containing the short-term impact on cash also in July. Now let's look at our cash evolution in the first half of 2020. Our gross cash flow from operations of €0.3 billion mainly reflects our EBIT adjusted. We paid the 3.6 billion penalty in Q1 2020. Our working capital, excluding penalties, has increased by 8.3 billion euros, mainly driven by inventory bills and a decrease in trade liabilities. This reflects lower incoming supply and working progress in Q2, while we increased the number of stored aircraft as we were moving to the new production rates. Our inventory, as of the end of June, includes around 145 aircraft that we could not deliver. We target production and deliveries to converge in Q3. PDPs are benefiting from positive phasing impacts. A400M continued to weigh on our free cash flow before M&A, but less so than in 2019. At around €0.9 billion, capital expenditures were stable versus H1 2019. On a full year basis, we still expect capex to be around €1.9 billion. Free cash flow reported was minus 12.9 billion euros. Customer financing actually contributed approximately 67 million positive, while M&A activities accounted for half a billion negative, mainly related to the acquisition of Bombardier's remaining stake in ACLP for about half a billion dollars. Now, let's look at our liquidity as of the end of June. As a reminder, Early in March, we secured sustainable access to funding sources mainly through a 15 billion credit facility. We've also taken additional steps to improve the long-term visibility of our financing and issued euro-denominated bonds with cash proceeds accounted for in Q2. In April, we issued 2.5 billion of bonds with tenors of 5, 8, and 12 years, partially terming out the 15 billion credit facility to 12.5 billion at attractive rates. In June, we issued another 3.5 billion of bonds with tenors of 6, 10, and 20 years. We used part of the proceeds to further reduce the credit facility, which as a result amounted to 9.5 billion as of the end of June. Also, we continued securing additional funding sources by increasing the size of the commercial paper programs in Q2. So all in all, we further improved the robustness of our financing and extended the maturities of our funding sources. The strong liquidity will support us as we continue navigating the crisis and position us for growth once the situation improves. Now back to Guillaume.

speaker
Guillaume Fauré
CEO

Thank you, Dominique. It's clear. Now on to commercial aircraft. Overall results. In H1, we delivered 196 aircraft to 57 customers. a decrease of 193 aircraft year on year, so we roughly delivered in H1 half of what we delivered in H1 last year. We have, as said by Dominique, around 145 finished aircraft that we could not deliver, given the situation. Our focus is to deliver aircraft industrially engaged, support stable production output, taking into account airlines' short-term priorities and replacement needs. So where do we stand on each program? Starting with the A220, we delivered 11 aircraft to three customers. The FAL, the final assembly line in Mirabel, is expected to progressively return to pre-COVID levels at rate 4. And the new FAL in Mobile opened in May as planned. On the 320, we delivered 157 aircraft, 157, of which 151 NEOs. And on wide body, we deliver 28 aircraft, of which 23 A350s and five A330s. Now, let's look at the commercial financials in H1. Revenues mainly reflect lower deliveries with the 193 aircraft less year-on-year, of which minus 137 A320 families. EBIT adjusted mainly reflects these lower deliveries and lower cost efficiency, I have to say. It also includes €0.9 billion of COVID-19 related charges, of which €0.1 billion in R&D. Looking at helicopters, in H120, we delivered 104 helicopters in total, compared to 143 in the same period of 2019. Revenues stable reflects lower deliveries, partially compensated by higher services. EBIT adjusted reflects favorable mix, mainly in military, and higher services partially offset by lower deliveries. The five-bladed H-145 great helicopter and the H-160, another great helicopter, have been recently certified by the EASA They're also expected to receive certification from the FAA later this year. Now onto defense and space. Revenues were impacted by lower volume and mix, in particular in space, which is quite impacted by the COVID-19 lockdowns and quarantines, and COVID-19 causing delays in some programs. EBIT adjusted reflects COVID-19 impact, mainly in space, partially offset by cost reduction measures. For the A400M, three aircraft were delivered in H1. In H1, we also achieved the certification for batch six with automatic low-level flight capability and the simultaneous paratrooper dispatch, the famous one. This is a major milestone on the path of achieving A400M full development. The retrofit activities are progressing in close alignment with customers, and we updated our restructuring plan to also reflect the impact of coronavirus pandemic on the defense and space division. So in this context, what are our key priorities? Overall, we believe aviation is and remains a long-term business. And we are convinced and we observe, we hear that we have the right product portfolio. Since Q1, we've made good progress in ensuring the safety, the health, the safety of our employees, adapting our production, and this is something we have completed, and securing liquidity and defining a plan to resize our business. We'll continue to focus on cash in this environment, and in the absence of any significant deviation on the COVID-19 recovery compared to our plans, absent Unforeseen new escalation or new travel restrictions of a major scale, it is our ambition not to consume cash before M&M customer financing in the second half of 2020. But let's not forget that the environment is still uncertain and evolving, and we remain humble in this environment. In Q2, within one quarter, we have adapted our industrial systems to the new environments And we're progressing towards our new financial balance. This will put us in a strong position for when the market recovers, because we think it will recover. It's not a question of if, but only when it will recover. Now we are ready to take your questions. Thank you.

