11/6/2024

speaker
Antonia Ljunelind
Senior Vice President, Investor Relations at Skanska

Good morning and a warm welcome to the press conference for Skanska's third quarter report 2024. My name is Antonia Ljunelind. I'm the senior vice president for investor relations here at Skanska. And here in the studio on stage today, I have our president and CEO Anders Danielsson and our acting group CFO Pontus Winkvist. Shortly, they will take you through an update based on our third quarter report. And after their initial presentation that will cover a business, financial and market update, we will move over to questions. And you as the audience, you can ask questions by either calling us here in the studio using the HD audio link or the telephone conference number provided in the invite, Or if you are joining us here in the studio, you can just please raise your hand and we will bring a microphone. But I will take us through that once again when we get to the question session. So with that short introduction, I will hand over to you Anders to start the presentation looking at one of our data center projects.

speaker
Anders Danielsson
President & CEO of Skanska

Yes. Thank you, Antonia. And as you can see on the picture here, it's a data center and that is booming market now around our geographies, especially in the US. And we are well positioned. We have been well positioned for many years. So we have a lot of skilled people in the organization that can take on these opportunities. And as a fact, in Q3 isolated, we have won projects, data center projects for nearly 10 million Swedish crowns. So it's a great opportunity. Going into the third quarter report, starting overall, some highlights here. I think it's a good performance overall, stable quarter, especially in construction, very good performance. We're hitting our targets of 3.5% in isolated quarter, 3.6%. So strong order intake and solid margin delivery. So that is good. Residential development sales are improving from low level though, but it's definitely see some improvement signs, but I expect it to take some time. And we also in the quarter taking restructuring cost for Boklok or a low cost segment, restructuring due to very tough market in that segment. And we're also taking some impairment charges for predominantly land in that operation. Commercial property development, leasing, we can see improved leasing in our different geographies. And we can also see improved leasing in the U.S., which is a good sign for us going forward. So we'll come back to that. Investment properties, solid operational and financial performance. We are very high on the leasing ratio. We are very well received by our tenants, so we're in a good place there. Operating margin in construction, as I said, 3.6% compared to 3.3% last year. Return on capital employed in product development. This is on a rolling 12 months basis. So there is on the negative side due to the fact we had the impairment, large impairment charges in the fourth quarter last year. And that is also somewhat impacting the investment properties as well. Here we have a return on capital employed 1.8%. And the same with the return on equity on a rolling 12 months basis, of course, 7.9%. We have managed to maintain a very robust financial position, which is extremely important. So that is something we highly prioritize. And we have reduced the carbon emission in our own operation with 57% compared to the base year in 2015. I'll now go into each and every stream, starting with construction. Here we can see increasing revenue, which is perfectly in line with my expectations since we have had a good order intake for many quarters now. This quarter is not an exception. Very strong order intake, over 50 billion. And the good thing here, we'll see the details later on, but we increased the order intake in all geographies. And very high compared to last year, over 60% increase here. Booked a bill of 124% on a rolling 12-month basis, and we maintain a record high order backlog, healthy backlog of 267 billion Swedish. Operating income, 1.5 billion increase from last year, which gives us the margin again on 3.6%. So solid margin delivery and if you look at a rolling 12 months basis, the margin is slightly shy of our target, 3.4%. Strong order intake in the US, both on building and civil operations. Moving to the residential development, revenue up due to the increase of home sold, 1.7 billion. We started the projects 186 in the quarter, and we are in the position, I would say, that we can start more projects, and we will do so when I think it's right. Operating income again on negative territory due to the write-downs we had, impairment charges. save or return on capital employed so we can see increased volumes in the nordics good level continuing good level of activity sales activity in central europe and that has been the trend for for some some time now and we can see it continues the total book look losses is minus 241 million And the underlying margin, operating margin, exclude the book loop operation and the property asset impairment charges is 7.9%. Not bad in the tough market, I would say. Commercial property development. quarter that we have sold one asset we sold one office building in norway during the quarter but here you should look at the more over time we can see that if you add the three first quarter in in this year we have divested six assets So we can definitely see signs of improvement, both on the investor side, but also on the leasing, as I said earlier. We had a gain on sale of 185 million in the quarter, return on capital employed 0.5%. So today we have 17 ongoing projects with corresponds to almost 23 billion in total investment upon completion. And we have 23 completed projects, 12 billion in put and investment. Healthy leasing rates in those, 75%. So quality asset and we're well positioned when the investors comes back. And we can see signs of that. Property asset impairment charges in the property, commercial property development is 121 million. predominantly land and majority in U.S. Good leasing in the U.S. portfolio. The total leasing is 34,000 square meters, which is also an increase compared to previous quarters. Investment properties operate stable, operating income of 79 million. We have a high occupancy rate of 89%, so very stable there. And we are today just shy of the 8 billion in asset values. So we are on a good way to reach our ambition here to be between 12 to 18 billion to generate a stable cash flow going forward. We already see that today. If I move back to construction and look at the order bookings, here you can see the last five years, the development of the blue bars is the order backlog. You can see the book-to-build ratio, the yellow line, revenue, the green, rolling 12 as well. So you can see that it's gradually building up a healthy backlog. And the backlog today is... high quality so i i'm very confident in that that we have i'm proud of the organization they've kept the discipline they'll go go for project where we have a competitive advantage where we have the team in place where we have a profit profitable history so that is good so as you can see the blue bars is on record record high levels if i go into geographies when it comes to order bookings. Good, as you can see, we increase the order intake in all geographies, but the majority of the increase is in US, of course. You can see that we have increased this from 20 billion to 32 billion. adding up to almost 51. So 124% book to build, which is on a very high level. And the US is the strongest, of course. And we can also see that the duration in the order backlog has increased, which is also good that we are in a position where we can continue to be selective and go for a project where we have a competitive advantage, where the market is good. So I will come back to the market. But first, I will hand over to Pontus to go through the details.

