11/8/2024

speaker
Dion
Conference Operator

Good morning, ladies and gentlemen, and welcome to the London Goals third quarter of 2024 result call. At this time, all lines are in listen-only mode. Following the presentation, we will conduct a question and answer session. If at any time during this call you require immediate assistance, please press star followed by zero for the operator. This call is being recorded on Friday, November 8, 2024. I would now like to turn the conference over to Ron Hochstein, President and CEO. Please go ahead.

speaker
Ron Hochstein

Thank you, Dion, and good morning, everyone.

speaker
Ron Hochstein
President and CEO

Thank you for joining us today. I'm joined by Terry Smith, Chief Operating Officer, and Chester See, our Chief Financial Officer. We're going to take you through our results for the third quarter of 2024. Please note, Lending goals disclaimers on this slide. This discussion includes forward-looking information. Actual future results may differ from expected results for a variety of reasons described in the caution regarding forward-looking information and statements section of our press release. Lending goal is a U.S. dollar reporting entity and all amounts in this presentation refer to U.S. dollars unless otherwise indicated. Lending gold achieved another strong quarter highlighted by record cash generation revenue and adjusted EBITDA, which was supported by a strong gold price. Cash flow from operations was $218 million, and adjusted free cash flow was $182 million. Record quarterly revenues of $323 million were realized during the third quarter from the sale of 125,887 ounces and an average realized gold price of $2,615 per ounce. From this, adjusted EBITDA and adjusted earnings of $220 million and $136 million respectively were achieved. Also a record. The strong financial performance was underpinned by gold production this quarter of 122,154 ounces, driven by recoveries of 86.8%, high average mill throughput of 4,623 tons per day, and average mill head grade of 10.3 grams per ton. Having produced approximately 367,000 ounces for the year at the end of the third quarter, Lending Gold is on track to achieve the upper end of its production guidance of 450 to 500,000 ounces. For Q3, the cash operating costs was $681 per ounce sold and all in sustaining cost was $877 per ounce sold. ASIC has trended toward the upper end of guidance due to higher sustaining capital expenditures. Operational excellence initiatives continue to reduce operating costs offsetting the impact of higher gold prices resulting in higher royalties and profit sharing for which the portion attributed to employees is recorded in operating costs as well as higher diesel consumption due to the operation of our existing power generation units to reduce our power consumption from the national grid. As a reminder, we set our guidance for the gold price assumption of $1,900 per ounce. Due to royalties and profit sharing, every $100 per ounce increase to the gold price results in an increase of approximately $10 to the cash operating cost and ASIC per ounce sold. With respect to exploration, the company is on track to achieve a minimum of 80,000 meters of drilling for the year across the conversion, near mine, and regional drill programs. Exploration activities during the quarter continue to yield positive results, which demonstrates that the true potential of FDM has yet to be fully discovered. At FD&S, delineation drilling continues to confirm the continuity of a new high-grade vein system with some of the best drill intercepts achieved to date. Conversion drilling has successfully concluded for the year and has defined several wide, high-grade mineralized zones that we expect to convert from mineral resources to mineral reserves as part of our updated resource estimate planned to be issued in the first quarter of next year. Both programs continue to highlight great potential for additional mineral reserves at FDM. At Bonsaiur, we have drilling results pending, and I look forward to disclosing these in the near future. With that, I'd now like to turn the call over to Terry.