speaker
Operator
Conference Operator

Ladies and gentlemen, we will now begin our question and answer session. Anyone who wishes to ask a question may press the 01 on your touch-tone telephone. If you wish to remove yourself from the question queue, you may press 02. Participants are requested to use only handsets while asking a question. The first question received is from Benjamin Helon of Bank of America. Your line is now open, sir. Please go ahead.

speaker
Benjamin Helon
Analyst, Bank of America

Hi. Good morning, Guillaume, Dominic, and Torsten. Hope you guys are all well. A couple of questions for me. You've given us the stored inventory at the end of the first half of the year of 145 aircraft. Is there any commentary about where you think that would be at the end of the year? And then secondly, on cash flow, you've said that you don't anticipate any cash flow drag in the second half of the year. If we look forward to 2021, do you think that the business could generate positive cash flow at these currently lower levels of production? Thank you.

speaker
Guillaume Fauré
CEO

I take the risk to hand over to you, Demi. Okay. Iben, good to hear from you. And, yes, we are well, and we hope you're well as well.

speaker
Dominique Asam
CFO

Yeah. Okay, thank you. So on the thought inventory, I mean, you've seen us not – have voiced any expectation on deliveries for the second half, and as a consequence, given that we have now put in a new production rate, that also implies that we don't want to kind of raise an expectation on the year-end inventory of finished aircraft. What we did say is that we try to converge deliveries and production in Q3. On the cash flow side, it is indeed the aim. We've set ourselves the objective not to consume cash in the second half of the year before M&A and customer financing. Now, I don't want to speculate on next year, but obviously curbing cash burn is a key priority and making sure that in a new financial balance we are not bleeding cash is a key priority.

speaker
Benjamin Helon
Analyst, Bank of America

Okay, great.

speaker
Operator
Conference Operator

Thank you. And the next question received is from Celine Fornano of UBS. Your line is now open, madam. Please go ahead.

speaker
Celine Fornano
Analyst, UBS

Yes. Good morning, Guillaume, Dominique, and Thurston. Thanks for taking my question, and I hope you're all nice and doing well. My first question would be if you could share, Guillaume, a bit more than some of the headlines where you said that the progress in July is doing well in terms of aircraft deliveries and what's the visibility in August, which used to be a quiet month. How is it going to be this year, which is all a bit different? And then my second question would be regarding the continued investment in digitalization that you're doing for the company. So you keep this investment. It started a year ago at least. When should we expect that fixed costs increase less basically than top line? So should we see these benefiting potentially also margins and cash flow from 21, 22? Thank you.