speaker
Pontus Winkvist
Acting Group CFO of Skanska

Thank you, Anders. So then, going in a little bit more in detail to the numbers and starting with construction. And as Anders said, I mean, I also want to point out, I mean, it's a strong performance within construction. You see that the revenue inclines by 2%. If we adjust that for currency effects, it actually increases by 5%. We also see that we continue to deliver a healthy gross margin of 7.3%. Operating income actually increased by 11%. And if you add just that for currency effect, it increased by 15%. So we are ending up there of a little bit more than 1.5 billion in operating income and a strong I would say operating margin of 3.6 percent and also if we look into the ruling 12 months operating margin we are as Anders said I mean very close to our target of three and a half percent. Going then into the different geographical areas, you can see that it is overall quite a good performance. The Nordics are delivering 3.2%, where Sweden is delivering 3.5%. In Europe, you can see that we are increasing with one percentage units from 2.9 to 3.9%. And in the US, we are on a continued good level of 3.8%, and also with an increasing operating income in absolute terms. So 3.6 in total for the quarter compared with 3.3% for the same quarter last year. Then, going into the residential development, and here, I mean, you can see that the revenue is increasing quite a lot, I mean, if we compare to how it looked one year ago. So we are now at 1.7 billion in revenue. This is, of course, I mean, from a normalized point of view, quite low, but anyway, it's a good increase. So it's a better market, even though it's not good yet, but I think here that the change is really good. You can also look into the S&A here, and we have S&A of 166 million compared to 352 the same period last year. And also on a rolling 12, we see that there's a real decline in the S&A cost. So, I mean, this really shows that we have worked with adapting the organization to the current market conditions. I think that this SNA level is probably the right level, but it also gives us room to increase the volumes with the current SNA base, and then we can see that the actual relative SNA, the SNA percentage, will come down somewhat. Then there is of course here a negative operating income, 154 million negative. And the major thing here that is happening, Anders mentioned it in the beginning, is the boklok, where we have a loss within boklok of 241 million in the isolated quarter. Then there are some minor, I would say, write-downs also within residential development. But if we take out both the write-downs and the book cloak performance here, we are actually on the underlying margin of 7.9%. So it's not where we want to be, but it's on the way to where we want to be. Looking then into the different geographies in residential development. Here you can see that Boklok again is impacting both the Nordics and the European business. So the major impact here is again Boklok, since we have that business both in Sweden and in the UK. And again, the underlying margin, if you exclude boklok and write-downs, is 7.9%. Going then into start and sold units, and here you can see that first we have started two projects within the quarter. The majority started within Central Europe, and this small Norwegian project started as well, so we started 186 units. The sales rate is coming up quite a lot and we are selling 458 units here during the quarter. And I would say that the sales pace is generally improving in all our markets. As you also can see, I mean, looking into the ruling 12 number, I mean, we are increasing here. Going then into the homes in production, obviously, since we haven't started very much projects during the last years, I mean, the number of total homes in production is coming down. We are for the first time below 3,000 homes in production. We are increasing our sales rate, and I mean, which also means that the unsold completed is coming down. So we are now at 454 homes and that's compared to 671 that we watched by the end of Q2. So an improved situation on the stock. The important thing here is of course now that we get the opportunity to start projects and I think you will see more starts coming on going forward. Then going into commercial development. Here we have a revenue of around 1 billion, and also here we unfortunately see a negative operating income of 113 million. We have also here had a couple of write-downs. It's small write-downs, and it's coming because we have done a very thorough valuation process during this quarter. So I mean, we have gone through everything and there have been in a couple of projects small write-downs that we have seen. So we have here a negative income of 113 million. If you look into the gains coming from the divestments, we have sold one property during the quarter, but the majority of these gains are not coming from that divestment. It's actually coming from