speaker
Terry Smith
Chief Operating Officer

Thanks, Ron. And hello, all. We had another solid quarter that was highlighted by quarterly goal production totaling approximately 122,000 ounces. Along with that great performance, we saw an improvement on safety as there are no lost time incidents. We had three medical aid incidents bringing the total recordable incident rate across the company to 0.33 per 200,000 hours worked for the quarter compared to 0.75 in the second quarter. The operations team continues to focus on safety with more leadership presence in the field as well as a hand injury prevention campaign as most of our recordable injuries have been hand related this year. Mine production was near record levels during the quarter with 427,000 tons mined at an average grade of 9.9 grams per ton. The mill processed 425,340 tons at an average throughput rate of 4,623 tons per day, which is slightly less than the previous quarter due to a planned shutdown to complete tie-ins relating to the process plant expansion and higher unscheduled mill downtime. The average grade of ore milled was 10.3 grams per ton, with an average recovery at 86.8%. Recoveries were affected by finely disseminated sulfide minerals in the ore. The addition of three Jameson cells in the process plant flotation circuit is expected to improve recoveries for gold associated with these sulfides. As for the process plant expansion, we're on track to be substantially complete by the end of the year. Detailed engineering and procurement activities were completed in the third quarter. As you can see in the pictures, we've received on site the major pieces of equipment, including the Jameson cells and the concentrate filter, which have been put in place. Construction of the upgraded tailings pipeline was completed and commissioned during the quarter. We are currently close to commissioning the first of three Jameson cells with the reclaimed water pipeline and third concentrate filter scheduled to be completed and commissioned and in Q4. Upon completion, we anticipate operating at higher average throughput of 5,000 tons per day and improving metallurgical recoveries by approximately 3%. Several countries in South America have been experiencing a prolonged drought this year. Given that over 70% of Ecuador's electricity is generated from hydroelectric power plants, the drought has led to reduced electricity generation. The Ecuadorian government has reacted by implementing countrywide power cuts ranging from 4 to 14 hours per day. We are working with the Ecuadorian power authorities to run our existing generators at interim periods to reduce our load. To supplement these generators, four additional diesel power generators were purchased during the third quarter

speaker
Ron Hochstein
President and CEO

We have a conversion program, near-mine program, and regional program. Conversion is focused on replacing depleted ounces and growing our reserve base through the conversion of inferred resources. Our near-mine program is focused on growing inferred resources through the identification of new targets, including FD&S, FD&East, FD&North, and Bonsasur. Lastly, the regional program is targeting new epithermal discoveries like Fruta del Norte further afield on our large unexplored land package. Starting with conversion drilling, the recently completed 2024 program was focused on converting inferred mineral resources to indicated in areas immediately beyond the current mineral reserve boundary in the north and central sectors of the FDN deposit. A total of 13,755 meters of underground drilling from 110 drill holes were carried out in 2024, and drilling for this year is now complete, although some results are still pending. The program has defined several wide, high-grade mineralized zones that we expect to convert from mineral resources to mineral reserves as part of our updated resource estimate planned to be issued in the first quarter of next year. With respect to our near mine exploration, since the beginning of the year, we have drilled a total of 45,325 meters across 120 drill holes from surface and underground. In the third quarter, surface drilling has been focused along the extension of the east fault where the bonds of sewer discovery and other prospective sectors like FDN East are located. Underground near mine drilling has focused on FDNS. where we have achieved some significant results this quarter, with some of the highest grade intercepts ever achieved. 22 drill holes were completed this quarter, with most confirming gold mineralization. Standout drill holes include 145, which returned an intercept of 53.08 grams per ton over 10.8 meters, and drill hole 175, which returned an intercept of 65.01 grams per ton gold over 5.35 meters. While these are very exciting, I'm even more excited by the fact that the 20-drill hole results occurred in a sector that had been previously defined as lower grade in our current mineral resource envelope. Ten rigs are currently turning on the FDN near mine exploration program, three underground and seven on surface. On slide 13, staying on FDNS, the gray boxes highlight some of the underground drilling that took place in the third quarter from levels 1170 and 1080. You can see the two high-grade intercept holes here that I spoke to on the previous slide. But what is striking to us is that when taking all the results into consideration, this has confirmed that FDNS is a high-grade vein system of distinct geometry and style when compared to the FDN deposit. All the recent results are being incorporated into a new geological model for this sector and are expected to be part of the update to the FDN Mineral Resource Estimate to be completed in the first quarter of next year. Moving to slide 14, I want to discuss Bonsasur. Last quarter, we defined Bonsasur as a new deposit. In the third quarter, 28 surface drill holes were completed in the central part of the deposit. Drilling holes confirmed wide mineralized zones at shallower levels. At depth, the drilling program showed the transition of the wider mineralized zone into a narrower vein-veinlet type system. Furthermore, along the south and east extension of the deposit, the drilling program intercepted the same hydrothermal operation as that found at Bonza Soar, which indicates a potential for expansion along these directions. Gold mineralization has already been discovered for more than 1.8 kilometers along the north-south strike and for 500 meters along the down dip and remains open mainly to the south and to the east. Several drill holes have bonds of sewer pending and we look forward to updating the market on these drill holes in the near future. I want to conclude the exploration section by saying that this is the district's largest ever annual exploration program at a minimum of 80,000 meters and an estimated cost of $44 million, and is continuing to demonstrate the significant untapped exploration potential near, in, and around FDM. These results achieved to date demonstrate that the true potential of FDM and this extensive land package has yet to be fully discovered. With that, I'll turn it over to Chester to talk about the financial results for the quarter.