speaker
Guillaume Fauré
CEO

Thank you, Céline, for your questions. Yes, going well. Opsem at your end. Well, I will not give the July deliveries today, first because we are not at the end of July, and as you know, we like to be back-loaded. Actually, we don't like, but we are used to be back-loaded. Yes, I said we keep humping up, so you could expect that July will be stronger than June. For August, yes, August is always a quieter month. I would have liked 2020 to be different in that perspective, but I think it will not be very different. August will probably be much quieter, not only because of Airbus, because we have organized very differently this year, but also due to customer constraints and probably as well less appetite to travel in this global environment and in this context. But we are on a recovery, and Dominique said it, we converge production and delivery into free. That's the objective we have, and it is an indication that we believe on the right trajectory. Digital, I mean, digital is serving many different objectives. The so-called DDMS program that we keep working on very actively has supported So from very short-term priorities, I supported the ramp-up of the ACF in 2019. We've produced according to our objectives in the last quarter of 2019, which was a good success. That's why we could deliver that many planes in the last month of 2019. We've had a very good production rate on the A320 family, the ACF, in 2019. That's a bit cynical, but it is what it is. And as I told you, I think, as I said already, we are very happy with the performance of the production that we have now, including with the complexity of all the changes we've had to make. So it's a benefit, and I think if we can still deliver claims in these numbers, which are obviously much lower than what we were expecting but still significant given the context, is because we are on track on the production. And digital serves as well the long-term perspective, which is the next generation of planes, the development of the new systems. So it's not targeting short-term savings on R&T or R&D. It's by far more design to design and produce planes for the next generation that will be modern planes and production systems having a much different efficiency when it comes to the overall performance of the program. And saving time. in development and resources. So don't expect on the short term to have signs of savings from this project. It's more an investment that we do in the course of the four to five years to come. But these are investments which are game changing, a bit like what we do on environment technologies or green technologies, which have the potential to really transform what aviation will look like in the next decade.

speaker
Dominique Asam
CFO

Maybe on the fixed cost versus revenue question also, I mean, obviously, we're working currently very, very hard to bring fixed costs down. And honestly, we have currently no intention whatsoever to increase fixed costs in 2021. Thank you.

speaker
Celine Fornano
Analyst, UBS

Thank you, Dominique. Thank you.

speaker
Operator
Conference Operator

And the next question received is from Tristan Sausson of Exxon BNP Paribas. Your line is now open. Please go ahead.

speaker
Tristan Sausson
Analyst, BNP Paribas

Good morning to you all. It's Tristan from Exxon. Thank you for taking my questions. The first one will be a follow-up to Ben's question on the aircraft that are sitting on the balance sheet today, so the 145 you mentioned. Can you comment on the pace of delivery of these aircraft? Basically, I would begin to understand how long you're ready to keep a produced aircraft as part of a negotiation with the with your customer airlines. Are you ready to keep this for a year or two, or should we think about a much shorter period of time? Second question would be, whatever this number is, can you give us an idea of the timing to get to a normalized level of profitability for the A320 aircraft under the new volume environment? So when do you think you will get rid of excess cost? And I don't expect a number, but a timing by which you could get there would be really helpful to us. Thank you.

speaker
Guillaume Fauré
CEO

So thank you for the question. I take the one on the deliveries, and the second one is too difficult for me, so I will give it to Dominique. No, more seriously, yes, 145 planes. It should be the high point. We intend to improve moving forward, and this convergence we were mentioning before aimed at reducing significantly the number of non-delivered aircraft by end of 2020. As Dominique explained before, we don't want to guide on that number. There's too much uncertainty and still a number of airlines with whom we keep adapting the situation to their needs and to their own situation moving forward. But it should go down significantly. How long do they stay? The majority of them stay a few months. But there are cases where we are preparing ourselves for longer period of time where they stay with us. These are a few number of cases of very critical situation with airlines. We have different ways of maintaining the aircraft depending on whether they stay for a short period of time. And there are specific maintenance programs to keep them completely ready to fly and available short term. with other schemes that we are not using, with few exceptions today, to put them on long-term storage. But this is not the situation we're in for the very, very vast majority of airplanes. Those planes, the very vast majority of airplanes, are stored for the moment where they will be delivered. We've reduced production for the majority of customers. We have produced planes, and we will deliver in priority. the planes which have been already produced to those customers. And in many cases, actually now it's the majority of cases, we have agreements with airlines. There is a new delivery flow and it's just spread over more time to cope with their situation. Now, normalized situation on the profit for the A320, Dominique? Yeah.