previous divestment where we have released some provision because of reduced remaining risks in those. Unrealized gain within the commercial property development is on stable levels. You can see that there is no major change here coming from Q2. But also here, this is also a result of the real thorough process that we have had when we have looked into the value within our property portfolio. If we look into the completion profile, you can see here that in Q3, we have completed projects for around 12 billion. It is two projects that came into this during the quarter, and it's two projects that has went out that we actually have been sold and delivered to the purchaser of this project. so it's a small increase but we are keeping if we compare to q2 the occupancy rate on 75 percent then looking into the rest of the completion profile here you can say that we are continuously leasing in all the projects not all but in many of the projects i would say Talking about leasing, if we look into the leasing here, we have been leasing 34,000 square meters during the quarter. What you also can see is that the completion rate and occupancy rate now are on the same level, actually on 64%. And this is, of course, a good sign to see that we are able to lease out in the same proportion as we are completing our properties. I would also say that the majority of the leases is coming from our U.S. business here. Investment properties, I would say here, I mean, we have a stable portfolio that you can see has reached almost 90% in occupancy rate. It's also starting to deliver reasonable profit to the group. And in the quarter here, we see it's delivering 79 million. Yes, so then going into the total group number here where we have an operating income of 1.3 billion. compared to 625 million last year. Then we shall remember that in this income we have write downs of around 300 million. We had also write downs in the same quarter last year of around 900 million. And then we also have this negative impact of Boklok in the quarter. one thing to mention here i would say is if you look into the taxes that we have quite a high proportion of tax in this quarter coming in at 430 million and gives us a tax rate in the quarter of 30 percent And this depends on, first, I mean, there are some periodization impacts in the tax calculation, but there is also a mixed effect where we are seeing that a bigger proportion of the income is generated from our US business, while smaller than income is generated from property divestments, which normally is tax-free, especially here in the Nordics. But I mean, if you should look into your expected future tax rate, 30% is not relevant to look at. It's more relevant to look into the rolling 12-month tax rate, I would say. As you heard in the beginning, this quarter is very strong from a cash perspective. The operating cash flow is 6.2 billion in the isolated quarter. And I mean, this is of course a combination of strong working capital development within construction, but also that we are doing more divestments than investments in the business. You will see that soon on the coming slides. So free working capital within construction is by the end of Q3 reaching 31 billion in absolute terms. It gives a relative number compared to the revenue on a rolling 12-month basis of 17.4%. So, I mean, it is at least, I would say, if you look into the absolute number, I mean, the best absolute level that we have had during this period. But it's also that I think that we cannot really rely on that this number will stay on for the coming quarter because there have been a number of mobilization payments coming in and some of that cash will most likely be used even though the Q4 quarter normally is quite strong from a cash perspective. Then going into the investments and divestments, you can see here on the green line that we are continuing to deliver net divestments. It was 2.7 on a rolling 12-month basis, which also means that we are taking down the capital employed within the business. We are closing this quarter on 64.3 billion, a little bit more than 2 billion less than we closed the second quarter on. But of course, I mean, as we said, especially when it comes to residential development, we have an ambition to start more projects. So we should not expect that. I mean, we continue to have huge net divestments. The good cash flow also of course is being seen when we look to our liquidity situation where we have now available funds of almost 25 billion. I also think that we have quite a good maturity profile on our loans and outstanding bonds. The balance sheet is stable, but it's also a stable liquidity situation that we have. Then looking into the financial position, you can see here that our adjusted net interest bearing receivable has went up to 6.5 billion in the second quarter or in the sorry in the third quarter and it gives us a stable equity to asset ratio of 35.9 percent so by that i leave it over to you anders sure