speaker
Chester See
Chief Financial Officer

Thanks, Ron. And good morning, everyone. In the third quarter of 2024, Lundin Gold recognized record revenues of $323 million from the sale of approximately 126,000 ounces of gold. An average realized gold price of $2,615 per ounce was realized, which was positively impacted by rising gold prices on provisionally priced gold sales that exceeded previous fair value estimates. Income from mining operations was $203 million compared to $100 million a year earlier, primarily a result of the higher gold price achieved during the quarter. From this, Lundin Gold generated adjusted earnings of $136 million or $0.57 per share this quarter compared to $45 million or $0.19 per share a year earlier. Adjusted EBITDA was a record $220 million in the third quarter. The London Gold story continues to be about free cash flow generation, which is now amplified by strong gold prices and a debt-free balance sheet. In the third quarter, we generated a record $218 million net cash from operating activities and $182 million in adjusted free cash flow, or $0.76 per share, compared to adjusted free cash flow of $81 million, or $0.34 per share, a year earlier. We expect to continue generating significant free cash flow in the future based on our production and ASIC guidance, especially given increased exposure to strong gold prices and no debt service costs. Since the beginning of the year, we have generated $470 million from operating activities, bought out the stream and offtake for $330 million, and doubled our dividends in the third quarter. Our anticipated free cash flow profile for the future leaves room for increased investment into growth, increased shareholder returns, or both. We continue to see tremendous organic opportunities with our successful near-mine exploration program, which could lead to investments into the development of new satellite deposits. And we continue to assess the M&A landscape. We are extremely well-positioned, and we will remain disciplined with respect to capital allocation. For a more detailed discussion of our financial results, I encourage you to turn to the MD&A. Now I'd like to turn the call back over to Ron for his concluding remarks.

speaker
Ron Hochstein
President and CEO

Thank you, Chester. Another strong operating and financial quarter for London Gold. With three quarters of the year behind us, I'm excited by the prospect of achieving the higher end of our production guidance of 450 to 500,000 ounces. Record gold prices and the cleaning up of our balance sheet have allowed the company to achieve record revenues, adjusted earnings, and free cash flow. The increased gold price has resulted in increased royalties and accrued profit sharing. These costs have an impact on the company's cash operating costs and ASIC per ounce sold that were set based on a gold price assumption of $1,900 per ounce. Irrespective, through continued cost reduction measures, we are still confident that we'll meet our cash operating cost guidance of $680 to $740 per and ASIC cost guidance of $820 to $890 per ounce sold. The process plant expansion project to increase plant throughput to 5,000 tons per day and improved metallurgical recoveries with the addition of the Jameson cell technology remains on track. And we're looking forward to bringing the major components online by year end. 10 rigs are currently turning across the near mine and regional programs. And we're looking forward to sharing with you the pending drill results of Bonza Sewer and the updated mineral resource and mineral reserve statements in the first quarter of 2025 from the largest annual drilling program ever conducted at FDM. Our financial performance this year has been strong, and with the current gold price, we need to remain focused. We know there are areas for improved productivity and cost reduction at FDM, and we will continue to target them. With respect to capital allocation, we will remain disciplined and pursue growth that makes sense, both organic and inorganic. Thank you all for joining us and for your continued support. And with that, I will now turn the call over to Dion for questions.

speaker
Dion
Conference Operator

thank you ladies and gentlemen we will now begin the question and answer session should you have a question please press start followed by one on your touchstone phone you will hear a prompt that your hand has been raised should you wish to decline from the polling process please press star followed by the number two if you are using a speakerphone please leave the handset before pressing any keys one moment please for your first question your first question comes from karen smith of Haywood Securities. Please go ahead.

speaker
Karen (Kerry) Smith
Analyst, Haywood Securities

Thanks, operator. Hi, Ron and Chester and Terry. Thanks for the update and congratulations on a good quarter. So the first question I had was on the expected downtime in Q4 for the rest of the times in the plant, how many days do you think that might be, like in terms of full days of lost production? Would it be a couple of three or might it be more than that?

speaker
Terry Smith
Chief Operating Officer

Hey, Kerry. It's Terry here. We've got three days scheduled for tie-ins this quarter.

speaker
Karen (Kerry) Smith
Analyst, Haywood Securities

Okay, perfect. Thank you. That's good. And, Kerry, you can probably answer this one too. How much power do you actually need to run the plant? What is the draw? Just remind me.