speaker
Dominique Asam
CFO

I mean, it's clear that if you have such a massive reduction of rates by more than a third, that there is an impact on the profitability because there is a fixed cost base. The big chunk of the 15,000 headcount reduction we are targeting in active workforce, and don't forget there's also temporary workers coming on top of that, will materialize during the course of next year. So next year we'll have still a kind of, we're not having the full year effect of these cost reduction measures yet, so that will be only in 2022. And by then we should have basically mitigated a good chunk of it But don't forget, we also need to preserve our capability to snap back. So we have to find the right balance between really fully tackling the overmanning excess cost from a fixed cost base, but also kind of preserving the option value to snap back if and when the market recovers. So we need also rate increases to come back to the previous levels of profitability. That's very clear.

speaker
Tristan Sausson
Analyst, BNP Paribas

Thank you so much for your answers.

speaker
Operator
Conference Operator

The next question we received is from Andrew Humphrey of Morgan Stanley. Your line is now open. Please go ahead.

speaker
Andrew Humphrey
Analyst, Morgan Stanley

Hello, everyone. Thank you for taking the questions, and I hope you're all keeping well. My first question really is a follow-up on that last point. You clearly had your main competitor earlier this week talking about a long-term production rate increasing significantly. gradually from 31 aircraft a month on the main narrowbody platform. Dominic, you've highlighted that Airbus might need to snap production back more quickly than that. And clearly, you know, depending on when we believe the industry gets back to 2019 traffic levels, that could happen sooner or later. I'd love to kind of get your take on whether the kind of the kind of slight push out that we're seeing on when traffic could get back to that level is more dependent on a more negative view on medium-term demand or whether, frankly, you're also factoring in the length of time that industrially it will take back to get previous production levels. And I guess the second thing I'd ask is just around FX. Dominic, you've highlighted a kind of substantial number of hedges rolled forward towards Q4. I'd like to kind of, could you kind of unpack a little bit more what flexibility you have to roll those forward to 2021 or 2022 in the event that some of those deliveries slip into later periods?

speaker
Guillaume Fauré
CEO

Okay, thank you for the questions. I'll try to address the first one. In early April, we reduced our production rates, I'll take the A320, that's the bulk of it, from 60 a month down to 40 a month. Sort of three to four months later, we are still with 40, and after all the work we have done on the market analysis and the potential recovery, and when it comes, what I call the top-down approach, and the bottom-up work with all our airline customers plane by plane, we think 40 is still the right balance between demand and supply. And we keep it for the second half of 2020 and entering into 2021. The question is, there might be small adjustments around the 40. That's not the big issue. I think the main question is, when we consider ramping up again, when we want to start to be back to higher rates, 50 and then 60 and potentially more, when the market recovers. That's really the work we are doing today to try to anticipate as much and as good as we can the re-ramp up, the snapback that Deming was mentioning before. It will not happen before mid of 2021. it is very likely that it will have happened in 2022 for the single line. And what we're trying to assess as good as we can is when in that window we will start to ramp up again to give to our supply chain the heads up and to be able to order and to enable the supply chain to do the ramp up and not be too late in the ramp up when it comes. So it's trying to find the right balance not to be naive or too optimistic on what's happening with COVID-19, and we think we are not, but as well not to be too pessimistic, or at least to be prepared to take the benefits of the situation when it recovers, and we think it will recover. When we look at the long-term perspectives, when COVID is behind us, we see again a very, very strong market demand, and in some cases, even bigger because there has been this one, two, three, four, five years of drought that we observed with COVID-19. So that's where we are. So I don't know exactly what was said by others, but we are at rate 40 for the 320. It fits with our today's understanding of the market situation. I mean, the relationship between Airbus and our own customers and on a very granular way. It fits with what we believe is the environment for the next 18 months. And we think there will be a point in time where the ramp-up will come again, and it should be around 2022 for the single line.