speaker
Anders Danielsson
President & CEO of Skanska

So I will address the market, start with construction. And here we can see a strong market in the US, both for civil and building. We are in the right positions. We expect infrastructure investment to continue big time on the West and East Coast where we are strong. We also see the social infrastructure, schools, hospitals, universities, airports. That is also a strong market. And also, again, data centers, of course. The civil market is mostly stable in Europe, but the building market in the Nordics and Europe is slower. Residential development we can see gradually improving in the Nordics, but returning to normal levels will take some time. So that's why we continue to have a weak market outlook the coming 12 months. And also the market condition for a low price segment is continuing to be challenging. Central Europe, however, continues to be a stable market. Commercial property development slowly improving. Investor market and leasing market, leasing activity is improving. And there is a clear trend that the companies want to sit in a high quality building. So it's like the quality is continued to be clear. Investment properties, strong demand for high quality spaces. But it is a polarized market. But we can offer high quality class A building in the right location. So we are attractive here. And rents are expected to be stable going forward. To summarize the group, construction, strong order intake, very healthy margin, residential development, sales are improving, we have an underlying healthy business, commercial property development, leasing activity picks up, and solid performance in investment properties. And of course, we maintain a solid, strong financial position. So now I will hand over to Antonia to open up the Q&A.

speaker
Antonia Ljunelind
Senior Vice President, Investor Relations at Skanska

Thank you. Yes, so now it's time for your questions. And if you're watching online, as I mentioned before, you can join us here in the studio by using the HD audio link provided in the invite to this press conference or the telephone conference number. And then just follow the instructions by the operator and you will get through to us here in a few minutes. And then if we have any questions here in the audience, just please raise your hand. We will bring a microphone and may I ask you to start by stating your name and organization. We have a question up here.

speaker
Stefan Hansson
Danske Bank Analyst

Stefan Hansson, Danske Bank. A couple of questions. First on construction. We're seeing very high demand in some markets, recovery in some others, and material coming down a little bit. Could you maybe elaborate on the margin and the order backlog? It might differ between the US and Europe, of course, but if you see any difference in that margin versus what you're actually performing on.

speaker
Anders Danielsson
President & CEO of Skanska

Hello, Stefan. I can say that the quality in the backlog is good. I'm confident that our gross margin is on a healthy level. There is also... We managed to... see mitigate the risk we go into we understand the risk we mitigate the risk so we see very few margin fade in our project and that's so in most cases we can deliver on our bid margin and then we we don't go into the differences between different market but it is a healthy margin and of course if in a good market we try to push it upwards that's what we're working with

speaker
Stefan Hansson
Danske Bank Analyst

And then on RD, you have the one-offs and write-downs here again. We've seen those for a year almost now. Are we done with that? And when it comes to the book business, if I understand this correctly, it's running at 40, 50 million loss, maybe. I haven't calculated it totally. But is that the level for BookClub going forward?

speaker
Anders Danielsson
President & CEO of Skanska

I can start and you can fill in. Are we done? We take everything we see in this quarter. That's for sure. And we have, as Pontus alluded to earlier, we have done a thorough analysis of all the assets we have in the portfolio. And we also have taken the necessary charges for that. And we also are taking the consequences now to restructure the Boklok business. So we will merge the Swedish Boklok operation into Skanska Sweden, and that will happen after new year. And we also taking charges for that restructuring because we need to get the S&A level down. So that's that's for sure. And then the more You're alluding to the operating. Of course, with this action, we will try to minimize the losses going forward. That's our job.