speaker
Terry Smith
Chief Operating Officer

Our peak load is around 18 meg and our nominal is 16.

speaker
Karen (Kerry) Smith
Analyst, Haywood Securities

Okay. So you'll have enough then to Okay, great. And then maybe the last question, maybe Ron can answer. What gold price are you thinking you'll use when you update your reserves and resources next year in Q1?

speaker
Ron Hochstein
President and CEO

We're not changing our gold price assumptions, Terry. We're going to stay at the $1,400 that we've had for the last couple of years. We're not modifying it.

speaker
Karen (Kerry) Smith
Analyst, Haywood Securities

Okay. I mean, it's not sensitive. I just wondered if you might change. Okay. That's great. Thanks very much.

speaker
Ron Hochstein
President and CEO

You're welcome, Kerry. Thanks, Kerry.

speaker
Dion
Conference Operator

Your next question comes from Don DeMarco of National Bank Financial. Please go ahead.

speaker
Don DeMarco
Analyst, National Bank Financial

Thank you, Operator. And Ron and team, thank you for taking my question. First question, I've got a few on the status of the power brownouts in Ecuador. Are there certain hydro generating stations that are more important than others for the grid-powered FDN? And has there been rain at these? Like, do you watch the reservoir levels? And then also, what's the expected cost per ounce increase in a worst-case scenario if you had to run all four gens at 14 hours per day versus current grid power?

speaker
Ron Hochstein
President and CEO

Yeah, good morning, Don, and thanks for the questions. Yeah, the power situation is, to use the words in Ecuador, is a crisis. You can only imagine... citizens and businesses that are having to face power outages of 14 hours per day. There are two major reservoirs, well, a major river, which the Quota Sinclair Power Facility has run a river project and uh which is about 1300 meg and then there's a couple reservoir three reservoirs it's a chain system more closer in this hawaii province which is around cuenca that's a big power generation as well thankfully we have been seeing a lot of rain in the highlands both up in the north and south over the last week to 10 days but the problem was these reservoirs are so low uh that it's you know where they had talked about reducing the power outages per household, but now they're talking about maybe having to increase that again because the forecast for the latter half of November and December are not good. It's a real challenge. They are looking for other sources, and they have some other sources available, but they've been delayed on that because, as Terry said, this is not an Ecuador issue. Colombia is having a similar issue, and so is Bolivia. But yeah, they have some plans to try to help that. But again, we're more or less at the nature and hopefully we start to see some rainfalls. When we look at the power generation, it's roughly about $10 to $15 an ounce, about that range cost for us, additional cost.

speaker
Don DeMarco
Analyst, National Bank Financial

Okay. Okay. And what would that scenario be like if you're running all four for half or 12, 14 hours a day type thing? It doesn't really seem material, frankly.

speaker
Ron Hochstein
President and CEO

Well, it's maybe closer to 10 if it was running all four for part of the day. There are times now we are in discussions with the local utility to maybe have to increase the number of hours run to try and help out even more. You know, we've built a good relationship with the utility because we've We've been able to try and, if they need help, we try to help, so we run our generators a little bit more.

speaker
Don DeMarco
Analyst, National Bank Financial

Okay. And just to be clear, I mean, you have some generators right now, but then there's the ones that you procured, they're going to be commissioned in Q1. So I'm referring to if you were to run those ones, right, that's about $10 an ounce?

speaker
spk04

Yeah, and then we get closer to the $15 an ounce when you start running more of them.

speaker
Ron Hochstein
President and CEO

Yeah. Okay. Okay, thanks, Ron.

speaker
Don DeMarco
Analyst, National Bank Financial

That's helpful.

speaker
Ron Hochstein
President and CEO

Yeah, and we're looking at maybe even commissioning one of the four here sooner than Q1 of next year. Okay. The team's looking at that right now because the situation in Ecuador is just not getting any better.

speaker
Don DeMarco
Analyst, National Bank Financial

Okay. Well, nice you could get that contingency in place. Just moving to my second question. At FDNS, congratulations on the intercepts there. Could you just repeat your comparison to FDN? Were you saying it looks like it might even be higher grade than FDN? I mean, it still seems a little bit early, the number of holes and all that. And we look forward to the resource update. But if you could just add a little more color in your comparison here. Thank you.