speaker
Dominique Asam
CFO

Hedging. Yeah, because of the re-phasing of the deliveries, which we are currently discussing with our customers, of course, we have to adjust the hedging portfolio. This has not, to a huge degree, happened in Q2 yet, but will be very much a topic also in Q3. where we really re-phase all these hedges. The good news is on the single aisle, we have a huge backlog, still 6,168 aircraft in backlog. So there's plenty of opportunities to re-phase the hedges onto these deliveries, because you know we are not hedging everything when we get the order, but we gradually basically average in the rates ahead of delivery. On the wide body, it's a little more difficult. The backlog is smaller, not as long in reach. And there are certain customers, which are the usual suspects you heard about, where we had to disqualify. I mentioned $1.8 billion of hedges because the level of certainty on the deliveries is not high enough anymore to qualify for hedge accounting. So still some work to do, but we will find new homes, so to speak, for the hedges, especially on the single aisle, for the lion's share of it.

speaker
Operator
Conference Operator

Okay. Thank you very much. And the next question received is from Douglas Harn of Bernstein. Your line is now open, so please go ahead.

speaker
Douglas Harn
Analyst, Bernstein

Thank you very much. Good morning. In June, you delivered 36 airplanes. And this is the first question, which is about 10 of them were on June 30th. So I'm guessing that the customers did not take physical possession of all those airplanes. And so my first question is, right now, what's necessary to count an airplane as delivered? And does it involve full cash payment at the time? What are the ways you're approaching a delivery now? And then the second question is, when you talk about converging in Q3 between production and deliveries, we frankly haven't found that many airlines that are anxious to take deliveries this year. There are some. What levers are you using to try and get those deliveries to happen, and does this include a greater role in financing?

speaker
Guillaume Fauré
CEO

So, deliveries. There are deliveries. No change compared to before. It's a transfer of title with a full payment of the plane. As Dominique explained, when customers have contractual obligations and are not willing or not capable of taking delivery, we find agreements which come with intermediate payments sometimes. So that's one of the ways we have used to mitigate the lower number of deliveries. Basically, we are negotiating with airlines, looking at the whole relationship, at the short-term, the mid-term, and the long-term. their obligations, our interest to support them, but as well our own constraints. And I have to confess, in the vast majority of cases, this is a difficult discussion, but it's a professional one where we end up with something that makes sense for both parties. And that's the way we are managing. We are not sacrificing the short term against the long term, nor the opposite. And that's why we have a progressive But we believe it's a solid recovery, and this is what we are trying to accomplish. Did I miss part of the question?

speaker
Douglas Harn
Analyst, Bernstein

And are you doing – are you involved in more financing now to facilitate the –

speaker
Dominique Asam
CFO

I mean, as you've seen, actually, our kind of contribution from customer financing, vendor financing has been positive in Q2, but this is not a trend. We have to anticipate there will be more. This is also why we took that definition before M&A and customer financing, but we don't expect a wave here. We are working very, very closely with the export credit agencies, which are extremely helpful at present, and they've also established some schemes with kind of principal repayment moratorium. So this is another. leverage the use to make the delivery as digestible to the customer as possible because, of course, when there is a delivery, they get 85% of the purchase price recovered from the PDPs, and the equity portion is minor, so they can finance more than actually the PDPs.

speaker
Douglas Harn
Analyst, Bernstein

Okay, thank you.

speaker
Operator
Conference Operator

And the next question received is from Carter Copeland of NEOS Research. Your line is now open. Please go ahead.