speaker
Pontus Winkvist
Acting Group CFO of Skanska

But you are correct, I mean, to assume that there will of course be a cost, I mean, running this business, even if it's within Skanska Sweden. But I mean, hopefully, I mean, it will also generate income going forward. That's the plan.

speaker
Stefan Hansson
Danske Bank Analyst

Good. And then on CD, normally fourth quarter is a very active quarter when it comes to transactions. We see interest rates coming down. We see some of the real estate names adding capital. Our bond market is super hot. What do you see in your – I mean, you're negotiating stuff now, so I'm sure you know what's happening, but you might not want to tell us. But is there activity? Could we expect some divestments coming through in Q4, or do we have to wait until 2025?

speaker
Pontus Winkvist
Acting Group CFO of Skanska

I won't say that you can expect something to happen, but I can say that there are a number of negotiations ongoing. If those will happen, if those will happen during this year or during the beginning of next year, very difficult to say right now. But there is, I mean, yes, there is activity.

speaker
Stefan Hansson
Danske Bank Analyst

And then the final question. You have a very strong balance sheet. You have a net cash position. You have IP is unleveraged. You have all the CD assets, land bank and RD. I know it's a board question, of course, but from your perspective, managing the business, now when you see a bit of light in the tunnel in many of your divisions, do you need all the capital you're having allocated at the moment?

speaker
Anders Danielsson
President & CEO of Skanska

Yes, we do. I'm very comfortable with our financially strong position. That gives us a competitive advantage. We want to start projects, both in the residential and commercial development side. And we can do that with our own decision, which is a really good place to be. And that's our priority to continue to stay financially strong and take advantage of that and start project where we think it's right.

speaker
Antonia Ljunelind
Senior Vice President, Investor Relations at Skanska

Okay, so we will then move over to questions from our online audience. And Operator, could you please introduce the first caller?

speaker
Operator
Conference Operator

questions over the phone, please press star followed by one. Our first question comes from Simon Martinson from DMP Market. Please go ahead.

speaker
Simon Martinson
DMP Market Analyst

Thank you and thank you for the presentation. A few questions from my side. The order backlog has grown very much and it's at very impressive levels, but many of the projects we have seen is for several years. Could you just give us some coloring on how much of the order book is mature for maturing 2025 and some comments on the duration of the books and when it will translate into revenues in construction?

speaker
Anders Danielsson
President & CEO of Skanska

I can start with that. The order back then, as you say, is on a very high level. You can see the months of production is also increasing, especially in the US. And the duration has increased. So of course, as I said earlier, we are in a good position. We don't need to chase. work we can continue to be selective and go for project because we have a capacity to go for new projects but we can be selective and we will we will stay selected yeah but how much of the book percentage-wise versus a normal or backlog level matures in 2025 I'd say we're in a good place. We don't we don't give forecast number or how much we have in hand, so to speak for for next year's revenue, but we are in a good place.

speaker
Simon Martinson
DMP Market Analyst

Thank you. Residential starts has been low in the quarter, as you mentioned, but we see also that the number of completed unsold apartments continue to drop. How much priority is it to reduce still the unsold inventory versus starting new homes? And how do you assess the potential recovery and the speed of that when can we expect Skanska to start producing and start selling and starting homes again?

speaker
Pontus Winkvist
Acting Group CFO of Skanska

I think, as you had seen, Simon, the number of unsold has gone down quite much. So I would say that the focus will turn from divestment out of the portfolio to actually start. Then, of course, it needs to be solid projects where we can expect nice and reasonable profit from those projects. But we think that that will happen and you will probably see more projects to be started within the RD business.

speaker
Simon Martinson
DMP Market Analyst

We also noticed that you have 12 billion of completed assets in commercial development, one of the highest levels we've seen there. Stefan asked about divestments here, but can you please give us some coloring on in which markets are these 12 billion assets located? The potential for divesting those?

speaker
Pontus Winkvist
Acting Group CFO of Skanska

Some coloring is that the majority of those, or I would say a large number of those, are in the US. So you will likely see divestments coming out both from that market and from other markets as well going forward.