speaker
Ron Hochstein
President and CEO

It's higher. I don't know if it's necessarily higher grade than FDN total. It's higher grade than that area that was previously part of the inferred mineral resource envelope. that southern extension of the mineral resource envelope was running around 4 to 5, average grade 4 to 5 grams per ton. And you can see by the results that we've had to date that those vein systems are significantly higher than that. So what that's going to mean, Don, is that southern end of that resource envelope, when we bring FDNS now into the FDN envelope, is definitely going to bring the grade up on that southern part of the resource.

speaker
Don DeMarco
Analyst, National Bank Financial

Okay. Thank you for clarifying that. Well, good luck with Q4 and the tie-in.

speaker
Ron Hochstein

That's all for me. Yeah. Thanks, Tom. Your next question comes from Ovais Habib of Scotiabank.

speaker
Dion
Conference Operator

Please go ahead.

speaker
Ovais Habib
Analyst, Scotiabank

Thanks, Operator. Hi, Ron and the Dean Gold team. Really, congrats to you and your team on another great quarter. Just a couple of questions for me, just following up on Kerry's question in regards to the shutdown. Just wanted to see if you can provide a little bit more color in terms of how should we be looking at the throughput rates as well as grades for this quarter. I recall you had stated that grades are expected to decline sequentially from the Q2 results around the 11 grams per ton. So just some color there, that would be great.

speaker
Terry Smith
Chief Operating Officer

Kerry, do you want to add? Yeah, sure. Thanks for the question. We were in at around 430,000 tons last quarter. With the tie-ins and sort of the commissioning around the plant, we're really trying to hit that number, if not exceed it a little bit, in terms of throughput, if that's helpful.

speaker
Ron Hochstein
President and CEO

Part of that is because we now have the new tailings line commissioned, right, which came in near the end of Q3. So that will help us to maybe up the throughput a little bit on the days when we are running. Yeah, that's a good point.

speaker
Terry Smith
Chief Operating Officer

Perfect. Perfect. Grades will be consistent with where we were in Q3, I would say.

speaker
Ron Hochstein
President and CEO

So we're going to be back up from 10. Yeah.

speaker
Ovais Habib
Analyst, Scotiabank

Perfect. Okay. And just kind of moving on to some of your capital allocation priorities. And just again, once again, well done on completing the new mod stream facility payment. And you've achieved the debt free status as well. So, how do we look at your capital allocation priorities going forward? Again, you talked a little bit about M&A as well. Does Bonza score deter you or change how you're thinking about M&A, any sort of color thereon?

speaker
Ron Hochstein
President and CEO

I wouldn't say it deters us. I don't mean to be facetious or anything, but we're in a good situation that we're generating the cash flow that we're generating, and credit to the team at site that continue to look for ways to reduce our operating costs, that we're generating the cash, that we have the flexibility to look at either or, or both. It's not a case, obviously, that we have to really make some decisions. With a clean balance sheet, the cash flow we're generating, we have a lot of flexibility. The key is, to stay disciplined and, you know, to ensure that we're pursuing the right opportunities. So we can look at both. It's not going to deter us from M&A by looking at the development of bonds of sewer.

speaker
Ron Hochstein

Perfect.

speaker
spk04

Again, thanks for taking my questions and look forward to the side trip next week. Yeah, look forward to seeing you and Don next week.

speaker
Dion
Conference Operator

Your next question comes from Anita Soni of CIBC World Markets. Please go ahead.

speaker
Anita Soni
Analyst, CIBC World Markets

Morning, Ron and team. Thanks for taking my questions and congratulations on a solid quarter. Most of the questions have been asked and answered. I just was wondering about the sustaining capital that you mentioned that the ASIC is climbing a little bit because of increased sustaining capital. Can you provide a little bit more color on that?

speaker
Ron Hochstein
President and CEO

It's mostly, thanks, Anita, for the question, and welcome to the team of analysts covering FD lending gold. It's mostly the power generation, which added approximately, Chester, how much? About $15 million to our sustaining CapEx. That's really the big one. There were some other Small things like we did purchase a scoop, which was not in the original budget, which was roughly about another million. 1.8 million. Or 1.8 million. Thanks, Chester. So a couple things, but it's primarily the power generation, this decision to bring those additional generators and infrastructure around those.

speaker
Anita Soni
Analyst, CIBC World Markets

Okay. And then would that carry through, do you think, to 2025?

speaker
spk04

There's five. Go ahead, Chester.

speaker
Chester See
Chief Financial Officer

With regards to the gensets, as we mentioned, we will be commissioning it to be up and running by the end of the first quarter of next year. So there's about $5 million of those costs that will carry over to next year's sustaining capital.