speaker
Carter Copeland
Analyst, NEOS Research

Hey, good morning, team. Just a couple of questions from me. On the positive side, how is the slowdown in the lower volume impacting your work on the ACF and the challenges that you face there? And then with respect to the convergence between production and deliveries, Just to be a little bit clearer, you know, how long in your current planning process do you envision it will take for full convergence? I mean, just given your comments on 2022 and, you know, potentially going back up, do you think this is, you know, a couple of quarters or a year for that sort of convergence to take place, or is it, you know, longer than that? Thanks very much.

speaker
Guillaume Fauré
CEO

Thank you for the question. So on the ACF, actually the reduction in rates of production and the results of all the work we accomplished in 2019 puts us in a situation where we are no longer in bottlenecks with the ACF. It's no longer the problem. We deliver ACF, head of variants, I mean, anything we agree upon with customers on time, on quality, that's behind us at least as long as we are in the low rates. We are taking benefit of the period of time to also prepare for the re-ramp-up at the end of the low period. So we think it's really behind us. It's very unlikely that we will very much discuss the ACF moving forward. I think we will have difficulties when we will be in the ramp-up again because we've done a big ramp-down, and all the supply chain has done a big ramp-down, and then we would have to ramp-up again, so that's really... very difficult to manage. Roller coaster situation is not an easy one. And this is something we are discussing with our customers and we want to be prepared for that. Now, when it comes to convergence, well, actually, I told you that we ambition to have less planes stored by end of 2020 than what we have by end of H1 2020. So I'm suggesting that we want to have the convergence in H2 2020. or starting the convergence, not the full convergence, but we will reconverge. And when I told you our industrial system is adapted to the new situation and is delivering according to the new production scheme, it means we are now adjusted to what we wanted to achieve for the new environment. And that's behind us. So obviously, we have to deliver the planes that have been stalled. And this is the part of the uncertainty which is ahead of us, which is the what will really happen with the deliveries of planes between now and end of the year. But I have to say, with what we've seen in Q2, when we have managed to find new agreements with airlines, when we have agreed upon new delivery schemes, in the very vast majority of cases, if not all of them, airlines and Airbus have worked according to these new agreements. So would we have this situation in H2? And this is what we are proposing. expecting, then we would be managing this objective to reduce significantly the number of aircraft stored by end of 2020 compared to today.

speaker
Carter Copeland
Analyst, NEOS Research

Great. Thank you for the call, Guillaume.

speaker
Operator
Conference Operator

And the next question received is from Harry Breach of Main First. Your line is now open, so please go ahead.

speaker
Harry Breach
Analyst, Main First

Good morning, Guillaume. Good morning, Dominic and everyone. Thank you for taking my question and Very much hope you're well. Can I ask my couple of questions? Maybe just firstly, maybe a little bit for Dominic. Dominic, PDPs, can you give us any color, any sort of sense of where the PDPs are now, whether the vast majority are back to being paid on schedule at the moment? I think when we last spoke in April, you know, that wasn't the case, but I'm wondering if PDPs are getting made on schedule and if you can clarify, I think, your comments you made earlier on in the call about favorable PDP dynamics in the second quarter just to help us understand a little more. And then maybe my second question, in a way it's a reflection of Tristan's question about getting to normalized levels of profitability. You've spoken in response to Tristan about the pacing of the full-time headcount reduction. But can you give us a feeling, in terms of manufacturing flow, clearly in the second quarter with sanitization, with facility shutdowns, probably with the regular supply of shipments, there was probably, I'm guessing a little bit, but considerable disruption in terms of labor hours to complete aircraft. Can you give us a feeling about the manufacturing flow, whether things are just working through labor hours are normalizing per unit. And then for the component of labor costs that's not your permanent employees, but is your flexible, your in-situ workers, your temporary, how quickly that element of cost comes out and roughly what proportion of the labor cost last year that was? Thank you.

