spk00: Good morning, ladies and gentlemen, and welcome to the Mountain Providence Diamonds, Inc. First Quarter 2021 Earnings Conference Call. At this time, all lines are in listen-only mode. Following the presentation, we will conduct a question and answer session. If at any time during this call you require immediate assistance, please press star zero for the operator. This call is being recorded on Thursday, May 13, 2021. I would now like to turn the conference over to Stuart Brown, President and CEO. Please go ahead.
spk01: Thank you very much, and good day to everyone, and thank you for those that have dialed in to the call today. Before I carry on, just a reminder of everyone on the forward-looking statement information. If you took note of that, it's your convenience. And then just probably follow the usual format with Perry and I covering the first part of the presentation, and then we'll have Reid talk to us about the market, which, pleasingly to say, is doing very well. As a general comment, taking off from our last call, tough 2020, where we had a big impact on sales, production, obviously that translates into a cash impact. We've moved into 2021, where the sales markets have reopened. We're doing very well on sales when we have diamonds. Prices have all come back, and I think you'll hear a lot more on the price in the market from Reid, so I won't repeat anything he's about to say. But what we obviously had is a very difficult 21 first quarter from the COVID issues with the mine closing. And that's the theme throughout the announcement. So everything's related to that. I think we can deal with a lot of the COVID and I will touch on what's happened on site. But I think we are in a situation now where mine production is going very well in terms of the tonnage through the plant and the carrots are starting to flow and we've got a plan to catch up the deficit as best we can by the year end, and I'll expand more on that later. Before I hand over to Perry, I'd like to touch on the market, and looking through the market headlines over the last three days, I was particularly struck by how positive they were, and there's just five I will touch on briefly, just so that we can have some evidence of confidence, and back that confidence up by sort of third-party data, as it were. First article I was looking at was U.S. sales for April have tripled. I think as we're seeing the general economic activity of the world restart as everyone emerges from the crisis and recognizing some people are still going through the crisis in different levels, but the big markets for diamonds in the U.S. and China are very strong at the moment. We've seen Israel just announce that they've had exports soar over the last quarter. manufacturing equipment of diamond manufacturing equipment sales are taking off. The U.S. diamond trade itself, so the rough imports have reached a 22-month high, highest import level since May 2019. That also augurs well for our industry. Hong Kong, which has obviously gone through some difficulties, imports have risen 47% year-on-year from 2020. is still to get to the 2019 levels there, but it's a really good sign that they're picking up on the rough, I mean, on the polished imports. So when I take all of that into context and I put it into what we're doing with our sales and what we expect on price and how we see the rest of the year flying with cash, a lot more confidence that has been building since, you know, late last year. Anyway, we'll touch more on these points later. And without further ado, if I could hand over, sorry, before I do that, I'll just, Notice I'm going to talk on the COVID issue. So on the safety front on the mine, we've obviously spent 2020 doing very well, but we obviously had a failure in 2021 where we had one positive case that rapidly became two, and that causes an outbreak, and then we had to close the mine. It was all in conjunction with working with the health people in the Northwest Territories, and I think it was the right thing to do. We had no choice. Obviously, the impact on production was severe with a 22-day shutdown, but we've managed to restart. The effects of moving people off and moving people back on is we've revised all the protocols. We went looking at what we could improve. And pleasingly, a lot of things have changed. But still, we need the people that we have working for us to get back to site. And we're nearly back to full steam. We also launched our vaccination program in conjunction with the government. And at this stage, we've got 83% of the workforce has received at least their first dose. Many people have received two doses and as the ships change we'll catch up with that. We've got another session coming towards the end of the month and some people are having their vaccinations while they're off site and having vaccinations on site. So I think we're making good progress there. We're now back up on our feet and at full production levels through the plant as I said earlier. So I think we hope to maintain this for the rest of the year and That's why we've finally been able to put a plan together with De Beers on guidance. Again, we'll touch on that a few slides on. So now I can hand over to Perry to discuss the first quarter production and the financials. Thank you.