speaker
Simon Martinson
DMP Market Analyst

And final question, in terms of the impairments in the quarter, not the organizational cost, what has been driving those impairments? Has it been higher interest rates? Has it been delayed and expected starts? Or is it selling prices? What has been the main driver for reducing the asset values?

speaker
Pontus Winkvist
Acting Group CFO of Skanska

It's quite easy actually because we have went through all the assets basically that we have within the entire group and valued property for property and then on some cases there have been small adjustments so based on that and according to our policies how we are treating the valuations within our balance sheet this has resulted in those I would say minor adjustment on a few properties.

speaker
Simon Martinson
DMP Market Analyst

Yeah, thank you. Maybe a last question. Trump seemed to win the election and has promised a lot in U.S. civil. Have you made any assessments of what that can impact U.S. markets, given that he seems now to be the president?

speaker
Anders Danielsson
President & CEO of Skanska

We don't expect any change in the market. The infrastructure program that runs have been went through the congress back in 2021. That was aligned, there were republicans and democrats were aligned in that they are in line in you know continue to invest in infrastructure so we we don't expect any change in the market we believe it's going to be a strong market for the next 12 months at least thank you those were all my questions

speaker
Antonia Ljunelind
Senior Vice President, Investor Relations at Skanska

Thank you, Simon. And we have a few more callers that are waiting in queue. And may I please ask you to limit the number of questions to two to start with? And then if you have more questions, you can join the line again and we will get back to you if we have time for that. So thank you. Operator, may you please introduce the next caller?

speaker
Operator
Conference Operator

Yeah, sure. The next question comes from Graham Hunt from Jefferies. Please go ahead.

speaker
Graham Hunt
Jefferies Analyst

Yeah, thanks very much. I'll focus my questions actually on the UK. I appreciate it. Relatively small, but a little troublesome on the block lock side still. Are you able to help us understand how big that business is now? You've taken a lot of impairments, you've downsized the business, but can you help us try and put a floor? I appreciate you've taken all of what you can see in this quarter, but how big is the exposure now? What's the maximum envelope of risk? um and then second question on the uk again we've now seen the autumn budget you left your outlook for the region the same on civils and buildings but are you seeing any kind of improvement on the back of that budget which i think did commit a little bit more investment in infrastructure and spend and support thanks those are my two

speaker
Anders Danielsson
President & CEO of Skanska

Thank you, Graham. I can start. The Bukluko operation in the UK is very limited. It's just a couple of ongoing projects, so limited exposure, I would say. Of course it's positive to see that the government wants to invest in infrastructure. It remains to be seen when it's coming out to the market. My experience is this takes some time before decisions are taken for specific projects that have to be designed and then procured out in the market.

speaker
Moderator
Conference Moderator

it is uh encouraging to see the those signs uh anyway thank you next question comes from Arnold Lehman from Bank of America please go ahead uh thank you very much I have two questions please firstly uh on commercial development I think in your introduction you mentioned that the The gains came from reversal of provisions rather than the disposal. I think you sold one office building in Norway in the quarter. Are you implying that you didn't make a significant profit on this disposal? That's my first question. And my second question is on the positive effect from working capital in the quarter that is clearly helping cash flow generation. Can you give us a little bit of color on this movement? Thank you. Thank you.

speaker
Pontus Winkvist
Acting Group CFO of Skanska

To start with, regarding the profit on divestments within CD, I think your assumptions are relatively correct. It was not a big profit coming out from that disposal that we made during the quarter. So the majority of the gain there is coming from, you can say, older divestments. And then regarding the working capital in construction, as I said earlier, I think it was a very strong quarter. We have seen on a couple of projects that there had been mobilization payments, which means actually... that the client are paying us, I mean, to start up the projects. And then when we are starting up the projects, we are starting to use that money in order to buy equipment, etc. And that will then consume a part of that positive development of the working capital. Having said that, I mean, normally the fourth quarter is also quite strong seasonally when it comes to working capital development. Thank you very much.

speaker
Operator
Conference Operator

The next question comes from Markus Henriksson from ABG Sandal. Please go ahead.