speaker
Dominique Asam
CFO

Okay. On the PDPs, of course, when we entered into the crisis, not all customers were current, and this is, of course, part of the negotiation Guillaume referred to to make sure that we find a new agreement on the skyline. The skyline then entails a certain adjustment of PDPs, and once these negotiations have taken place, similarly to what Guillaume commented on deliveries, also customers tend to honor these new schedules. They are lower than what we had initially anticipated. My comment on the positive phasing on Q2 is that As some customers were not willing to take deliveries, we have been able to negotiate some other forms of anticipation of payments on the delivery, like pro notes or advanced PODs. And that has actually helped us a little bit to stabilize, to offset that negative effect that comes from lower PDPs. So what we anticipate is there will be a big re-phasing. We're in the process of doing that. Then we will have PDPs which are lower because the re-phasing is deferring deliveries to the right. but then that should be more predictable going forward. On the pacing of the headcount reductions and the disruption, yes, there was some cost in Q2, overcost, so to speak, from COVID-19. I would characterize it as a kind of low triple-digit million number, very roughly, which, of course, over the next quarters, by improving our processes, going down the learning curve, we should improve. On the question of how quickly the temps are out, it's something that is, of course, quicker than the active workforce reduction, I'd say, phasing over the second half of this year, and then the lion's share should be done. But we want to keep also some temps in some areas to preserve some flexibility.

speaker
Harry Breach
Analyst, Main First

And, Dominic, so just those alternatives you touched on in PDP, you said pro notes and advanced payments upon delivery. Sorry, I'm a little bit stupid as I as I hope my colleagues will back me up on. What are pro notes, Dominic?

speaker
Dominique Asam
CFO

Well, it's promissory notes. It's basically customer tells you, I can't take delivery now, but I'll take delivery in June. And they give you a note that promises that this payment will be made. And this is a bankable instrument you can get some liquidity for. So this is a very common tool. And the good news is, I mean, we always try to get the money from the customer to really further enhance the skin in the game and to ensure and secure the delivery at a later stage then.

speaker
Harry Breach
Analyst, Main First

That's very helpful. Thank you. Thank you very much.

speaker
Operator
Conference Operator

And the next question we received is from Robert Stellar of Vertical Research. Your line is now open, sir. Please go ahead.

speaker
Robert Stellar
Analyst, Vertical Research

Thanks so much, and good morning. Guillaume, just a quick one for you. On the Chinese market, you highlighted that domestic traffic has staged a pretty big recovery there. As you look to the second half of this year, are your Chinese customers and now planning to take delivery of planes as you roughly expected, say, six months ago. And then the second question, probably for Dominic, is on inventory, not the finished goods inventory, but the sort of buffer inventory you have in the system. I was wondering if you could give us a ballpark number of how much that number might be, and also how long it could take to drive down the buffer inventory.

speaker
Guillaume Fauré
CEO

Thank you. Yes, thank you for your questions, Robert. Well, actually, I think almost no customer is taking delivery like we were expecting six months ago, so we are no longer in pre-COVID situation, but indeed the Chinese airlines will take by far more deliveries in the second half of 2020 than what they did in the first half. And this is consistent with the expectation that their domestic market will keep recovering, that they still have a market that is underserved in terms of number of planes. So they will need, in particular on the single aisle, to keep procuring planes. So we think there will be a recovery. It will not be at the levels of pre-COVID-19, but it should be at quite a high level or a higher level in H2 2020. and a significantly higher level in 2021.

speaker
Dominique Asam
CFO

So on inventories, as I may add, indeed, there is also inventories which are not reduced yet as much as the rate reduction would imply. This is simply due to the fact that we currently run all the lines with longer lead times. It also creates some buffers for suppliers. And I think this will be a key focus item for next year, 2021, to stabilize the cash We have some cash-outs, exceptional cash-outs, like the severance pay we'll need to deliver next year. And then, of course, there's an offset we're trying to achieve with working on these pre-file, pre-finished good inventories to bring them more in line with the rates.

speaker
Robert Stellar
Analyst, Vertical Research

Okay. Thank you very much.

speaker
Operator
Conference Operator

And the next question we received is from Olivier Boucher of CreditSys. Your line is now open, so please go ahead.