spk06: Thank you, Stuart. Good morning, everyone. I'll just mention that all production stats I'm going to refer to are on a 100% basis, unless otherwise noted. and financial figures, I quote, will be in Canadian dollars, unless otherwise noted. We have changed the format a bit of our presentation, so if slide five gives us a little production stats, the same information you'll see in our MD&A, so I'm not going to spend a lot of time on that. So we could just move forward to slide six, which basically shows the same information over the trailing five quarters. So just to give you a view of how we performed in the quarter relative to all the quarters last year, most of which were also under COVID conditions. So obviously the big event for the quarter, unfortunately for us, was the 22-day shutdown. Just looking at it from a production standpoint, I mean, we had a 22-day stand down where we had no mining and processing operations. If you look at our total ore and waste tons moved, we were actually down about 40% versus planned about 45% given we moved 5.6 million tons. So, you know, 22 days out of a 91-day quarter is roughly, you know, a quarter of the quarter. But our actual production was, in terms of tonnage moves, was... More effective than that, so in terms of giving you some color for that, the main reasons were reduced workforce availability prior to the outbreak being formally declared. We had a number of people in contact tracing and self-isolation. That started to reduce production. And then just on the restart, it did take time to reassemble our staff and get up to closer to full crew complements. We also had a difficult restart in terms of the mobile equipment. March proved to be exceptionally cold, so we had a number of mechanical breakdowns upon restart and reduced equipment availability. So that's why, if you look at, I guess, more waste tons mined versus tons treated, tons treated processed plant was actually less affected. We processed 626,000 tons, which was only about a 15% drop off from Q4 and about 20% to 25% versus the other quarters in 2020. So I'd say mine production was more affected, processing plant production was less affected. And on a positive note, we did process a relatively high grade of 2.22 carats per ton. CARES were covered were even less affected than the other metrics. So moving ahead from production to our financial highlights, you see on slide seven just again gives a high-level summary. So in terms of revenue, we recorded 54 million Canadian dollars in revenue from the sale of 3,000 carrots at US $71 a carrot. This is slightly lower than the 659,000 carrots sold in the same period in 2020, $75 a carrot. Obviously, the production impact in February didn't have any impact on our Q1 sales. That production was sourced from fourth quarter 2020 and very early 2021. So in terms of financial metrics, our adjusted EBITDA was $19 million, fairly similar to the same period last year. Our adjusted EBITDA margin was 35%, and we did report positive net income of $7.3 million. approximately $5 million of which was a result of unrealized foreign exchange gains on the strengthening Canadian dollar. I did want to touch on the Canadian dollar a little bit. During the quarter, there was a bit of a strengthening from kind of the 127 range to the 126 range. Just since then, you know, in the five weeks since, We've seen a significant strengthening of the Canadian dollar all the way down to the $1.21 level, so a further $0.05 strengthening. I just want to note that this is a bit of a headwind for us, so we do obviously keep a close eye on the Canadian dollar since nearly all of our operating costs are Canadian-dominated. Slipping ahead to slide eight, just touching on our liquidity. We ended the quarter with roughly $14 million cash versus, which obviously reflects the two sales that we conducted. And as well, we had a further sale in April that went well. And you obviously saw, we did announce today an additional $33 million term loan facility as an extension of the existing Doombridge first lien facility standing. So that will provide us the additional liquidity we need given that we've canceled our May diamond sale in Antwerp given the February shutdown. So we expect to... draw down the $33 million from the term loan during the second quarter and repay a portion of that fairly immediately in the third quarter following our June sale. And then we expect to repay the remainder over the course of 2021. I'll touch a little bit on our production costs there in the quarter. Our reported cash costs per ton treated, including capitalized drifting, was $139 per carat. Obviously, that was impacted by the COVID shutdown. Obviously, fewer tons put through the plant. And, you know, we did have some elevated costs. as well from the fourth quarter that kind of flowed through. Obviously, on a per-carat basis, the increase was a little bit less given a higher level of grade during the quarter. So, I think with that, I'll turn the presentation back to Stuart to discuss our forward-looking guidance.
spk04: Thanks, Perry.