speaker
Ron Hochstein
President and CEO

They'll be in our sustaining capital budget that will be part of our 2025 budget that we'll be announcing later this year.

speaker
Anita Soni
Analyst, CIBC World Markets

Okay. That's it for my questions.

speaker
Ron Hochstein

Thank you. Thanks, Anita. Your next question comes from Carrie Smith of Haywood Securities.

speaker
Dion
Conference Operator

Please go ahead.

speaker
Karen (Kerry) Smith
Analyst, Haywood Securities

Thank you. Chester, maybe I missed it, but what was the capital cost for the four more gensets, the 10 megawatts that you bought and plan to install?

speaker
Chester See
Chief Financial Officer

Yeah, in total, it's about $20 million. $15 million of that is being incurred this year. and the remaining five is next year.

speaker
Karen (Kerry) Smith
Analyst, Haywood Securities

Okay, gotcha. And just to be clear, in the slide deck you say those generators will be up and running in Q4, but I know Ron made a comment that it would be Q1 off of Don's question. So just to clarify, which is it?

speaker
Ron Hochstein
President and CEO

No, they're purchased in Q4, but they're installed and commissioned in Q1.

speaker
spk04

Okay.

speaker
Ron Hochstein
President and CEO

Because it's the electrical switch here. It's electrical switch gear and that that we need to tie them in has been is that's the delivery times on that are longer.

speaker
Karen (Kerry) Smith
Analyst, Haywood Securities

Gotcha. OK. OK. That's good. OK. Great. Thank you, guys. Appreciate it.

speaker
Dion
Conference Operator

Your next question comes from Jeremy Hoy of NCERT.

speaker
Ron Hochstein

Please go ahead.

speaker
Jeremy Hoy
Analyst, NCERT

Hi, Rod. Terry Chester. I appreciate you taking my question. A lot of good discussion. Just two quick ones from me on the exploration. One, wondering what you guys are thinking about in terms of exploration budget next year. Are we going to see a step up versus the record program you guys had this year, or were you at about the right level? And two, just wondering if you could provide a bit more color on FD&S for our understanding. I'm just curious how the strategy changed to be able to better define that vein system and understand, you know, it's a higher grade versus the lower grade inferred before. Thanks. That's it for me.

speaker
Ron Hochstein
President and CEO

Thanks, Jeremy. Right now, based on the philosophy that Andre has in the team is that For our budget, our exploration program will likely be roughly in and around the same levels as the current one, around the 80,000 meters. But quite frankly, Jeremy, if I was a betting man, it's going to increase because what we do is we base the budget on what we know today and what we want to drill based on what we know today. But then as we did this year, When we have success, then we have the flexibility again because of the cash flow we're generating to be able to expand it. So that's a philosophy we're taking. With regards to FD&S, what's really changed a lot was all the drilling in that southern part of that resource was all done by Ken Ross, and that was all done from surface. we've extended out those, the 1080 and 1170 levels, kind of finished that development about partway through the year, Terry. And so by that development and being able to drill from underground really has enabled us to really drill this out and really see what this system is. That's been a big, big part.

speaker
Jeremy Hoy
Analyst, NCERT

Okay, that's great color, Ron.

speaker
Ron Hochstein

Thank you. Appreciate it. And I'll step back in the queue.

speaker
Dion
Conference Operator

Once again, should you have a question, please press star followed by one on your touchstone phone. And should you wish to decline from the polling process, please press star followed by number two.

speaker
Ron Hochstein

Thank you, ladies and gentlemen.

speaker
Dion
Conference Operator

That concludes our question and answer session. I will now turn the conference back over to Ron Hochstein, President and CEO. Please go ahead.

speaker
Ron Hochstein
President and CEO

Thank you, Dion. And thank you, everyone, for attending the call this morning and providing the great questions. And I look forward to seeing some of you next week in Ecuador. And yeah, as Chester mentioned, we anticipate budget 2025 budget coming up later this year, which would probably be our next and the bonds of sewer results as well over the next four to six weeks. So thank you again everyone and have a great day and a great weekend.

speaker
Dion
Conference Operator

This concludes today's conference. Thank you for attending. You may now disconnect your lines.

Disclaimer

This conference call transcript was computer generated and almost certianly contains errors. This transcript is provided for information purposes only.EarningsCall, LLC makes no representation about the accuracy of the aforementioned transcript, and you are cautioned not to place undue reliance on the information provided by the transcript.

-

-