speaker
Olivier Boucher
Analyst, CreditSys

Yes, good morning, gentlemen. Thank you for taking my questions. I would have to first of all on your comments, Guillaume, about rates that possibly could go up sometime in the second half or maybe sometime in the second half of 2021. What does it mean for free cash flow and particular working capital for next year? And second comment is on programs that we've not discussed a lot, which are A380s and A320 CEOs. How do they look in terms of deliveries for 2020, 2021? Bonjour, Olivier.

speaker
Guillaume Fauré
CEO

Okay, so on the rates, I say around 2022, potentially starting in the second half of 2021. That's uncertainty. It's beyond what we call the firm horizon, so we have not planned for the moment this ramp-up in our expectations for 2021. We are more at rate 40 flat until we see something new happening. Indeed, it would have some working capital impact when we start to ramp up again, but we have as well conditions of payments, terms of payments with suppliers that are helping in that direction, and we should see symmetrically some PDP inflows ramping up from the customer side. So it's all a lot of moving parts, and maybe, Dominique, you can give a bit more.

speaker
Dominique Asam
CFO

In general, I think the very high-level comment I can give is our business model in terms of PDP schedules is designed in a way to avoid that we absorb working capital in the ramp. And I also mentioned we have very generous inventories as we speak as of now. which would actually put us in a position to ramp if needed, but let's see how we're working on these inventories next year.

speaker
Guillaume Fauré
CEO

The objective is to get rid of the vast majority of inventories, mostly by end of this year, apart next year, and then the ramp-up would have to come when we would be with a low level of inventory. So it's a lot of moving parts, and planning 2021 is obviously not easy. We intend to keep reviewing very dynamically the situation in the last quarter of 2020 to see if and when we plan that ramp-up, if it remains beyond the horizon of 2021, or if we want to start to ramp up again somewhere prudently in 2021. And this applies only on the 320, to be very specific. Now, you asked questions on the 320 COs, I think. Was it the 320 COs, your question?

speaker
Olivier Boucher
Analyst, CreditSys

Yes, it is on the 320 COs.

speaker
Guillaume Fauré
CEO

We are at the end. I think we've communicated with the leaders. It's a very small number of COs. The vast majority was new.

speaker
Dominique Asam
CFO

We have delivered six, I see here, in the first half.

speaker
Guillaume Fauré
CEO

So you can consider we're really now completely and only with NEOs. It's not exactly right, but for every calculation, I think it's right. And on the A380s, I think we still have, what, eight or nine delivered, one for Anna and the rest for Emirates. Obviously, COVID-19 makes the situation a bit more complex, but we still plan to deliver those planes, maybe a bit slower than what was planned before COVID-19, but we are at the end of life of the product. You might have seen in the press we had some sad but nice events on the last section going by road to Toulouse and so on. So it's really now becoming history, unfortunately.

speaker
Thorsten
Conference Call Moderator

Okay, thank you. So this closes our conference call for this time. Please allow me a quick note. Mohamed, who has been joining with us for the last five years, is leaving the team for a new exciting challenge within ABBAS. I thank Mohamed for his exceptional dedication, professionalism, and pragmatism over the last years. And in an even more personal way, I would like to say, go west, young man, and all the best. At the same time, I'm pleased to welcome Gösta Klump, who will take over for Mohamed in September. If you have any further questions, please send an email to Mohamed, Philipp, or myself and we will get back to you as soon as possible. Thank you, and I look forward to speaking to you again soon.

speaker
Guillaume Fauré
CEO

Thanks, Thorsten, and thanks, Mohamed. It's been great working with you. Thank you. Good luck. Thank you, everyone. Have a good day, and looking forward to talking to you or even meeting you at a later stage when aviation recovers. Keep safe. Thank you.

Disclaimer

This conference call transcript was computer generated and almost certianly contains errors. This transcript is provided for information purposes only.EarningsCall, LLC makes no representation about the accuracy of the aforementioned transcript, and you are cautioned not to place undue reliance on the information provided by the transcript.

-

-