spk01: So if we put the guidance into context, and the reason for not issuing guidance has obviously been the COVID issues we've been dealing with. I'm on slide 10 at the moment. And it's been really difficult to get a steady workforce with all the protocols we have in place and the certainty of who will arrive and who will not arrive. Our focus has been, can we keep the ore going through the plant? That has been really the core change and what we've had to change in the stripping to make sure we can expose enough ore I think between the whole of last year, we've been dealing with this for about a year now and into 2021, we managed to achieve that. So, pleasingly, we were lower on probably total mine tons for the year, probably pretty similar to last year. Where I'm more confident is on the mine that we have exposed enough ore that we should be treating about or recovering about 3.3 to 3.5 million tons of or, and that goes on combined with our stockpile balance, we'll be able to manage the stockpile and we expect to treat between 3.1 to 3.3 million tons. And I'll touch on the grade in a minute on that. Just on the bottom there, our carat guidance is actually 6.3 to 6.5 million carats. That's really somewhere in the middle of that towards the upper end, not the six that it says there. We should have picked that up earlier. What we've faced with this deficit, obviously we lost quite a lot of carrots, and then we immediately looked at how could we get them back? How hard can we run the plant? How much oil can we push through the plant? And we've done all of the work, and our best option right now, looking at the way the market's performing and the demand for sort of diamonds, is by come the end of May, we're going to be transitioning the plant back from the 0.8 millimeter cutoff to 1.1 millimeter cutoff. This will allow us to increase the tonnage throughput through the plant. We will discard the very, very fine diamonds that we get, the very low value. Obviously beneficial if you can recover them, but we can't treat the volume of ore to make up that deficit. So we'll get pretty close to what we recovered last year, close to 6.5 million carats if we can achieve that. But these will be what I would call more valuable carrots because we're getting more of the higher value carrots coming through. So that's taken us the last sort of three months to work on all of these scenarios. We had about nine scenarios. We've got flexibility to change the plant back from 1.1 millimeter cutoff at any stage should we see any other changes and things like that. But at the moment, comfortable where we are here. I'll hand back to Perry just to discuss through the costs and how that's going to impact us.
spk06: Sure. Sounds good, Stuart. So just on slide 11, in terms of the cost guidance, we are guiding production costs per ton created in the $125 to $135 per ton Canadian range. So if you look back, 2019 and 2020, we came in both years at $103 per ton, so it's This represents about a 30% increase. I would caution, you know, 2019 in terms, you know, we put in, we put through a lot of tons through the plants, 3.6 million tons. 2020, you know, in terms of overall tonnage, we came in at 3.25, which is, you know, where we hope to get this year. In 2020, we were able to, you know, as Stuart mentioned earlier, we were able to take evasive actions and defer as many of the costs as possible into 2021 and future years. Obviously, you know, you can't defer costs forever. And so, you know, we are picking up some of those costs deferred from last year. And as well, we qualified for the Canadian Emergency Wage Subsidy last year, and that provides significant benefits, over $15 million Canadian on a 100% basis. So that had, you know, roughly at least a $5 per ton impact as well, the benefit of which we don't believe we will receive in 2021. So that's just in terms of baseline. We do recognize that we still have beyond that significantly elevated cost forecast for this year. To try to break it down, I'd say roughly half of those higher costs are attributable to the February shutdown. Other than saving a little bit in terms of not running the fleet, in terms of diesel fuel, we pretty much still incurred our full cost for February, even though we had no production. So we still needed over 100 people at the mine to keep it running, receive the winter road supplies. We incurred significant costs, putting people into isolation to deal with the COVID issue. and other direct costs relating to the COVID outbreak. So that's about half of it. I'd say the other half, you can attribute it to a mix of factors, including higher diesel prices from this year's winter road supply compared to last year. Part of that effect is due to the exchange rates, with diesel being predominantly U.S. dollar-denominated inputs. As I mentioned earlier, we won't receive the wage subsidy this year. And then, you know, a slight decrease in anticipated tonnage. So all those things combined, you know, translate to about a $30 per ton increase. In terms of the per carat side, a little bit less affected, again, because of higher forecasted grades for 2021 versus 2020. And just in terms of sustaining capex, it's coming in, we forecast at $21 million Canadian. Again, working hard with the beers to focus on the essentials, on what we need for the mine. So this number is probably, we've shaved down a few million off of what it was originally. So that's it, off guidance. And I think I'll turn it over to Reid Mackey, on the diamond market.