speaker
Markus Henriksson
ABG Sandal Analyst

Thank you very much. Two questions for me as well. I'll start off with us construction and civil if we view into 25 and 26 and given your available resources at unmanned power etc how long can you keep up this high activity in order to take without them and then during project margins getting into poorer project management thank you and the second one it's a follow-up on housing starts i think you're very clear here that you intend to increase starts going forward you're currently at around thousand starts on a rolling 12-month basis. Does that imply that you're aiming at a clear increase for 2025 versus where we are on a rolling 12-month basis? Thank you.

speaker
Anders Danielsson
President & CEO of Skanska

Thank you. Fair question regarding US Civil. We are very selective on the market. We only go for projects where we see that we have the right team in place, that we have the right resources and also the right subcontractors. So we are not compromising with that. But it's also this has been extremely inflation in the market. So a lot of this increase we can see has been cost increases, not necessarily requiring more resources on sites. So I'm confident that we have this under control. It's something we always discuss before we bid for any project in the US or elsewhere. We go through, do you have the resources in place? And do you have the team in place? Others, there's no bid. No team, no bid. We don't compromise with that. so i don't expect the mod we will go into the wrong project for that uh we don't chasing volume there there's not it's still profitability before profit before volume that's the my main message in

speaker
Pontus Winkvist
Acting Group CFO of Skanska

Can you take the other one? Regarding the housing starts, yes, as we said, we are looking to start more projects within residential development. We don't like to give any forecasts on the actual volume. And also here, I think every project will be tried and tested from its specifics. But we will see that we are having projects in the pipeline that is likely to start during the coming quarters. Then, of course, it can be a little bit bumpy exactly when they come and where they come.

speaker
Operator
Conference Operator

Thank you. The next question comes from Gregor Koglic from UBS. Please go ahead.

speaker
Gregor Koglic
UBS Analyst

Hi, good morning. So I've got two questions on working capital. Sorry to come back to that. I don't know if you have an updated view. I appreciate Q3 sort of had a strong inflow, but what sort of your best estimate is of a normalized ratio of that free working capital? I think we're sort of 17% or something like that today. And then coming sort of back to new projects, sounds a bit like you're looking at residential. You just answered a bit of ramp up again. Not sure really about commercial, but can you just remind us what the sort of margin and return on capital criteria are for you to start new projects so we can sort of think about perhaps a medium-term recovery of earnings in those segments? Thank you.

speaker
Pontus Winkvist
Acting Group CFO of Skanska

Yes. Hi. Starting with the working capital development, I mean, you say 17%. We are at 17.4% right now. I mean, of course, it's also here depending long term on what is the cost of capital, how will the working capital development and how... How will our customers view the cost of capital? But I mean, we are on high levels right now, but we are not giving any forecast. But I mean, you can look into the history and I mean, you see that there is some kind of fluctuation and that's likely to be that also going forward. Regarding the RD business, you can say that we are expecting RD to deliver a 10% return on capital employed and a 10% on operating margin. That's what we would like to have when we are starting new projects.

speaker
Anders Danielsson
President & CEO of Skanska

Similarly for CD? Yes, yes, yes. Same target.

speaker
Pontus Winkvist
Acting Group CFO of Skanska

Same return on capital. I mean, we don't have an EBIT margin on CD, but the return on capital employed is the same.

speaker
Gregor Koglic
UBS Analyst

Thank you.

speaker
Antonia Ljunelind
Senior Vice President, Investor Relations at Skanska

Thank you. And I will turn one last time to the operator. From my point of view, it looks like we've gotten to the end of the queue of questions. Have you got any other input for us? There are no further questions at this time. Thank you. So that means that we've answered all the questions that you had for us here today. So I will then thank Anders and Pontus for your participation here. And I will thank you that have joined us here in the studio in Stockholm. And lastly, I would say thank you to those of you that have been watching online. A recorded version of this broadcast will be available on our webpage shortly after this. So thank you and see you back here in the studio in February for our fourth quarter report. Have a good day.

Disclaimer

This conference call transcript was computer generated and almost certianly contains errors. This transcript is provided for information purposes only.EarningsCall, LLC makes no representation about the accuracy of the aforementioned transcript, and you are cautioned not to place undue reliance on the information provided by the transcript.

-

-