spk05: Thank you, Perry. The first quarter saw continued recovery to our price growth that commenced in H2 of last year. On a total average dollar per carat basis, including effects of mix, this has recovered to pre-pandemic levels. On a like-for-like basis, though, our rough diamond price book has now surpassed the levels seen before the pandemic. Moving on to slide 13, Consistent with what's been reported in the diamond market, our price performance is particularly strong in the larger and better quality goods, though price growth for our smaller goods are expected to follow suit during H2. Demand at our rough tenders continue to be robust. We've seen continued interest across all product segments with our top customers continuing to perform well and a number of new companies winning their first mountain goods. We're looking forward to a continuation of this trend at our next upcoming sale in early June. On a more macro industry level, we are seeing that demand and supply are now more imbalanced, and in some segments, demand is outstripping supply. We saw this supported during the first quarter as major rough producers like El Rosa report considerable drawdowns to the pandemic-driven stockpiles. Further downstream, polish prices have continued to increase. And long-term demand for diamond jewelry is expected to exceed supply, as was touched on by Stuart early on in the presentation. We're confident that demand and prices for rough diamonds will remain positive through 2021. And with that, I'll hand it back over to Stuart.
spk01: Thanks, Reid, and thank you, Perry. So just briefly in conclusion, the first two points on slide 14, obviously for us now, the focus, we've just taken on the short-term loan to bridge our liquidity gap. Is it because of COVID? We've still got COVID issues that we deal with, and we've got more policies and procedures than we know what to do with to deal with that. So we're very vigilant about that. The vaccination program is certainly helping and giving us more confidence that we know what to do and we can maintain production. We've got to achieve the cash flow for 2021. The problem with losing production over a three-week period, it does take us the rest of the year to make that production up, hence the spread of that cash flow and repayment of the debt. So we're confident we can achieve that based on all of the diamond pricing information that Reid just shared with you and I was speaking about earlier. So we maintain production, we will get the diamonds, we will sell them, and we think prices will increase as demand increases. That then leaves us with how do we optimize the life of mine plan because we've got the short-term debt to deal with as well as everyone keeps asking me what are we doing about the long-term debt. And for that, We've got two issues to deal with. One is, can we optimize the current mine plan? Increasingly, we're doing that. For the first time later this year, we'll be incorporating the Wilson kimberlite into the mine, which we didn't previously have. We've got some work to do on that, and that should have a good positive effect after the negative news that we delivered last quarter on Tuzo. We're also expecting to see prices for Tuzo goods increase. But that does remain a future prediction, so we've got to optimize that. And then turning to the Kennedy assets, we're in the phase of completing some desktop work. We're hard at work getting ready to do what we would call our pre-planning for all the permitting work that we would need to put in place. It's a long, arduous process to go through, so we don't want that to slip at all. And at some stage, we will be ready to deliver a view on the Kennedy assets, but we've still got quite a lot of work to complete on those. So that's the work that's keeping us busy in the long term. The short term is getting the mine back up and running at full speed and trying to push as many tons as we can through the plant. And pleasingly, we have access to the ore that we can do that. So with that, I'll conclude, and we'll take some questions briefly if we have any. Thank you.
spk00: Thank you. Ladies and gentlemen, we will now begin the question and answer session. Should you have a question, please press star followed by 1 on your touchtone phone. You will hear a three-tone prompt acknowledging your request, and your questions will be polled in the order they are received. Should you wish to decline from the polling process, please press star followed by 2. If you are using a speakerphone, please lift the handset before pressing any keys. Again, as a reminder, should you have a question, please press star 1 on your touchtone phone.
spk03: Your first question comes from Paul Zimke.
spk00: Paul, please go ahead.
spk02: Hi. Reid, I guess I have one for you. Could you provide maybe some more color on the new customers that you're seeing participating in the tenders? I mean, do you think this is more temporary while there are shortages in the market, or do you think these are going to be more consistent buyers going forward?
spk05: Yeah, no, it's not a short-term thing. There is definitely – we are seeing some – Some players that are closer down to the retail interface coming back up the pipeline to try to access Polish as there are gaps developing in the retail markets or close in the B2C markets and the Polish market. But the new customers are mainly people that are companies that are taking positions more for the medium to long term trying to satisfy origin-based promotional projects that they have in place, and we're seeing a growing amount of interest in origin-based marketing. So these are companies that have been following Mountain Province, understanding the product, the unique attributes of the product, and have decided to take a position for more of the long term. So And since the market has reopened in H2, they've slowly but surely been making their way through the product profile and finding the goods that fit their needs. And we're now starting to see them compete in a more meaningful way in 2021.
spk02: That's great to hear. And Stuart, maybe one on the cutoff. I think it was in early 2019 that you guys were talking about raising the cutoff to you know, one and a quarter from one millimeter. Now you're talking about raising it to 1.1 from 0.8. Did it ever reach that 1.25 and then you brought it back down and now you're raising it back up? Or could you maybe provide any more detail on that?
spk01: Yeah, sure. Thanks, Paul. So, yeah, in 2019, you're quite correct. We did look at it late 2018. We started thinking about it and introduced it during 2019. but just always was 0.8, Paul. And we moved it to 1.1 in 2019, which is when we hit that record with the tonnage. That's why we could do 3.6 million tons. So we got the blending right, we got the cutoff right, and that worked. We then sort of started blending and smoothing the ore because we couldn't sustainably mine 3.6 million tons for 2020 and 21. We would have run out of ore. very early on in 2021. We've dropped the tonnage profile. In doing that, we were able to put the 0.8 millimeter screens back because there's no point in discarding diamonds if you can't push the tonnage through. That was why we've gone back to the 0.8 and we've re-looked at it now as one of the options. If we were to keep the plant at 0.8 right now, we wouldn't be able to get close to 3.25 million tons for the year. so we'd be somewhat close to the three. By putting the screens back now in the short term, I stress we're not necessarily going to do this for the rest of the mine life. We'll be able to push the tonnage up again. It's a short-term intervention. It does have immediate impact, and it's positive on the revenue side, on the average value side. We were at 0.8. We went to 1.1. We reverted back to 0.8. through a combination of changes throughout 2020. And then in 21, we're going to be going back from 1.1 to, from 0.8 to 1.1 millimeters.
spk02: Okay, that makes sense. Understood. Thank you very much.
spk00: Thank you. Ladies and gentlemen, as a reminder, should you have a question, please press star 1 on your touchtone phone.
spk03: I've got some questions coming on the webcast.
spk04: Perry, there's one coming on from, how much is the capital of stripping this year in dollar terms?
spk06: In dollar terms, I'll have to confirm that number, Stuart, but I believe I have to take that offline, but I believe it's in the order of $60 to $70 million for our share. Yeah.
spk04: Sounds about right. It's only about $120 million in total.
spk01: That's the figure I remember. I've got a call, a question from Paul Bonham. All goes well with the county. How long do you estimate the product production stage? Paul, in general, if you're still listening, the primating process takes, if everything goes well, around five years. So obviously we'd look to try and improve that where we can. But working on that, we'd be looking at around 2026. We've got another question on the grade decrease with the bottom screen. That's quite easy. We're currently running at about average grade for this year, budgeted 2.1. We've run the last quarter, as you've seen, at 2.2. We've been in a very high-grade area, which has been really helpful in catching up. We estimate the grade for the year will probably be around about 2 carats per ton. So we'll go from 2.1 down to 2.2.
spk03: to answer that question from Brooke. I've got no more written questions coming through.
spk01: So if there's no other questions... There are no further questions on the phone line. Thanks very much. Thank you very much for those who've dialed in, and we'll be speaking to you shortly, no doubt. Thank you.
spk00: Thank you. Ladies and gentlemen, this concludes your conference call for today. We thank you for participating and ask that you please disconnect your lines.
Disclaimer

This conference call transcript was computer generated and almost certianly contains errors. This transcript is provided for information purposes only.EarningsCall, LLC makes no representation about the accuracy of the aforementioned transcript, and you are cautioned not to place undue reliance on the information provided by the transcript.

-

-